메뉴 건너뛰기




Volumn 57, Issue 1, 2009, Pages 10-18

The evolution of closed-loop supply chain research

Author keywords

Closed loop supply chains; Remanufacturing; Reverse logistics; Value added recovery

Indexed keywords

BUSINESS PERSPECTIVES; CLOSED-LOOP SUPPLY CHAINS; EVOLUTIONARY PROCESS; NICHE AREAS; REMANUFACTURING; RESEARCH OPPORTUNITIES; REVERSE LOGISTICS; VALUE RECOVERIES; VALUE-ADDED RECOVERY;

EID: 61449118693     PISSN: 0030364X     EISSN: 15265463     Source Type: Journal    
DOI: 10.1287/opre.1080.0628     Document Type: Article
Times cited : (1137)

References (60)
  • 1
    • 1642375700 scopus 로고    scopus 로고
    • The effect of categorizing returned products in remanufacturing
    • Aras, N., T. Boyaci, V. Verter. 2004. The effect of categorizing returned products in remanufacturing. HE Trans. 36 319-331.
    • (2004) HE Trans , vol.36 , pp. 319-331
    • Aras, N.1    Boyaci, T.2    Verter, V.3
  • 2
    • 33846287029 scopus 로고    scopus 로고
    • Coordination and priority decisions in hybrid manufacturing/remanufacturing systems
    • Aras, N., V. Verter, T. Boyaci. 2006. Coordination and priority decisions in hybrid manufacturing/remanufacturing systems. Production Oper. Management 15 528-543.
    • (2006) Production Oper. Management , vol.15 , pp. 528-543
    • Aras, N.1    Verter, V.2    Boyaci, T.3
  • 3
    • 33846325280 scopus 로고    scopus 로고
    • Lot sizing for optimal collection and use of remanufacturable returns over a finite life cycle
    • Atasu, A., S. Cetinkaya. 2006. Lot sizing for optimal collection and use of remanufacturable returns over a finite life cycle. Production Oper. Management 15 473-487.
    • (2006) Production Oper. Management , vol.15 , pp. 473-487
    • Atasu, A.1    Cetinkaya, S.2
  • 4
    • 54349099641 scopus 로고    scopus 로고
    • Remanufacturing as a marketing strategy
    • Atasu, A., M. Sarvary, L. N. Van Wassenhove. 2008. Remanufacturing as a marketing strategy. Management Sci. 54(10) 1731-1746.
    • (2008) Management Sci , vol.54 , Issue.10 , pp. 1731-1746
    • Atasu, A.1    Sarvary, M.2    Van Wassenhove, L.N.3
  • 5
    • 0036568098 scopus 로고    scopus 로고
    • Dynamic lot sizing with returning items and disposals
    • Beltran, J., D. Krass. 2002. Dynamic lot sizing with returning items and disposals. IIE Trans. 34 437-448.
    • (2002) IIE Trans , vol.34 , pp. 437-448
    • Beltran, J.1    Krass, D.2
  • 6
    • 1642347647 scopus 로고    scopus 로고
    • Blackburn, J., V. D. R. Guide Jr., G. Souza, L. N. Van Wassenhove. 2004. Reverse supply chains for commercial returns. California Management Rev. 46(2) 6-23.
    • Blackburn, J., V. D. R. Guide Jr., G. Souza, L. N. Van Wassenhove. 2004. Reverse supply chains for commercial returns. California Management Rev. 46(2) 6-23.
  • 7
    • 0030527319 scopus 로고    scopus 로고
    • An environmental life cycle optimization model for the European pulp and paper industry
    • Bloemhof-Ruwaard, J., L. N. Van Wassenhove, H. Gabel, P. Weaver. 1996. An environmental life cycle optimization model for the European pulp and paper industry. Omega 24 615-629.
