메뉴 건너뛰기




Volumn 69, Issue 5-8, 2013, Pages 937-959

Training and assignment of multi-skilled workers for implementing seru production systems

Author keywords

Heuristic algorithm; Multi skilled workers assignment; Reconfiguration of production systems; Seru production system; Training of multi skilled workers

Indexed keywords

ASSEMBLY MACHINES; COMBINATORIAL OPTIMIZATION; CONVEYORS; ELECTRONICS INDUSTRY; HEURISTIC ALGORITHMS; MANUFACTURE; MATLAB;

EID: 84887569930     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-013-5027-5     Document Type: Article
Times cited : (113)

References (46)
  • 1
    • 25144494968 scopus 로고    scopus 로고
    • Internationalization of Japanese company and change of production system
    • (in Japanese)
    • Asano S (1997) Internationalization of Japanese company and change of production system. Rikkyo Econ Rev 51(1):29-55. (in Japanese)
    • (1997) Rikkyo Econ Rev , vol.51 , Issue.1 , pp. 29-55
    • Asano, S.1
  • 3
    • 79959701752 scopus 로고    scopus 로고
    • Accumulated knowledge and technological progress in terms of learning rates: A comparative analysis on the manufacturing industry and the service industry in malaysia
    • 10.1080/19761597.2009.9668674
    • Asgari B, Yen LW (2009) Accumulated knowledge and technological progress in terms of learning rates: a comparative analysis on the manufacturing industry and the service industry in malaysia. Asian J Technol Innov 17(2):71-99
    • (2009) Asian J Technol Innov , vol.17 , Issue.2 , pp. 71-99
    • Asgari, B.1    Yen, L.W.2
  • 4
    • 0342356895 scopus 로고
    • Linear programming with multiple objective functions: Step method (stem)
    • 10.1007/BF01584098
    • Benayoun R, Montgolfier JD, Tergny J, Laritchev O (1971) Linear programming with multiple objective functions: step method (stem). Math Program 1(1):366-375
    • (1971) Math Program , vol.1 , Issue.1 , pp. 366-375
    • Benayoun, R.1    Montgolfier, J.D.2    Tergny, J.3    Laritchev, O.4
  • 5
    • 14644439134 scopus 로고    scopus 로고
    • A study of labor assignment flexibility in cellular manufacturing systems
    • 10.1016/j.cie.2003.04.001
    • Cesaní VI, Steudel HJ (2005) A study of labor assignment flexibility in cellular manufacturing systems. Comput Ind Eng 48(3):571-591
    • (2005) Comput Ind Eng , vol.48 , Issue.3 , pp. 571-591
    • Cesaní, V.I.1    Steudel, H.J.2
  • 6
    • 84887584562 scopus 로고    scopus 로고
    • The challenge of cano-part 3
    • D&M Nikkei Mechanical
    • D&M Nikkei Mechanical (2003) The challenge of cano-part 3. D&M Nikkei Mechanical 588:70-73
    • (2003) D&M Nikkei Mechanical , vol.588 , pp. 70-73
  • 7
    • 67349272992 scopus 로고    scopus 로고
    • Influence of workload imbalances on the need for worker flexibility
    • 10.1016/j.cie.2008.11.029
    • Davis D, Kher HV, Wagner BJ (2009) Influence of workload imbalances on the need for worker flexibility. Comput Ind Eng 57(1):319-329
    • (2009) Comput Ind Eng , vol.57 , Issue.1 , pp. 319-329
    • Davis, D.1    Kher, H.V.2    Wagner, B.J.3
  • 8
    • 0001518329 scopus 로고    scopus 로고
    • Order dispatching and labor assignment in cellular manufacturing systems
    • 10.1111/j.1540-5915.2000.tb00941.x
    • Davis D, Mabert VA (2000) Order dispatching and labor assignment in cellular manufacturing systems. Decis Sci 31(4):745-771
    • (2000) Decis Sci , vol.31 , Issue.4 , pp. 745-771
    • Davis, D.1    Mabert, V.A.2
  • 9
    • 12244251454 scopus 로고    scopus 로고
    • Data envelopment analysis based decision model for optimal operator allocation in CMS
    • 10.1016/j.ejor.2004.01.038
    • Ertay T, Ruan D (2005) Data envelopment analysis based decision model for optimal operator allocation in CMS. Eur J Oper Res 164(3):800-810
    • (2005) Eur J Oper Res , vol.164 , Issue.3 , pp. 800-810
    • Ertay, T.1    Ruan, D.2
  • 11
    • 1242309349 scopus 로고    scopus 로고
