The Application of Risk Management in Infrastructure Construction Projects. M.Sc Thesis, Nanyang Technological University, Singapore.
-
Ali, R., 2000. The Application of Risk Management in Infrastructure Construction Projects. M.Sc Thesis, Nanyang Technological University, Singapore.
-
(2000)
-
-
Ali, R.1
-
3
-
-
84925901561
-
Ordinal-scaled variables and multivariate analysis: comment on Hawkes
-
Allan G.J.B. Ordinal-scaled variables and multivariate analysis: comment on Hawkes. The American Journal of Sociology 1976, 81(6):1498-1500.
-
(1976)
The American Journal of Sociology
, vol.81
, Issue.6
, pp. 1498-1500
-
-
Allan, G.J.B.1
-
4
-
-
34547768074
-
Likert scales and data analyses
-
Allen I.E., Seaman C.A. Likert scales and data analyses. Quality Progress 2007, 40(7):64-65.
-
(2007)
Quality Progress
, vol.40
, Issue.7
, pp. 64-65
-
-
Allen, I.E.1
Seaman, C.A.2
-
5
-
-
84976954801
-
Weak measurements vs. strong statistics: an empirical critique of SS Stevens' proscriptions in statistics
-
Baker B.O., Hardyck C.D., Petrinovich L.F. Weak measurements vs. strong statistics: an empirical critique of SS Stevens' proscriptions in statistics. Educational and Psychological Measurement 1966, 26(2):291-309.
-
(1966)
Educational and Psychological Measurement
, vol.26
, Issue.2
, pp. 291-309
-
-
Baker, B.O.1
Hardyck, C.D.2
Petrinovich, L.F.3
-
7
-
-
84887247127
-
-
The Building and Construction Authority, Singapore, (Retrieved 12 February, 2012, from:
-
BCA Public Sector Projects to Sustain Construction Demand in 2012 2012, The Building and Construction Authority, Singapore, (Retrieved 12 February, 2012, from: http://www.bca.gov.sg/newsroom/others/pr11012012_CD.pdf).
-
(2012)
BCA Public Sector Projects to Sustain Construction Demand in 2012
-
-
-
8
-
-
0002274623
-
Restrictions on statistics imposed by method of measurement: some reality, much mythology
-
Binder A. Restrictions on statistics imposed by method of measurement: some reality, much mythology. Journal of Criminal Justice 1984, 12(5):467-481.
-
(1984)
Journal of Criminal Justice
, vol.12
, Issue.5
, pp. 467-481
-
-
Binder, A.1
-
10
-
-
56649084868
-
Resolving the 50-year debate around using and misusing Likert scales
-
Carifio J., Perla R. Resolving the 50-year debate around using and misusing Likert scales. Medical Education 2008, 42(12):1150-1152.
-
(2008)
Medical Education
, vol.42
, Issue.12
, pp. 1150-1152
-
-
Carifio, J.1
Perla, R.2
-
11
-
-
0003486293
-
-
Wiley, Chichester, England
-
Chapman C., Ward S. Project Risk Management: Processes, Techniques and Insights 2003, Wiley, Chichester, England. 2nd ed.
-
(2003)
Project Risk Management: Processes, Techniques and Insights
-
-
Chapman, C.1
Ward, S.2
-
13
-
-
84887216974
-
-
Construction Industry Institute, Austin, TX
-
CII Small Projects Toolkit 2001, Construction Industry Institute, Austin, TX.
-
(2001)
CII Small Projects Toolkit
-
-
-
17
-
-
0004551724
-
Using a weighted score model as an aid to selecting procurement methods for small building works
-
Griffith A., Headley J.D. Using a weighted score model as an aid to selecting procurement methods for small building works. Construction Management & Economics 1997, 15(4):341-348.
-
(1997)
Construction Management & Economics
, vol.15
, Issue.4
, pp. 341-348
-
-
Griffith, A.1
Headley, J.D.2
-
20
-
-
0001196856
-
Adoption of probabilistic risk analysis in capital budgeting and corporate investment
-
Ho S.S.M., Pike R.H. Adoption of probabilistic risk analysis in capital budgeting and corporate investment. Journal of Business Finance and Accounting 1992, 19(3):387-405.