    • (1996) Omega , vol.24 , pp. 615-629
    • Bloemhof-Ruwaard, J.1    Van Wassenhove, L.N.2    Gabel, H.3    Weaver, P.4
  • 8
    • 25144508876 scopus 로고    scopus 로고
    • Market segmentation and production technology selection for remanufacturable products
    • Debo, L., B. Toktay, L. N. Van Wassenhove. 2005. Market segmentation and production technology selection for remanufacturable products. Management Sci. 51 1193-1205.
    • (2005) Management Sci , vol.51 , pp. 1193-1205
    • Debo, L.1    Toktay, B.2    Van Wassenhove, L.N.3
  • 10
    • 33744812195 scopus 로고    scopus 로고
    • Optimal policy for a multiechelon inventory system with remanufacturing
    • DeCriox, G. 2006. Optimal policy for a multiechelon inventory system with remanufacturing. Oper. Res. 54 523-543.
    • (2006) Oper. Res , vol.54 , pp. 523-543
    • DeCriox, G.1
  • 11
    • 25144431897 scopus 로고    scopus 로고
    • Inventory management for an assembly system with product or component returns
    • DeCroix, G., P. Zipkin. 2005. Inventory management for an assembly system with product or component returns. Management Sci. 51 1250-1265.
    • (2005) Management Sci , vol.51 , pp. 1250-1265
    • DeCroix, G.1    Zipkin, P.2
  • 12
    • 18744376307 scopus 로고    scopus 로고
    • A series system with returns: Stationary analysis
    • DeCroix, G., J.-S. Song, P. Zipkin. 2005. A series system with returns: Stationary analysis. Oper. Res. 53 350-362.
    • (2005) Oper. Res , vol.53 , pp. 350-362
    • DeCroix, G.1    Song, J.-S.2    Zipkin, P.3
  • 13
    • 21244485304 scopus 로고    scopus 로고
    • Dekker, R, M. Fleischmann, K. Inderfurth, L. N. Van Wassenhove, eds, Springer-Verlag, Berlin
    • Dekker, R., M. Fleischmann, K. Inderfurth, L. N. Van Wassenhove, eds. 2004. Reverse Logistics: Quantitative Models for Closed-Loop Supply Chains. Springer-Verlag, Berlin.
    • (2004) Reverse Logistics: Quantitative Models for Closed-Loop Supply Chains
  • 14
    • 61449121434 scopus 로고    scopus 로고
    • de Ron, A, S. D. P. Flapper, eds, Eindhoven University of Technology, Eindhoven, The Netherlands
    • de Ron, A., S. D. P. Flapper, eds. 1996. Proc. First Internat. Working Seminar on Reuse, Eindhoven University of Technology, Eindhoven, The Netherlands.
    • (1996) Proc. First Internat. Working Seminar on Reuse
  • 15
    • 61449192639 scopus 로고    scopus 로고
    • de Ron, A, S. D. P. Flapper, eds, Eindhoven University of Technology, Eindhoven, The Netherlands
    • de Ron, A., S. D. P. Flapper, eds. 1999. Proc. Second Internat. Working Seminar on Reuse, Eindhoven University of Technology, Eindhoven, The Netherlands.
    • (1999) Proc. Second Internat. Working Seminar on Reuse
  • 16
    • 0029356018 scopus 로고
    • Disassembly and recycling of electronic consumer products: An overview
    • de Ron, A., K. Penev. 1995. Disassembly and recycling of electronic consumer products: An overview. Technovation 15(6) 363-374.
    • (1995) Technovation , vol.15 , Issue.6 , pp. 363-374
    • de Ron, A.1    Penev, K.2
  • 17
    • 33749356646 scopus 로고    scopus 로고
    • The effect of competition on recovery strategies
    • Ferguson, M., B. Toktay. 2006. The effect of competition on recovery strategies. Production Oper. Management 15 351-368.
    • (2006) Production Oper. Management , vol.15 , pp. 351-368
    • Ferguson, M.1    Toktay, B.2
  • 18
    • 33749358580 scopus 로고    scopus 로고
    • Ferguson, M., V. D. R. Guide Jr., G. Souza. 2006. Supply chain coordination for false failure returns. Manufacturing Service Oper. Management 8 376-393.
