메뉴 건너뛰기




Volumn 68, Issue 5-8, 2013, Pages 1851-1865

Decision models of closed-loop supply chain with remanufacturing under hybrid dual-channel collection

Author keywords

Channel coordination; Closed loop supply chain; Game theory; Profit sharing; Remanufacturing; Reverse channel structure

Indexed keywords

GAME THEORY; PROFITABILITY; SALES; SUPPLY CHAINS; WAGES;

EID: 84888318290     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-013-4982-1     Document Type: Article
Times cited : (160)

References (39)
  • 1
    • 79955643668 scopus 로고    scopus 로고
    • A capacitated production planning problem for closed-loop supply chain with remanufacturing
    • 10.1007/s00170-010-2948-0
    • Zhang J, Liu X, Tu YL (2011) A capacitated production planning problem for closed-loop supply chain with remanufacturing. Int J Adv Manuf Technol 54:757-766
    • (2011) Int J Adv Manuf Technol , vol.54 , pp. 757-766
    • Zhang, J.1    Liu, X.2    Tu, Y.L.3
  • 2
    • 0032657920 scopus 로고    scopus 로고
    • A closed-loop logistics model for remanufacturing
    • Jayaraman V, Guide VDR, Srivastava R (1999) A closed-loop logistics model for remanufacturing. J Oper Res Soc 50(5):497-508
    • (1999) J Oper Res Soc , vol.50 , Issue.5 , pp. 497-508
    • Jayaraman, V.1    Guide, V.D.R.2    Srivastava, R.3
  • 3
    • 77956228331 scopus 로고    scopus 로고
    • A multi-echelon reverse logistics network design for product recovery - A case of truck tire remanufacturing
    • 10.1007/s00170-009-2470-4
    • Sasikumar P, Kannan G, Haq AN (2010) A multi-echelon reverse logistics network design for product recovery - a case of truck tire remanufacturing. Int J Adv Manuf Technol 49:1223-1234
    • (2010) Int J Adv Manuf Technol , vol.49 , pp. 1223-1234
    • Sasikumar, P.1    Kannan, G.2    Haq, A.N.3
  • 4
    • 33749356646 scopus 로고    scopus 로고
    • The effect of competition on recovery strategies
    • 10.1111/j.1937-5956.2006.tb00250.x
    • Ferguson ME, Toktay LB (2006) The effect of competition on recovery strategies. Prod Oper Manag 15(3):351-368
    • (2006) Prod Oper Manag , vol.15 , Issue.3 , pp. 351-368
    • Ferguson, M.E.1    Toktay, L.B.2
  • 5
    • 1642269093 scopus 로고    scopus 로고
    • Closed-loop supply chain models with product remanufacturing
    • 10.1287/mnsc.1030.0186
    • Savaskan RC, Bhattacharya S, Van Wassenhove LN (2004) Closed-loop supply chain models with product remanufacturing. Manag Sci 50(2):239-252
    • (2004) Manag Sci , vol.50 , Issue.2 , pp. 239-252
    • Savaskan, R.C.1    Bhattacharya, S.2    Van Wassenhove, L.N.3
  • 6
    • 33644518981 scopus 로고    scopus 로고
    • Reverse channel design: The case of competing retailers
    • 10.1287/mnsc.1050.0454
    • Savaskan RC, Van Wassenhove LN (2006) Reverse channel design: the case of competing retailers. Manag Sci 52(1):1-14
    • (2006) Manag Sci , vol.52 , Issue.1 , pp. 1-14
    • Savaskan, R.C.1    Van Wassenhove, L.N.2
  • 7
    • 0346433511 scopus 로고    scopus 로고
    • Matching demand and supply to maximize profits from remanufacturing
    • 10.1287/msom.5.4.303.24883
    • Guide VDR, Teunter RH, Van Wassenhove LN (2003) Matching demand and supply to maximize profits from remanufacturing. Manuf Serv Oper Manag 5(4):303-316
    • (2003) Manuf Serv Oper Manag , vol.5 , Issue.4 , pp. 303-316
    • Guide, V.D.R.1    Teunter, R.H.2    Van Wassenhove, L.N.3
  • 8
    • 25144508876 scopus 로고    scopus 로고
    • Market segmentation and product technology selection for remanufacturable products
    • 10.1287/mnsc.1050.0369
    • Debo LG, Toktay LB, Van Wassenhove LN (2005) Market segmentation and product technology selection for remanufacturable products. Manag Sci 51(8):1193-1205
    • (2005) Manag Sci , vol.51 , Issue.8 , pp. 1193-1205
    • Debo, L.G.1    Toktay, L.B.2    Van Wassenhove, L.N.3
  • 9
    • 33846211233 scopus 로고    scopus 로고