-
(1992)
Journal of Business Finance and Accounting
, vol.19
, Issue.3
, pp. 387-405
-
-
Ho, S.S.M.1
Pike, R.H.2
-
21
-
-
77952545254
-
An analysis for the causes of accidents of repair, maintenance, alteration and addition works in Hong Kong
-
Hon C.K.H., Chan A.P.C., Wong F.K.W. An analysis for the causes of accidents of repair, maintenance, alteration and addition works in Hong Kong. Safety Science 2010, 48(7):894-901.
-
(2010)
Safety Science
, vol.48
, Issue.7
, pp. 894-901
-
-
Hon, C.K.H.1
Chan, A.P.C.2
Wong, F.K.W.3
-
23
-
-
84865384217
-
Construction project change management in Singapore: status, importance and impact
-
Hwang B.G., Low L.K. Construction project change management in Singapore: status, importance and impact. International Journal of Project Management 2012, 30(7):817-826.
-
(2012)
International Journal of Project Management
, vol.30
, Issue.7
, pp. 817-826
-
-
Hwang, B.G.1
Low, L.K.2
-
24
-
-
84925894405
-
Multivariate analysis of ordinal variables
-
Kim J.O. Multivariate analysis of ordinal variables. The American Journal of Sociology 1975, 81(2):261-298.
-
(1975)
The American Journal of Sociology
, vol.81
, Issue.2
, pp. 261-298
-
-
Kim, J.O.1
-
26
-
-
0000803861
-
In defense of assigning numbers to ranks
-
Labovitz S. In defense of assigning numbers to ranks. American Sociological Review 1971, 36(3):521-522.
-
(1971)
American Sociological Review
, vol.36
, Issue.3
, pp. 521-522
-
-
Labovitz, S.1
-
27
-
-
84887214756
-
-
Small Project Benchmarking. Ph.D Thesis, The University of Texas at Austin, Austin, TX.
-
Liang, L., 2005. Small Project Benchmarking. Ph.D Thesis, The University of Texas at Austin, Austin, TX.
-
(2005)
-
-
Liang, L.1
-
28
-
-
56749097044
-
Key project management practices affecting Singaporean firms' project performance in China
-
Ling F.Y.Y., Low S.P., Wang S.Q., Lim H.H. Key project management practices affecting Singaporean firms' project performance in China. International Journal of Project Management 2009, 27(1):59-71.
-
(2009)
International Journal of Project Management
, vol.27
, Issue.1
, pp. 59-71
-
-
Ling, F.Y.Y.1
Low, S.P.2
Wang, S.Q.3
Lim, H.H.4
-
29
-
-
0345098580
-
Project risk management in the Queensland engineering construction industry: a survey
-
Lyons T., Skitmore M. Project risk management in the Queensland engineering construction industry: a survey. International Journal of Project Management 2004, 22(1):51-61.
-
(2004)
International Journal of Project Management
, vol.22
, Issue.1
, pp. 51-61
-
-
Lyons, T.1
Skitmore, M.2
-
30
-
-
84986127808
-
A systematic approach to risk management for construction
-
Mills A. A systematic approach to risk management for construction. Structural Survey 2001, 19(5):245-252.
-
(2001)
Structural Survey
, vol.19
, Issue.5
, pp. 245-252
-
-
Mills, A.1
-
31
-
-
0343762220
-
Practices, barriers and benefits of risk management process in building services cost estimation
-
Mok C.K., Tummala V.M.R., Leung H.M. Practices, barriers and benefits of risk management process in building services cost estimation. Construction Management and Economics 1997, 15(2):161-175.
-
(1997)
Construction Management and Economics
, vol.15
, Issue.2
, pp. 161-175
-
-
Mok, C.K.1
Tummala, V.M.R.2
Leung, H.M.3
-
33
-
-
78649906763
-
Likert scales, levels of measurement and the "laws" of statistics
-
Norman G. Likert scales, levels of measurement and the "laws" of statistics. Advances in Health Sciences Education 2010, 15(5):625-632.
-
(2010)
Advances in Health Sciences Education
, vol.15
, Issue.5
, pp. 625-632
-
-
Norman, G.1
-
34
-
-
0002531490
-
The study of change in evaluation research: principles con-concerning measurement, experimental design and analysis
-
Sage, Beverly Hills, CA, E.L. Streuning, M. Guttentag (Eds.)