    • Ferguson, M., V. D. R. Guide Jr., G. Souza. 2006. Supply chain coordination for false failure returns. Manufacturing Service Oper. Management 8 376-393.
  • 19
    • 1142305311 scopus 로고    scopus 로고
    • Value of information in remanufacturing complex products
    • Ferrer, G., M. Ketzenberg. 2004. Value of information in remanufacturing complex products. HE Trans. 36 265-277.
    • (2004) HE Trans , vol.36 , pp. 265-277
    • Ferrer, G.1    Ketzenberg, M.2
  • 20
    • 33644537032 scopus 로고    scopus 로고
    • Managing new and remanufactured products
    • Ferrer, G., J. Swaminathan. 2006. Managing new and remanufactured products. Management Sci. 52 15-26.
    • (2006) Management Sci , vol.52 , pp. 15-26
    • Ferrer, G.1    Swaminathan, J.2
  • 21
    • 0040150529 scopus 로고    scopus 로고
    • Material planning for a remanufacturing facility
    • Ferrer, G., C. Whybark. 2001. Material planning for a remanufacturing facility. Production Oper. Management 10 112-124.
    • (2001) Production Oper. Management , vol.10 , pp. 112-124
    • Ferrer, G.1    Whybark, C.2
  • 22
    • 84892291864 scopus 로고    scopus 로고
    • Flapper, S. D. P, J. van Nunen, L. N. Van Wassenhove, eds, Springer, Berlin
    • Flapper, S. D. P., J. van Nunen, L. N. Van Wassenhove, eds. 2005. Managing Closed-Loop Supply Chains. Springer, Berlin.
    • (2005) Managing Closed-Loop Supply Chains
  • 23
    • 0742306058 scopus 로고    scopus 로고
    • Integrating closed-loop supply chains and spare-parts management at IBM
    • Fleischmann, M., J. van Nunen, B. Grave. 2003. Integrating closed-loop supply chains and spare-parts management at IBM. Interfaces 33 44-56.
    • (2003) Interfaces , vol.33 , pp. 44-56
    • Fleischmann, M.1    van Nunen, J.2    Grave, B.3
  • 25
    • 33846325135 scopus 로고    scopus 로고
    • Optimal acquisition and sorting policies for remanufacturing
    • Galbreth, M., J. D. Blackburn. 2006. Optimal acquisition and sorting policies for remanufacturing. Production Oper. Management 15 384-392.
    • (2006) Production Oper. Management , vol.15 , pp. 384-392
    • Galbreth, M.1    Blackburn, J.D.2
  • 26
    • 33847036372 scopus 로고    scopus 로고
    • The impact of limited component durability and finite life cycles on remanufacturing profit
    • Geyer, R., L. N. Van Wassenhove, A. Atasu. 2007. The impact of limited component durability and finite life cycles on remanufacturing profit. Management Sci. 53 88-100.
    • (2007) Management Sci , vol.53 , pp. 88-100
    • Geyer, R.1    Van Wassenhove, L.N.2    Atasu, A.3
  • 27
    • 0035501881 scopus 로고    scopus 로고
    • Economic lot-sizing with remanufacturing options
    • Golany, B., J. Yang, G. Yu. 2001. Economic lot-sizing with remanufacturing options. IIE Trans. 33 995-1004.
    • (2001) IIE Trans , vol.33 , pp. 995-1004
    • Golany, B.1    Yang, J.2    Yu, G.3
  • 28
    • 0030129785 scopus 로고    scopus 로고
    • Scheduling using drum-buffer-rope in a remanufacturing environment
    • Guide, V. D. R., Jr. 1996. Scheduling using drum-buffer-rope in a remanufacturing environment. Internat. J. Production Res. 34 1081-1091.
