메뉴 건너뛰기




Volumn 32, Issue 1, 2014, Pages 116-124

Risk management in small construction projects in Singapore: Status, barriers and impact

Author keywords

Barriers; Impact; Implementation; Project performance; Risk management; Small projects

Indexed keywords

INNOVATION; PROJECT MANAGEMENT;

EID: 84887219462     PISSN: 02637863     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijproman.2013.01.007     Document Type: Article
Times cited : (172)

References (52)
  • 2
    • 84887256246 scopus 로고    scopus 로고
    • The Application of Risk Management in Infrastructure Construction Projects. M.Sc Thesis, Nanyang Technological University, Singapore.
    • Ali, R., 2000. The Application of Risk Management in Infrastructure Construction Projects. M.Sc Thesis, Nanyang Technological University, Singapore.
    • (2000)
    • Ali, R.1
  • 3
    • 84925901561 scopus 로고
    • Ordinal-scaled variables and multivariate analysis: comment on Hawkes
    • Allan G.J.B. Ordinal-scaled variables and multivariate analysis: comment on Hawkes. The American Journal of Sociology 1976, 81(6):1498-1500.
    • (1976) The American Journal of Sociology , vol.81 , Issue.6 , pp. 1498-1500
    • Allan, G.J.B.1
  • 4
    • 34547768074 scopus 로고    scopus 로고
    • Likert scales and data analyses
    • Allen I.E., Seaman C.A. Likert scales and data analyses. Quality Progress 2007, 40(7):64-65.
    • (2007) Quality Progress , vol.40 , Issue.7 , pp. 64-65
    • Allen, I.E.1    Seaman, C.A.2
  • 5
    • 84976954801 scopus 로고
    • Weak measurements vs. strong statistics: an empirical critique of SS Stevens' proscriptions in statistics
    • Baker B.O., Hardyck C.D., Petrinovich L.F. Weak measurements vs. strong statistics: an empirical critique of SS Stevens' proscriptions in statistics. Educational and Psychological Measurement 1966, 26(2):291-309.
    • (1966) Educational and Psychological Measurement , vol.26 , Issue.2 , pp. 291-309
    • Baker, B.O.1    Hardyck, C.D.2    Petrinovich, L.F.3
  • 7
    • 84887247127 scopus 로고    scopus 로고
    • The Building and Construction Authority, Singapore, (Retrieved 12 February, 2012, from:
    • BCA Public Sector Projects to Sustain Construction Demand in 2012 2012, The Building and Construction Authority, Singapore, (Retrieved 12 February, 2012, from: http://www.bca.gov.sg/newsroom/others/pr11012012_CD.pdf).
    • (2012) BCA Public Sector Projects to Sustain Construction Demand in 2012
  • 8
    • 0002274623 scopus 로고
    • Restrictions on statistics imposed by method of measurement: some reality, much mythology
    • Binder A. Restrictions on statistics imposed by method of measurement: some reality, much mythology. Journal of Criminal Justice 1984, 12(5):467-481.
    • (1984) Journal of Criminal Justice , vol.12 , Issue.5 , pp. 467-481
    • Binder, A.1
  • 10
    • 56649084868 scopus 로고    scopus 로고
    • Resolving the 50-year debate around using and misusing Likert scales
    • Carifio J., Perla R. Resolving the 50-year debate around using and misusing Likert scales. Medical Education 2008, 42(12):1150-1152.
    • (2008) Medical Education , vol.42 , Issue.12 , pp. 1150-1152
    • Carifio, J.1    Perla, R.2
  • 13
    • 84887216974 scopus 로고    scopus 로고
    • Construction Industry Institute, Austin, TX
    • CII Small Projects Toolkit 2001, Construction Industry Institute, Austin, TX.
    • (2001) CII Small Projects Toolkit
  • 17
    • 0004551724 scopus 로고    scopus 로고
    • Using a weighted score model as an aid to selecting procurement methods for small building works
    • Griffith A., Headley J.D. Using a weighted score model as an aid to selecting procurement methods for small building works. Construction Management & Economics 1997, 15(4):341-348.
    • (1997) Construction Management & Economics , vol.15 , Issue.4 , pp. 341-348
    • Griffith, A.1    Headley, J.D.2
  • 20
    • 0001196856 scopus 로고
    • Adoption of probabilistic risk analysis in capital budgeting and corporate investment
