Relating risk to project performance in Indonesian building contracts

Author keywords

Building project; Path analysis; Project delay; Project performance; Risk management

Indexed keywords

CRITICAL PATH ANALYSIS; RISK ASSESSMENT; SCHEDULING;

EID: 33751259298     PISSN: 01446193     EISSN: 1466433X     Source Type: Journal    
DOI: 10.1080/01446190600799760     Document Type: Article
Times cited : (28)

References (37)
  • 1
    • 0031705846 scopus 로고    scopus 로고
    • Factors affecting contractors' risk of cost overburden
    • Akinci, B. and Fischer, M. (1998) Factors affecting contractors' risk of cost overburden. Journal of Management in Engineering, 14((1)), pp. 67-76.
    • (1998) Journal of Management in Engineering , vol.14 , Issue.1 , pp. 67-76
    • Akinci, B.1    Fischer, M.2
  • 2
    • 0003486292 scopus 로고    scopus 로고
    • APM. In Norwich Norfolk: The APM Group Ltd
    • APM. (1997). In Project Risk Analysis and Management. Norwich Norfolk: The APM Group Ltd.
    • (1997) Project Risk Analysis and Management
  • 4
    • 0003669844 scopus 로고    scopus 로고
    • AS/NZS. In Standards Association of Australia
    • AS/NZS.(1999). In Risk Management. Standards Association of Australia
    • (1999) Risk Management
  • 6
    • 0008752005 scopus 로고    scopus 로고
    • An analysis of contractors' approaches to risk identification in New South Wales, Australia
    • Bajaj, D. and Oluwoye, J. and Lenard, D. (1997) An analysis of contractors' approaches to risk identification in New South Wales, Australia. Construction Management and Economics, 15, pp. 363-9.
    • (1997) Construction Management and Economics , vol.15 , pp. 363-369
    • Bajaj, D.1    Oluwoye, J.2    Lenard, D.3
  • 7
    • 0242411261 scopus 로고    scopus 로고
    • Risk response techniques employed currently for major projects
    • Baker, S. and Ponniah, D. and Smith, S. (1999) Risk response techniques employed currently for major projects. Construction Management and Economics, 17((2)), pp. 205-13.
    • (1999) Construction Management and Economics , vol.17 , Issue.2 , pp. 205-213
    • Baker, S.1    Ponniah, D.2    Smith, S.3
  • 10
    • 0031078243 scopus 로고    scopus 로고
    • A comparative study of causes of time overruns in Hong Kong construction projects
    • Chan, D. W. and Kumaraswamy, M. M. (1997) A comparative study of causes of time overruns in Hong Kong construction projects. International Journal of Project Management, 15((1)), pp. 55-63.
    • (1997) International Journal of Project Management , vol.15 , Issue.1 , pp. 55-63
    • Chan, D.W.1    Kumaraswamy, M.M.2
  • 11
    • 84948516864 scopus 로고
    • A study of the factors affecting construction durations in Hong Kong
    • Chan, D. W. M. and Kumaraswamy, M. M. (1995) A study of the factors affecting construction durations in Hong Kong. Construction Management and Economics, 13((4)), pp. 319-34.
    • (1995) Construction Management and Economics , vol.13 , Issue.4 , pp. 319-334
    • Chan, D.W.M.1    Kumaraswamy, M.M.2
  • 12
    • 0029747848 scopus 로고    scopus 로고
    • Company and project evaluation model for privately promoted infrastructure projects
    • Dias, A. J. and Ioannou, P. G. (1996) Company and project evaluation model for privately promoted infrastructure projects. Journal of Construction Engineering and Management, 122((1)), pp. 71-82.
    • (1996) Journal of Construction Engineering and Management , vol.122 , Issue.1 , pp. 71-82
    • Dias, A.J.1    Ioannou, P.G.2
  • 14
    • 0033689577 scopus 로고    scopus 로고
    • ICRAM-1: Model for international construction risk assessment
    • Hastak, M. and Shaked, A. (2000) ICRAM-1: Model for international construction risk assessment. Journal of Management in Engineering, 16((1)), pp. 59-69.
    • (2000) Journal of Management in Engineering , vol.16 , Issue.1 , pp. 59-69
    • Hastak, M.1    Shaked, A.2