    • Effects of random yield in remanufacturing with price-sensitive supply and demand
    • 10.1111/j.1937-5956.2006.tb00254.x
    • Bakal IS, Akcali E (2006) Effects of random yield in remanufacturing with price-sensitive supply and demand. Prod Oper Manag 15(3):407-420
    • (2006) Prod Oper Manag , vol.15 , Issue.3 , pp. 407-420
    • Bakal, I.S.1    Akcali, E.2
  • 10
    • 33644537032 scopus 로고    scopus 로고
    • Managing new and remanufactured products
    • 10.1287/mnsc.1050.0465
    • Ferrer G, Swaminathan JM (2006) Managing new and remanufactured products. Manag Sci 52(1):15-26
    • (2006) Manag Sci , vol.52 , Issue.1 , pp. 15-26
    • Ferrer, G.1    Swaminathan, J.M.2
  • 11
    • 70350741231 scopus 로고    scopus 로고
    • Managing new and differentiated remanufactured products
    • 10.1016/j.ejor.2009.08.007
    • Ferrer G, Swaminathan JM (2010) Managing new and differentiated remanufactured products. Eur J Oper Res 203(2):370-379
    • (2010) Eur J Oper Res , vol.203 , Issue.2 , pp. 370-379
    • Ferrer, G.1    Swaminathan, J.M.2
  • 12
    • 53249155082 scopus 로고    scopus 로고
    • Pricing used products for remanufacturing
    • 2463273 10.1016/j.ejor.2007.11.029
    • Liang Y, Pokharel S, Lim GH (2009) Pricing used products for remanufacturing. Eur J Oper Res 193(2):390-395
    • (2009) Eur J Oper Res , vol.193 , Issue.2 , pp. 390-395
    • Liang, Y.1    Pokharel, S.2    Lim, G.H.3
  • 13
    • 79958803659 scopus 로고    scopus 로고
    • Competition and cooperation in a remanufacturing system with take-back requirement
    • 10.1007/s10845-009-0300-z
    • Jung KS, Hwang H (2011) Competition and cooperation in a remanufacturing system with take-back requirement. J Intell Manuf 22(3):427-433
    • (2011) J Intell Manuf , vol.22 , Issue.3 , pp. 427-433
    • Jung, K.S.1    Hwang, H.2
  • 14
    • 78650516234 scopus 로고    scopus 로고
    • Coordinating production and recycling decisions with stochastic demand and return
    • 10.1007/s11518-010-5147-5
    • Shi J, Zhang G, Sha J, Amin SH (2010) Coordinating production and recycling decisions with stochastic demand and return. J Syst Sci Syst Eng 19(4):385-407
    • (2010) J Syst Sci Syst Eng , vol.19 , Issue.4 , pp. 385-407
    • Shi, J.1    Zhang, G.2    Sha, J.3    Amin, S.H.4
  • 15
    • 79956188582 scopus 로고    scopus 로고
    • Optimal production and pricing policy for a closed loop system
    • 2776257 10.1016/j.resconrec.2010.05.016
    • Shi J, Zhang G, Sha J (2011) Optimal production and pricing policy for a closed loop system. Resour Conserv Recycl 55(6):639-647
    • (2011) Resour Conserv Recycl , vol.55 , Issue.6 , pp. 639-647
    • Shi, J.1    Zhang, G.2    Sha, J.3
  • 16
    • 77957311584 scopus 로고    scopus 로고
    • Optimal production planning for a multi-product closed loop system with uncertain demand and return
    • 2726160 10.1016/j.cor.2010.08.008
    • Shi J, Zhang G, Sha J (2011) Optimal production planning for a multi-product closed loop system with uncertain demand and return. Comput Oper Res 38(3):641-650
    • (2011) Comput Oper Res , vol.38 , Issue.3 , pp. 641-650
    • Shi, J.1    Zhang, G.2    Sha, J.3
  • 17
    • 61449118693 scopus 로고    scopus 로고
    • The evolution of closed-loop supply chain research
    • 10.1287/opre.1080.0628
    • Guide VDR, Van Wassenhove LN (2009) The evolution of closed-loop supply chain research. Oper Res 57(1):10-18
    • (2009) Oper Res , vol.57 , Issue.1 , pp. 10-18
    • Guide, V.D.R.1    Van Wassenhove, L.N.2
  • 18
    • 55349133787 scopus 로고    scopus 로고
    • Importance of closed-loop supply chain relationships for product remanufacturing
    • 10.1016/j.ijpe.2008.02.020
    • Östlin J, Sundin E, Björkman M (2008) Importance of closed-loop supply chain relationships for product remanufacturing. Int J Prod Econ 115(2):336-348