    • Benefits of skill chaining in serial production lines with cross-trained workers
    • 10.1287/mnsc.1030.0166
    • Hopp W, Tekin E, Van OM (2004) Benefits of skill chaining in serial production lines with cross-trained workers. Manag Sci 50(1):83-98
    • (2004) Manag Sci , vol.50 , Issue.1 , pp. 83-98
    • Hopp, W.1    Tekin, E.2    Van, O.M.3
  • 12
    • 38549090670 scopus 로고    scopus 로고
    • Call-center labor cross-training: It's a small world after all
    • 10.1287/mnsc.1060.0621
    • Iravani SM, Kolfal B, Van OMP (2007) Call-center labor cross-training: it's a small world after all. Manag Sci 53(7):1102-1112
    • (2007) Manag Sci , vol.53 , Issue.7 , pp. 1102-1112
    • Iravani, S.M.1    Kolfal, B.2    Van, O.M.P.3
  • 13
    • 0036796841 scopus 로고    scopus 로고
    • Cell production innovation in Japan: Toward a new model for Japanese manufacturing?
    • 10.1111/1468-232X.00264
    • Isa K, Tsuru T (2002) Cell production innovation in Japan: toward a new model for Japanese manufacturing?Ind Relat 41(4):548-578
    • (2002) Ind Relat , vol.41 , Issue.4 , pp. 548-578
    • Isa, K.1    Tsuru, T.2
  • 15
    • 27744539232 scopus 로고    scopus 로고
    • Converting from moving assembly lines to cells at sheet metal products: Insights on performance improvements
    • 10.1080/00207540412331299594
    • Johnson DJ (2005) Converting from moving assembly lines to cells at sheet metal products: insights on performance improvements. Int J Prod Res 43(7):1483-1509
    • (2005) Int J Prod Res , vol.43 , Issue.7 , pp. 1483-1509
    • Johnson, D.J.1
  • 16
    • 66149133556 scopus 로고    scopus 로고
    • Modeling and numerical analysis of line-cell conversion problems
    • 10.1080/00207540802275889
    • Kaku I, Gong J, Tang J, Yin Y (2009) Modeling and numerical analysis of line-cell conversion problems. Int J Prod Res 47(8):2055-2078
    • (2009) Int J Prod Res , vol.47 , Issue.8 , pp. 2055-2078
    • Kaku, I.1    Gong, J.2    Tang, J.3    Yin, Y.4
  • 17
    • 40449142000 scopus 로고    scopus 로고
    • A study on human-task-related performances in converting conveyor assembly line to cellular manufacturing
    • 10.1504/EJIE.2008.016327
    • Kaku I, Murase Y, Yin Y (2008) A study on human-task-related performances in converting conveyor assembly line to cellular manufacturing. Eur J Ind Eng 2(1):17-34
    • (2008) Eur J Ind Eng , vol.2 , Issue.1 , pp. 17-34
    • Kaku, I.1    Murase, Y.2    Yin, Y.3
  • 18
    • 0001208441 scopus 로고
    • Acquiring and operationalizing worker flexibility in dual resource constrained job shops with worker transfer delays and learning losses
    • Kher HV, Malhotra MK (1994) Acquiring and operationalizing worker flexibility in dual resource constrained job shops with worker transfer delays and learning losses. Int J Manag Sci 22(5):521-533
    • (1994) Int J Manag Sci , vol.22 , Issue.5 , pp. 521-533
    • Kher, H.V.1    Malhotra, M.K.2
  • 19
    • 40449138845 scopus 로고    scopus 로고
    • Cellular manufacturing runs into trouble when nothing is done
    • (in Japanese)
    • Kimura T, Yoshita M (2004) Cellular manufacturing runs into trouble when nothing is done. Nikkei Monozukuri 7:38-61. (in Japanese)
    • (2004) Nikkei Monozukuri , vol.7 , pp. 38-61
    • Kimura, T.1    Yoshita, M.2
  • 20
    • 40449135206 scopus 로고    scopus 로고
    • The aim of the special issue on seru manufacturing
    • Kono H (2004) The aim of the special issue on seru manufacturing. IE Rev 45:4-5
    • (2004) IE Rev , vol.45 , pp. 4-5
    • Kono, H.1
  • 21
    • 34648816957 scopus 로고    scopus 로고
    • Optimization of mixed-skill multi-line operator allocation problem
    • 10.1016/j.cie.2007.04.011
    • Kuo Y, Yang T (2007) Optimization of mixed-skill multi-line operator allocation problem. Comput Ind Eng 53(3):386-393
    • (2007) Comput Ind Eng , vol.53 , Issue.3 , pp. 386-393
    • Kuo, Y.1    Yang, T.2