    • (1996) Internat. J. Production Res , vol.34 , pp. 1081-1091
    • Guide Jr., V.D.R.1
  • 29
    • 0033738099 scopus 로고    scopus 로고
    • Production planning and control for remanufacturing: Industry practice and research needs
    • Guide, V. D. R., Jr. 2000. Production planning and control for remanufacturing: Industry practice and research needs. J. Oper. Management 18 467-483.
    • (2000) J. Oper. Management , vol.18 , pp. 467-483
    • Guide Jr., V.D.R.1
  • 31
    • 0032181029 scopus 로고    scopus 로고
    • Inventory buffers in recoverable manufacturing
    • Guide, V. D. R., Jr., R. Srivastava. 1998. Inventory buffers in recoverable manufacturing. J. Oper. Management 16 551-568.
    • (1998) J. Oper. Management , vol.16 , pp. 551-568
    • Guide Jr., V.D.R.1    Srivastava, R.2
  • 34
    • 0347460516 scopus 로고    scopus 로고
    • Guide, V. D. R, Jr, L. N. Van Wassenhove, eds, Carnegie Mellon University Press, Pittsburgh
    • Guide, V. D. R., Jr., L. N. Van Wassenhove, eds. 2003a. Business Aspects of Closed-Loop Supply Chains. Carnegie Mellon University Press, Pittsburgh.
    • (2003) Business Aspects of Closed-Loop Supply Chains
  • 35
    • 0742323771 scopus 로고    scopus 로고
    • Special section on closed-loop supply chains
    • Guide, V. D. R, Jr, L. N. Van Wassenhove, eds
    • Guide, V. D. R., Jr., L. N. Van Wassenhove, eds. 2003b. Special section on closed-loop supply chains. Interfaces 33(6) 1-2.
    • (2003) Interfaces , vol.33 , Issue.6 , pp. 1-2
  • 36
    • 61449103931 scopus 로고    scopus 로고
    • Feature issue on closed-loop supply chains
    • Guide, V. D. R, Jr, L. N. Van Wassenhove, eds, Rev
    • Guide, V. D. R., Jr., L. N. Van Wassenhove, eds. 2004. Feature issue on closed-loop supply chains. California Management Rev. 46(2).
    • (2004) California Management , vol.46 , Issue.2
  • 37
    • 84855244330 scopus 로고    scopus 로고
    • Feature issue on closed-loop supply chains
    • Guide, V. D. R, Jr, L. N. Van Wassenhove, eds, &
    • Guide, V. D. R., Jr., L. N. Van Wassenhove, eds. 2006. Feature issue on closed-loop supply chains. Production Oper. Management 15(3&4).
    • (2006) Production Oper. Management , vol.15 , pp. 3-4
  • 40
    • 0000683467 scopus 로고    scopus 로고
    • Simple optimal replenishment and disposal policies for a product recovery system with leadtimes
    • Inderfurth, K. 1997. Simple optimal replenishment and disposal policies for a product recovery system with leadtimes. OR Spektrum 19 111-122.
    • (1997) OR Spektrum , vol.19 , pp. 111-122
    • Inderfurth, K.1
  • 41
    • 61449233490 scopus 로고    scopus 로고
    • Jayaraman, V., R. Klassen, J. Linton., eds. 2007. Feature section on supply chains in a sustainable environment. J. Oper. Management 26(6).
    • Jayaraman, V., R. Klassen, J. Linton., eds. 2007. Feature section on supply chains in a sustainable environment. J. Oper. Management 26(6).
  • 42
    • 0742323768 scopus 로고    scopus 로고
    • Reconfiguring a remanufacturing line at Visteon, Mexico
    • Kekre, S., U. Rao, J. Swaminathan, Z. Zhang. 2003. Reconfiguring a remanufacturing line at Visteon, Mexico. Interfaces 33(6) 30-43.
    • (2003) Interfaces , vol.33 , Issue.6 , pp. 30-43
    • Kekre, S.1    Rao, U.2    Swaminathan, J.3    Zhang, Z.4
  • 43
    • 0742316813 scopus 로고    scopus 로고
    • Ketzenberg, M., G. C. Souza, V. D. Guide Jr. 2003. Mixed assembly and disassembly operations for remanufacturing. Production Oper. Management 12 320-335.