    • (2008) Int J Prod Econ , vol.115 , Issue.2 , pp. 336-348
    • Östlin, J.1    Sundin, E.2    Björkman, M.3
  • 19
    • 77952290599 scopus 로고    scopus 로고
    • Environmental and economical sustainability of WEEE closed-loop supply chains with recycling: A system dynamics analysis
    • 10.1007/s00170-009-2362-7
    • Georgiadis P, Besiou M (2010) Environmental and economical sustainability of WEEE closed-loop supply chains with recycling: a system dynamics analysis. Int J Adv Manuf Technol 47:475-493
    • (2010) Int J Adv Manuf Technol , vol.47 , pp. 475-493
    • Georgiadis, P.1    Besiou, M.2
  • 20
    • 0038966292 scopus 로고    scopus 로고
    • Competition in remanufacturing
    • 10.1111/j.1937-5956.2001.tb00074.x
    • Majumder P, Groenevelt H (2001) Competition in remanufacturing. Prod Oper Manag 10(2):125-141
    • (2001) Prod Oper Manag , vol.10 , Issue.2 , pp. 125-141
    • Majumder, P.1    Groenevelt, H.2
  • 21
    • 10444257263 scopus 로고    scopus 로고
    • Competitive advantage through take-back of used products
    • 10.1016/j.ejor.2003.11.008
    • Heese HS, Cattani K, Ferrer G, Gilland W, Roth AV (2005) Competitive advantage through take-back of used products. Eur J Oper Res 164(1):143-157
    • (2005) Eur J Oper Res , vol.164 , Issue.1 , pp. 143-157
    • Heese, H.S.1    Cattani, K.2    Ferrer, G.3    Gilland, W.4    Roth, A.V.5
  • 22
    • 78650414341 scopus 로고    scopus 로고
    • Optimal core acquisition and remanufacturing policies under uncertain core quality fractions
    • 10.1016/j.ejor.2010.06.015
    • Teunter RH, Flapper SDP (2011) Optimal core acquisition and remanufacturing policies under uncertain core quality fractions. Eur J Oper Res 210(2):314-322
    • (2011) Eur J Oper Res , vol.210 , Issue.2 , pp. 314-322
    • Teunter, R.H.1    Flapper, S.D.P.2
  • 23
    • 33846325135 scopus 로고    scopus 로고
    • Optimal acquisition and sorting policies for remanufacturing
    • 10.1111/j.1937-5956.2006.tb00252.x
    • Galbreth MR, Blackburn JD (2006) Optimal acquisition and sorting policies for remanufacturing. Prod Oper Manag 15(3):384-392
    • (2006) Prod Oper Manag , vol.15 , Issue.3 , pp. 384-392
    • Galbreth, M.R.1    Blackburn, J.D.2
  • 24
    • 80755143170 scopus 로고    scopus 로고
    • The co-opetitive strategy of a closed-loop supply chain with remanufacturing
    • 10.1016/j.tre.2011.10.001
    • Chen JM, Chang CI (2012) The co-opetitive strategy of a closed-loop supply chain with remanufacturing. Transp Res Part E Logist Transp Rev 48(2):387-400
    • (2012) Transp Res Part e Logist Transp Rev , vol.48 , Issue.2 , pp. 387-400
    • Chen, J.M.1    Chang, C.I.2
  • 25
    • 84875472551 scopus 로고    scopus 로고
    • Taguchi method for analyzing the tactical planning model in a closed-loop supply chain considering remanufacturing option
    • 10.1007/s00170-012-4322-x
    • Subulan K, Tasan AS (2012) Taguchi method for analyzing the tactical planning model in a closed-loop supply chain considering remanufacturing option. Int J Adv Manuf Technol. doi: 10.1007/s00170-012-4322-x
    • (2012) Int J Adv Manuf Technol
    • Subulan, K.1    Tasan, A.S.2
  • 26
    • 0031256632 scopus 로고    scopus 로고
    • Eco-efficiency, asset recovery and remanufacturing
    • 10.1016/S0263-2373(97)00035-2
    • Ayres R, Geraldo F, Van Leynseele T (1997) Eco-efficiency, asset recovery and remanufacturing. Eur Manag J 15(5):557-574
    • (1997) Eur Manag J , vol.15 , Issue.5 , pp. 557-574
    • Ayres, R.1    Geraldo, F.2    Van Leynseele, T.3
  • 29
    • 0034257398 scopus 로고    scopus 로고
    • Raising awareness and signaling quality to uninformed consumers: A price-advertising model
    • 10.1287/mksc.19.4.390.11788
    • Zhao H (2000) Raising awareness and signaling quality to uninformed consumers: a price-advertising model. Mark Sci 19(4):390-396
    • (2000) Mark Sci , vol.19 , Issue.4 , pp. 390-396