  • 22
    • 84865248674 scopus 로고    scopus 로고
    • Reconfiguration of assembly systems from conveyor assembly line to serus
    • 10.1016/j.jmsy.2012.02.003
    • Liu C, Li W, Lian J, Yin Y (2012) Reconfiguration of assembly systems from conveyor assembly line to serus. J Manuf Syst 31(3):312-325
    • (2012) J Manuf Syst , vol.31 , Issue.3 , pp. 312-325
    • Liu, C.1    Li, W.2    Lian, J.3    Yin, Y.4
  • 23
    • 79954557948 scopus 로고    scopus 로고
    • Seru seisan - An innovation of the production management mode in Japan
    • 10.1080/19761597.2010.9668694
    • Liu C, Lian J, Yin Y, Li W (2010) Seru seisan - an innovation of the production management mode in Japan. Asian J Technol Innov 18(2):89-113
    • (2010) Asian J Technol Innov , vol.18 , Issue.2 , pp. 89-113
    • Liu, C.1    Lian, J.2    Yin, Y.3    Li, W.4
  • 24
    • 84889652740 scopus 로고    scopus 로고
    • An implementation framework for Seru production
    • doi: 10.1111/itor.12014
    • Liu C, Stecke K, Lian J, Yin Y (2013) An implementation framework for Seru production. Int Trans Oper Res doi: 10.1111/itor.12014
    • (2013) Int Trans Oper Res
    • Liu, C.1    Stecke, K.2    Lian, J.3    Yin, Y.4
  • 25
    • 70449532828 scopus 로고    scopus 로고
    • Development and application of a worker assignment model to evaluate a lean manufacturing cell
    • 10.1080/00207540701570174
    • McDonald T, Ellis KP, Van AEM, Koelling CP (2009) Development and application of a worker assignment model to evaluate a lean manufacturing cell. Int J Prod Res 47(9):2427-2447
    • (2009) Int J Prod Res , vol.47 , Issue.9 , pp. 2427-2447
    • McDonald, T.1    Ellis, K.P.2    Van, A.E.M.3    Koelling, C.P.4
  • 26
    • 34047202335 scopus 로고    scopus 로고
    • The shift from belt conveyor line to work-cell based assembly systems to cope with increasing demand variation in Japanese industries
    • 10.1504/IJATM.2006.012234
    • Miyake DI (2006) The shift from belt conveyor line to work-cell based assembly systems to cope with increasing demand variation in Japanese industries. Int J Automot Technol Manag 6(4):419-439
    • (2006) Int J Automot Technol Manag , vol.6 , Issue.4 , pp. 419-439
    • Miyake, D.I.1
  • 27
    • 0032632662 scopus 로고    scopus 로고
    • Functional flexibility and team performance
    • 10.1080/002075499191021
    • Molleman E, Slomp J (1999) Functional flexibility and team performance. Int J Prod Res 37(8):1837-1858
    • (1999) Int J Prod Res , vol.37 , Issue.8 , pp. 1837-1858
    • Molleman, E.1    Slomp, J.2
  • 29
    • 0037091955 scopus 로고    scopus 로고
    • Worker assignment in cellular manufacturing considering technical and human skills
    • 10.1080/00207540110118082
    • Norman BA, Tharmmaphornphilas W, Needy KL, Bidanda B, Warner RC (2002) Worker assignment in cellular manufacturing considering technical and human skills. Int J Prod Res 40(6):1479-1492
    • (2002) Int J Prod Res , vol.40 , Issue.6 , pp. 1479-1492
    • Norman, B.A.1    Tharmmaphornphilas, W.2    Needy, K.L.3    Bidanda, B.4    Warner, R.C.5
  • 30
    • 84994379427 scopus 로고    scopus 로고
    • Conditions for successful implementation of assembly cells
    • Sakazume Y (2006) Conditions for successful implementation of assembly cells. Ind Eng Manag Syst 5(2):142-148
    • (2006) Ind Eng Manag Syst , vol.5 , Issue.2 , pp. 142-148
    • Sakazume, Y.1
  • 31
    • 84887590335 scopus 로고    scopus 로고
    • HRM practices and operational/financial performance: Evidence from cell production at Japanese electronics manufacturers
    • Sakikawa T (2005) HRM practices and operational/financial performance: evidence from cell production at Japanese electronics manufacturers. Ann Rep Econ, Nigata University 29:17-45
    • (2005) Ann Rep Econ, Nigata University , vol.29 , pp. 17-45
    • Sakikawa, T.1
  • 32
    • 84887590430 scopus 로고    scopus 로고
    • HRM practices for Japanese cell production