  • 16
    • 0001361084 scopus 로고
    • Relationship between value and duration of construction projects
    • Kaka, A. and Price, A. D. F. (1991) Relationship between value and duration of construction projects. Construction Management and Economics, 9((4)), pp. 383-400.
    • (1991) Construction Management and Economics , vol.9 , Issue.4 , pp. 383-400
    • Kaka, A.1    Price, A.D.F.2
  • 17
    • 0029469867 scopus 로고
    • Risk management perceptions and trends of US construction
    • Kangari, R. (1995) Risk management perceptions and trends of US construction. Journal of Construction Engineering and Management, 121((4)), pp. 422-9.
    • (1995) Journal of Construction Engineering and Management , vol.121 , Issue.4 , pp. 422-429
    • Kangari, R.1
  • 18
    • 0035426616 scopus 로고    scopus 로고
    • Risk and its management in the Kuwaiti construction industry: A contractors' perspective
    • Kartam, N. A. and Kartam, S. A. (2001) Risk and its management in the Kuwaiti construction industry: A contractors' perspective. International Journal of Project Management, 19((6)), pp. 325-35.
    • (2001) International Journal of Project Management , vol.19 , Issue.6 , pp. 325-335
    • Kartam, N.A.1    Kartam, S.A.2
  • 21
    • 0004237984 scopus 로고
    • In Pacific Grove CA: Boxwood Press
    • Li, C. C.(1975). In Path Analysis: A Primer. Pacific Grove CA: Boxwood Press.
    • (1975) Path Analysis: A Primer
    • Li, C.C.1
  • 25
    • 0002733516 scopus 로고
    • Construction time-influencing factors: The contractor's perspective
    • Nkado, R. N. (1995) Construction time-influencing factors: The contractor's perspective. Construction Management and Economics, 13((1)), pp. 81-9.
    • (1995) Construction Management and Economics , vol.13 , Issue.1 , pp. 81-89
    • Nkado, R.N.1
  • 28
    • 84993077991 scopus 로고    scopus 로고
    • Risk management trends in the construction industry: Moving towards joint risk management
    • Rahman, M. M. and Kumaraswamy, M. M. (2002) Risk management trends in the construction industry: Moving towards joint risk management. Engineering Construction and Architectural Management, 9((2)), pp. 131-51.
    • (2002) Engineering Construction and Architectural Management , vol.9 , Issue.2 , pp. 131-151
    • Rahman, M.M.1    Kumaraswamy, M.M.2
  • 29
    • 0035201702 scopus 로고    scopus 로고
    • Use and benefits of tools for project risk management
    • Raz, T. and Michael, E. (2001) Use and benefits of tools for project risk management. International Journal of Project Management, 19((1)), pp. 9-17.
    • (2001) International Journal of Project Management , vol.19 , Issue.1 , pp. 9-17
    • Raz, T.1    Michael, E.2
  • 33
    • 14744304262 scopus 로고    scopus 로고
    • Risk allocation and risk handling of highway projects in Taiwan
    • Wang, M.-T. and Chou, H.-Y. (2003) Risk allocation and risk handling of highway projects in Taiwan. Journal of Management in Engineering, 19((2)), pp. 60-8.
    • (2003) Journal of Management in Engineering , vol.19 , Issue.2 , pp. 60-68
    • Wang, M.-T.1    Chou, H.-Y.2
  • 34
  • 36
    • 0036160566 scopus 로고    scopus 로고
    • Prototype model for build-operate-transfer risk assessment
    • Zayed, T. M. and Chang, L.-M. (2002) Prototype model for build-operate-transfer risk assessment. Journal of Management in Engineering, 18((1)), pp. 7-16.
    • (2002) Journal of Management in Engineering , vol.18 , Issue.1 , pp. 7-16
    • Zayed, T.M.1    Chang, L.-M.2
  • 37
    • 0011127465 scopus 로고
    • Risk management for overseas construction projects
    • Zhi, H. (1995) Risk management for overseas construction projects. International Journal of Project Management, 13((4)), pp. 231-7.
    • (1995) International Journal of Project Management , vol.13 , Issue.4 , pp. 231-237
    • Zhi, H.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.