    • Zhao, H.1
  • 30
    • 0000689487 scopus 로고
    • Durable-goods monopolists
    • 10.1086/261058
    • Bulow JI (1982) Durable-goods monopolists. J Polit Econ 90(2):241-248
    • (1982) J Polit Econ , vol.90 , Issue.2 , pp. 241-248
    • Bulow, J.I.1
  • 31
    • 79551650944 scopus 로고    scopus 로고
    • Quantitative models for inventory and production planning in closed-loop supply chains
    • 10.1080/00207541003692021
    • AkçalI E, Çetinkaya S (2011) Quantitative models for inventory and production planning in closed-loop supply chains. Int J Prod Res 49(8):2373-2407
    • (2011) Int J Prod Res , vol.49 , Issue.8 , pp. 2373-2407
    • Akçali, E.1    Çetinkaya, S.2
  • 32
    • 75849127286 scopus 로고    scopus 로고
    • Price and lead time decisions in dual-channel supply chains
    • 10.1016/j.ejor.2009.12.012
    • Hua GW, Wang SY, Cheng TCE (2010) Price and lead time decisions in dual-channel supply chains. Eur J Oper Res 205(1):113-126
    • (2010) Eur J Oper Res , vol.205 , Issue.1 , pp. 113-126
    • Hua, G.W.1    Wang, S.Y.2    Cheng, T.C.E.3
  • 33
    • 84864763723 scopus 로고    scopus 로고
    • A strategic analysis of dual-channel supply chain design with price and delivery lead time considerations
    • 10.1016/j.ijpe.2012.06.014
    • Xu H, Liu ZZ, Zhang SH (2012) A strategic analysis of dual-channel supply chain design with price and delivery lead time considerations. Int J Prod Econ 139(2):654-663
    • (2012) Int J Prod Econ , vol.139 , Issue.2 , pp. 654-663
    • Xu, H.1    Liu, Z.Z.2    Zhang, S.H.3
  • 34
    • 0033907816 scopus 로고    scopus 로고
    • A supplier's optimal quantity discount policy under asymmetric information
    • 10.1287/mnsc.46.3.444.12065
    • Corbett CJ, De Groote X (2000) A supplier's optimal quantity discount policy under asymmetric information. Manag Sci 46(3):444-450
    • (2000) Manag Sci , vol.46 , Issue.3 , pp. 444-450
    • Corbett, C.J.1    De Groote, X.2
  • 35
    • 77955085704 scopus 로고    scopus 로고
    • Cooperative advertising, pricing strategy and firm performance in the e-marketing age
    • 10.1007/s11747-009-0171-z
    • Yan RL (2010) Cooperative advertising, pricing strategy and firm performance in the e-marketing age. J Acad Mark Sci 38(4):510-519
    • (2010) J Acad Mark Sci , vol.38 , Issue.4 , pp. 510-519
    • Yan, R.L.1
  • 36
    • 79951723475 scopus 로고    scopus 로고
    • Vendor-managed inventory in a global environment with exchange rate uncertainty
    • 10.1016/j.ijpe.2010.12.006
    • Lee J-Y, Ren L (2011) Vendor-managed inventory in a global environment with exchange rate uncertainty. Int J Prod Econ 130(2):169-174
    • (2011) Int J Prod Econ , vol.130 , Issue.2 , pp. 169-174
    • Lee, J.-Y.1    Ren, L.2
  • 37
    • 0000291018 scopus 로고
    • The bargaining problem
    • 35977 10.2307/1907266
    • Nash JF (1950) The bargaining problem. Econometrica 18(2):155-162
    • (1950) Econometrica , vol.18 , Issue.2 , pp. 155-162
    • Nash, J.F.1
  • 38
    • 0036807798 scopus 로고    scopus 로고
    • Cooperative advertising, game theory and manufacturer-retailer supply chains
    • 10.1016/S0305-0483(02)00051-8
    • Li SX, Huang ZM, Zhu J, Chau PYK (2002) Cooperative advertising, game theory and manufacturer-retailer supply chains. Omega 30(5):347-357
    • (2002) Omega , vol.30 , Issue.5 , pp. 347-357
    • Li, S.X.1    Huang, Z.M.2    Zhu, J.3    Chau, P.Y.K.4
  • 39
    • 52049112754 scopus 로고    scopus 로고
    • Profit sharing and firm performance in the manufacturer-retailer dual-channel supply chain
    • 10.1007/s10660-008-9020-2
    • Yan RL (2008) Profit sharing and firm performance in the manufacturer-retailer dual-channel supply chain. Electron Commer Res 8(3):155-172
    • (2008) Electron Commer Res , vol.8 , Issue.3 , pp. 155-172
    • Yan, R.L.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.