    • Sakikawa T (2006) HRM practices for Japanese cell production. Ann Rep Econ, Nigata University 30:1-29
    • (2006) Ann Rep Econ, Nigata University , vol.30 , pp. 1-29
    • Sakikawa, T.1
  • 33
    • 59349094693 scopus 로고    scopus 로고
    • A goal-programming approach for design of hybrid cellular manufacturing systems in dual resource constrained environments
    • 10.1016/j.cie.2008.06.009
    • Satoglu SI, Suresh NC (2009) A goal-programming approach for design of hybrid cellular manufacturing systems in dual resource constrained environments. Comput Ind Eng 56(2):560-575
    • (2009) Comput Ind Eng , vol.56 , Issue.2 , pp. 560-575
    • Satoglu, S.I.1    Suresh, N.C.2
  • 34
    • 33750433325 scopus 로고
    • Shocking news of the removal of conveyor systems: Single-worker cellular manufacturing system
    • Shinohara T (1995) Shocking news of the removal of conveyor systems: single-worker cellular manufacturing system. Nikkei Mech 459:20-38
    • (1995) Nikkei Mech , vol.459 , pp. 20-38
    • Shinohara, T.1
  • 35
    • 34047232092 scopus 로고    scopus 로고
    • Seru seisan mode: A great turning of manufacturing floor from the division of labor to the integration of labors
    • 1486351 (in Japanese)
    • Shinohara T (1997) Seru seisan mode: a great turning of manufacturing floor from the division of labor to the integration of labors. Nikkei Mech 497(1):39-41. (in Japanese)
    • (1997) Nikkei Mech , vol.497 , Issue.1 , pp. 39-41
    • Shinohara, T.1
  • 37
    • 14644394212 scopus 로고    scopus 로고
    • Cross-training in a cellular manufacturing environment
    • 10.1016/j.cie.2003.03.004
    • Slomp J, Bokhorst JAC, Molleman E (2005) Cross-training in a cellular manufacturing environment. Comput Ind Eng 48:609-624
    • (2005) Comput Ind Eng , vol.48 , pp. 609-624
    • Slomp, J.1    Bokhorst, J.A.C.2    Molleman, E.3
  • 38
    • 84865256583 scopus 로고    scopus 로고
    • Seru: The organizational extension of JIT for a super-talent factory
    • 10.4018/jsds.2012010104
    • Stecke KE, Yin Y, Kaku I, Murase Y (2012) Seru: the organizational extension of JIT for a super-talent factory. Int J Strateg Decis Sci 3(1):106-119
    • (2012) Int J Strateg Decis Sci , vol.3 , Issue.1 , pp. 106-119
    • Stecke, K.E.1    Yin, Y.2    Kaku, I.3    Murase, Y.4
  • 39
    • 36248981350 scopus 로고    scopus 로고
    • Multi-period operator assignment considering skills, learning and forgetting in labour-intensive cells
    • 10.1080/00207540601138551
    • Süer GA, Tummaluri RR (2008) Multi-period operator assignment considering skills, learning and forgetting in labour-intensive cells. Int J Prod Res 46(2):469-493
    • (2008) Int J Prod Res , vol.46 , Issue.2 , pp. 469-493
    • Süer, G.A.1    Tummaluri, R.R.2
  • 40
    • 40449122955 scopus 로고    scopus 로고
    • Manufacturing methods illustrated: Cell production system
    • Tokyo (in Japanese)
    • Takeuchi N (2006) Manufacturing methods illustrated: cell production system. JMA Management Center Inc.; Tokyo (in Japanese).
    • (2006) JMA Management Center Inc.
    • Takeuchi, N.1
  • 41
    • 0024731874 scopus 로고
    • A review of dual resource constrained systems research
    • 10.1080/07408178908966233
    • Treleven M (1989) A review of dual resource constrained systems research. IIE Trans 21(3):279-287
    • (1989) IIE Trans , vol.21 , Issue.3 , pp. 279-287
    • Treleven, M.1
  • 44
    • 0030784413 scopus 로고    scopus 로고
    • Cellular manufacturing at 46 user plants: Implementation experiences and performance improvements
    • 10.1080/002075497195966
    • Wemmerlov U, Johnson DJ (1997) Cellular manufacturing at 46 user plants: implementation experiences and performance improvements. Int J Prod Res 35(1):29-49
    • (1997) Int J Prod Res , vol.35 , Issue.1 , pp. 29-49
    • Wemmerlov, U.1    Johnson, D.J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.