    • Ketzenberg, M., G. C. Souza, V. D. Guide Jr. 2003. Mixed assembly and disassembly operations for remanufacturing. Production Oper. Management 12 320-335.
  • 48
    • 25444491771 scopus 로고    scopus 로고
    • Optimal prices and trade-in rebates for durable, remanufacturable products
    • Ray, S., T. Boyaci, N. Aras. 2005. Optimal prices and trade-in rebates for durable, remanufacturable products. Manufacturing Service Oper. Management 7 208-228.
    • (2005) Manufacturing Service Oper. Management , vol.7 , pp. 208-228
    • Ray, S.1    Boyaci, T.2    Aras, N.3
  • 50
    • 1642269093 scopus 로고    scopus 로고
    • Closed-loop supply chain models with product remanufacturing
    • Savaskan, C., S. Bhattacharya, L. N. Van Wassenhove. 2004. Closed-loop supply chain models with product remanufacturing. Management Sci. 50 239-252.
    • (2004) Management Sci , vol.50 , pp. 239-252
    • Savaskan, C.1    Bhattacharya, S.2    Van Wassenhove, L.N.3
  • 51
    • 0348090488 scopus 로고    scopus 로고
    • Souza, G., M. Ketzenberg, V. D. R. Guide Jr. 2002. Capacitated remanufacturing with, service level constraints. Production Oper. Management 11 231-248.
    • Souza, G., M. Ketzenberg, V. D. R. Guide Jr. 2002. Capacitated remanufacturing with, service level constraints. Production Oper. Management 11 231-248.
  • 52
    • 1642285752 scopus 로고    scopus 로고
    • Many happy (product) returns
    • Stock, J., T. Speh, H. Shear. 2002. Many happy (product) returns. Harvard Bus. Rev. 80(7) 16-17.
    • (2002) Harvard Bus. Rev , vol.80 , Issue.7 , pp. 16-17
    • Stock, J.1    Speh, T.2    Shear, H.3
  • 53
    • 33846273647 scopus 로고    scopus 로고
    • Economic lot scheduling problem with returns
    • Tang, O., R. H. Teunter. 2006. Economic lot scheduling problem with returns. Production Oper. Management 15 488-497.
    • (2006) Production Oper. Management , vol.15 , pp. 488-497
    • Tang, O.1    Teunter, R.H.2
  • 55
    • 1642414070 scopus 로고    scopus 로고
    • Strategic use of the secondary market for retail consumer goods
    • Tibben-Lembke, R. 2004. Strategic use of the secondary market for retail consumer goods. California Management Rev. 46 90-104.
    • (2004) California Management Rev , vol.46 , pp. 90-104
    • Tibben-Lembke, R.1
  • 57
    • 0001228726 scopus 로고    scopus 로고
    • Inventory management of remanufacturable products
    • Toktay, B., L. Wein, S. Zenios. 2000. Inventory management of remanufacturable products. Management Sci. 46 1412-1426.
    • (2000) Management Sci , vol.46 , pp. 1412-1426
    • Toktay, B.1    Wein, L.2    Zenios, S.3
  • 59
    • 61449094114 scopus 로고    scopus 로고
    • Feature issue on reverse logistics
    • Verter, V, T. Boyaci, eds
    • Verter, V., T. Boyaci, eds. 2007. Feature issue on reverse logistics. Comput. & OR 34(2).
    • (2007) Comput. & OR , vol.34 , Issue.2
  • 60
    • 0742288767 scopus 로고    scopus 로고
    • McGriff Treading Company implements service contracts under shared savings
    • Yadav, P., D. Miller, C. Schmidt, R. Drake. 2003. McGriff Treading Company implements service contracts under shared savings. Interfaces 33 18-29.
    • (2003) Interfaces , vol.33 , pp. 18-29
    • Yadav, P.1    Miller, D.2    Schmidt, C.3    Drake, R.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.