    • Ho S.S.M., Pike R.H. Adoption of probabilistic risk analysis in capital budgeting and corporate investment. Journal of Business Finance and Accounting 1992, 19(3):387-405.
    • (1992) Journal of Business Finance and Accounting , vol.19 , Issue.3 , pp. 387-405
    • Ho, S.S.M.1    Pike, R.H.2
  • 21
    • 77952545254 scopus 로고    scopus 로고
    • An analysis for the causes of accidents of repair, maintenance, alteration and addition works in Hong Kong
    • Hon C.K.H., Chan A.P.C., Wong F.K.W. An analysis for the causes of accidents of repair, maintenance, alteration and addition works in Hong Kong. Safety Science 2010, 48(7):894-901.
    • (2010) Safety Science , vol.48 , Issue.7 , pp. 894-901
    • Hon, C.K.H.1    Chan, A.P.C.2    Wong, F.K.W.3
  • 23
    • 84865384217 scopus 로고    scopus 로고
    • Construction project change management in Singapore: status, importance and impact
    • Hwang B.G., Low L.K. Construction project change management in Singapore: status, importance and impact. International Journal of Project Management 2012, 30(7):817-826.
    • (2012) International Journal of Project Management , vol.30 , Issue.7 , pp. 817-826
    • Hwang, B.G.1    Low, L.K.2
  • 24
    • 84925894405 scopus 로고
    • Multivariate analysis of ordinal variables
    • Kim J.O. Multivariate analysis of ordinal variables. The American Journal of Sociology 1975, 81(2):261-298.
    • (1975) The American Journal of Sociology , vol.81 , Issue.2 , pp. 261-298
    • Kim, J.O.1
  • 26
    • 0000803861 scopus 로고
    • In defense of assigning numbers to ranks
    • Labovitz S. In defense of assigning numbers to ranks. American Sociological Review 1971, 36(3):521-522.
    • (1971) American Sociological Review , vol.36 , Issue.3 , pp. 521-522
    • Labovitz, S.1
  • 27
    • 84887214756 scopus 로고    scopus 로고
    • Small Project Benchmarking. Ph.D Thesis, The University of Texas at Austin, Austin, TX.
    • Liang, L., 2005. Small Project Benchmarking. Ph.D Thesis, The University of Texas at Austin, Austin, TX.
    • (2005)
    • Liang, L.1
  • 28
    • 56749097044 scopus 로고    scopus 로고
    • Key project management practices affecting Singaporean firms' project performance in China
    • Ling F.Y.Y., Low S.P., Wang S.Q., Lim H.H. Key project management practices affecting Singaporean firms' project performance in China. International Journal of Project Management 2009, 27(1):59-71.
    • (2009) International Journal of Project Management , vol.27 , Issue.1 , pp. 59-71
    • Ling, F.Y.Y.1    Low, S.P.2    Wang, S.Q.3    Lim, H.H.4
  • 29
    • 0345098580 scopus 로고    scopus 로고
    • Project risk management in the Queensland engineering construction industry: a survey
    • Lyons T., Skitmore M. Project risk management in the Queensland engineering construction industry: a survey. International Journal of Project Management 2004, 22(1):51-61.
    • (2004) International Journal of Project Management , vol.22 , Issue.1 , pp. 51-61
    • Lyons, T.1    Skitmore, M.2
  • 30
    • 84986127808 scopus 로고    scopus 로고
    • A systematic approach to risk management for construction
    • Mills A. A systematic approach to risk management for construction. Structural Survey 2001, 19(5):245-252.
    • (2001) Structural Survey , vol.19 , Issue.5 , pp. 245-252
    • Mills, A.1
  • 31
    • 0343762220 scopus 로고    scopus 로고
    • Practices, barriers and benefits of risk management process in building services cost estimation
    • Mok C.K., Tummala V.M.R., Leung H.M. Practices, barriers and benefits of risk management process in building services cost estimation. Construction Management and Economics 1997, 15(2):161-175.
    • (1997) Construction Management and Economics , vol.15 , Issue.2 , pp. 161-175
    • Mok, C.K.1    Tummala, V.M.R.2    Leung, H.M.3
  • 33
    • 78649906763 scopus 로고    scopus 로고
    • Likert scales, levels of measurement and the "laws" of statistics
    • Norman G. Likert scales, levels of measurement and the "laws" of statistics. Advances in Health Sciences Education 2010, 15(5):625-632.