-
Nunnally J.C. The study of change in evaluation research: principles con-concerning measurement, experimental design and analysis. Handbook of Evaluation Research 1975, 101-138. Sage, Beverly Hills, CA. E.L. Streuning, M. Guttentag (Eds.).
-
(1975)
Handbook of Evaluation Research
, pp. 101-138
-
-
Nunnally, J.C.1
-
35
-
-
0018666370
-
The use of Pearson's R with ordinal data
-
O'Brien R.M. The use of Pearson's R with ordinal data. American Sociological Review 1979, 44(5):851-857.
-
(1979)
American Sociological Review
, vol.44
, Issue.5
, pp. 851-857
-
-
O'Brien, R.M.1
-
37
-
-
24744453256
-
Principles and guidelines for project risk management
-
Pennock M., Haimes Y. Principles and guidelines for project risk management. Systems Engineering 2002, 5(2):89-108.
-
(2002)
Systems Engineering
, vol.5
, Issue.2
, pp. 89-108
-
-
Pennock, M.1
Haimes, Y.2
-
46
-
-
33751259298
-
Relating risk to project performance in Indonesian building contracts
-
Wiguna I.P.A., Scott S. Relating risk to project performance in Indonesian building contracts. Construction Management and Economics 2006, 24(11):1125-1135.
-
(2006)
Construction Management and Economics
, vol.24
, Issue.11
, pp. 1125-1135
-
-
Wiguna, I.P.A.1
Scott, S.2
-
47
-
-
0344031908
-
Lowest price or value? Investigation of UK construction clients' tender selection process
-
Wong C.H., Holt G.D., Cooper P.A. Lowest price or value? Investigation of UK construction clients' tender selection process. Construction Management and Economics 2000, 18(7):767-774.
-
(2000)
Construction Management and Economics
, vol.18
, Issue.7
, pp. 767-774
-
-
Wong, C.H.1
Holt, G.D.2
Cooper, P.A.3
-
48
-
-
84887215364
-
-
Workplace Safety and Health Council, Singapore, (Retrieved November 4, 2011, from:
-
WSHC Risk Management Assistance Fund 2011, Workplace Safety and Health Council, Singapore, (Retrieved November 4, 2011, from: https://www.wshc.sg/wps/portal/rmaf).
-
(2011)
WSHC Risk Management Assistance Fund
-
-
-
49
-
-
77952930622
-
Prediction system for change management in construction project
-
Zhao Z.Y., Lv Q.L., Zuo J., Zillante G. Prediction system for change management in construction project. Journal of Construction Engineering Management 2010, 136(6):659-669.
-
(2010)
Journal of Construction Engineering Management
, vol.136
, Issue.6
, pp. 659-669
-
-
Zhao, Z.Y.1
Lv, Q.L.2
Zuo, J.3
Zillante, G.4
-
50
-
-
84875106439
-
Identifying the critical risks in underground rail international construction joint ventures: case study of Singapore
-
Zhao X., Hwang B.G., Yu G.S. Identifying the critical risks in underground rail international construction joint ventures: case study of Singapore. International Journal of Project Management 2012, (http://dx.doi.org/10.1016/j.ijproman.2012.10.014).
-
(2012)
International Journal of Project Management
-
-
Zhao, X.1
Hwang, B.G.2
Yu, G.S.3
-
51
-
-
77955315626
-
Understanding and improving your risk management capability: assessment model for construction organizations
-
Zou P.X.W., Chen Y., Chan T.Y. Understanding and improving your risk management capability: assessment model for construction organizations. Journal of Construction Engineering Management 2010, 136(8):854-863.
-
(2010)
Journal of Construction Engineering Management
, vol.136
, Issue.8
, pp. 854-863
-
-
Zou, P.X.W.1
Chen, Y.2
Chan, T.Y.3
-
52
-
-
21344482061
-
Is the selection of statistical methods governed by level of measurement?
-
Zumbo B.D., Zimmerman D.W. Is the selection of statistical methods governed by level of measurement?. Canadian Psychology/Psychologie Canadienne 1993, 34(4):390-400.
-
(1993)
Canadian Psychology/Psychologie Canadienne
, vol.34
, Issue.4
, pp. 390-400
-
-
Zumbo, B.D.1
Zimmerman, D.W.2
|