    • (2010) Advances in Health Sciences Education , vol.15 , Issue.5 , pp. 625-632
    • Norman, G.1
  • 34
    • 0002531490 scopus 로고
    • The study of change in evaluation research: principles con-concerning measurement, experimental design and analysis
    • Sage, Beverly Hills, CA, E.L. Streuning, M. Guttentag (Eds.)
    • Nunnally J.C. The study of change in evaluation research: principles con-concerning measurement, experimental design and analysis. Handbook of Evaluation Research 1975, 101-138. Sage, Beverly Hills, CA. E.L. Streuning, M. Guttentag (Eds.).
    • (1975) Handbook of Evaluation Research , pp. 101-138
    • Nunnally, J.C.1
  • 35
    • 0018666370 scopus 로고
    • The use of Pearson's R with ordinal data
    • O'Brien R.M. The use of Pearson's R with ordinal data. American Sociological Review 1979, 44(5):851-857.
    • (1979) American Sociological Review , vol.44 , Issue.5 , pp. 851-857
    • O'Brien, R.M.1
  • 37
    • 24744453256 scopus 로고    scopus 로고
    • Principles and guidelines for project risk management
    • Pennock M., Haimes Y. Principles and guidelines for project risk management. Systems Engineering 2002, 5(2):89-108.
    • (2002) Systems Engineering , vol.5 , Issue.2 , pp. 89-108
    • Pennock, M.1    Haimes, Y.2
  • 42
  • 46
    • 33751259298 scopus 로고    scopus 로고
    • Relating risk to project performance in Indonesian building contracts
    • Wiguna I.P.A., Scott S. Relating risk to project performance in Indonesian building contracts. Construction Management and Economics 2006, 24(11):1125-1135.
    • (2006) Construction Management and Economics , vol.24 , Issue.11 , pp. 1125-1135
    • Wiguna, I.P.A.1    Scott, S.2
  • 47
    • 0344031908 scopus 로고    scopus 로고
    • Lowest price or value? Investigation of UK construction clients' tender selection process
    • Wong C.H., Holt G.D., Cooper P.A. Lowest price or value? Investigation of UK construction clients' tender selection process. Construction Management and Economics 2000, 18(7):767-774.
    • (2000) Construction Management and Economics , vol.18 , Issue.7 , pp. 767-774
    • Wong, C.H.1    Holt, G.D.2    Cooper, P.A.3
  • 48
    • 84887215364 scopus 로고    scopus 로고
    • Workplace Safety and Health Council, Singapore, (Retrieved November 4, 2011, from:
    • WSHC Risk Management Assistance Fund 2011, Workplace Safety and Health Council, Singapore, (Retrieved November 4, 2011, from: https://www.wshc.sg/wps/portal/rmaf).
    • (2011) WSHC Risk Management Assistance Fund
  • 50
    • 84875106439 scopus 로고    scopus 로고
    • Identifying the critical risks in underground rail international construction joint ventures: case study of Singapore
    • Zhao X., Hwang B.G., Yu G.S. Identifying the critical risks in underground rail international construction joint ventures: case study of Singapore. International Journal of Project Management 2012, (http://dx.doi.org/10.1016/j.ijproman.2012.10.014).
    • (2012) International Journal of Project Management
    • Zhao, X.1    Hwang, B.G.2    Yu, G.S.3
  • 51
    • 77955315626 scopus 로고    scopus 로고
    • Understanding and improving your risk management capability: assessment model for construction organizations
    • Zou P.X.W., Chen Y., Chan T.Y. Understanding and improving your risk management capability: assessment model for construction organizations. Journal of Construction Engineering Management 2010, 136(8):854-863.
    • (2010) Journal of Construction Engineering Management , vol.136 , Issue.8 , pp. 854-863
    • Zou, P.X.W.1    Chen, Y.2    Chan, T.Y.3
  • 52
    • 21344482061 scopus 로고
    • Is the selection of statistical methods governed by level of measurement?
    • Zumbo B.D., Zimmerman D.W. Is the selection of statistical methods governed by level of measurement?. Canadian Psychology/Psychologie Canadienne 1993, 34(4):390-400.
    • (1993) Canadian Psychology/Psychologie Canadienne , vol.34 , Issue.4 , pp. 390-400
    • Zumbo, B.D.1    Zimmerman, D.W.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.