메뉴 건너뛰기




Volumn 51, Issue 20, 2013, Pages 6229-6246

Multi-period lot sizing and job shop scheduling with compressible process times for multilevel product structures

Author keywords

Job shop; Lot sizing; Multi level; Process compressibility; Scheduling

Indexed keywords

JOB SHOP; JOB SHOP ENVIRONMENT; JOB-SHOP SCHEDULING; LOT SIZING; LOT-SIZING AND SCHEDULING; MULTI-LEVEL; MULTI-LEVEL STRUCTURES; PROCESS COMPRESSIBILITIES;

EID: 84885630855     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2013.825743     Document Type: Article
Times cited : (12)

References (26)
  • 1
    • 0022234268 scopus 로고
    • Simultaneous lot sizing and sequencing for multistage production systems
    • Afentakis, P. 1985. "Simultaneous Lot Sizing and Sequencing for Multistage Production Systems." IIE Transactions 17: 327-331.
    • (1985) IIE Transactions , vol.17 , pp. 327-331
    • Afentakis, P.1
  • 6
    • 0012712572 scopus 로고    scopus 로고
    • A capacity-oriented hierarchical approach to single-item and small-batch production planning using project-scheduling methods
    • Franck, B., K. Neumann, and C. Schwindt. 1997. "A Capacity-oriented Hierarchical Approach to Single-item and Small-batch Production Planning Using Project-scheduling Methods." OR Spektrum 19: 77-85.
    • (1997) OR Spektrum , vol.19 , pp. 77-85
    • Franck, B.1    Neumann, K.2    Schwindt, C.3
  • 7
    • 79952624870 scopus 로고    scopus 로고
    • An efficient memetic algorithm for solving the job shop scheduling problem
    • Gao, L., G. Zhang, L. Zhang, and X. Li. 2011. "An Efficient Memetic Algorithm for Solving the Job Shop Scheduling Problem." Computers & Industrial Engineering 60: 699-705.
    • (2011) Computers & Industrial Engineering , vol.60 , pp. 699-705
    • Gao, L.1    Zhang, G.2    Zhang, L.3    Li, X.4
  • 8
    • 0035384294 scopus 로고    scopus 로고
    • A common cycle approach to lot-scheduling in multistage manufacturing systems
    • Hennet, J. C. 2001. "A Common Cycle Approach to Lot-scheduling in Multistage Manufacturing Systems." Production Planning & Control 12: 362-371.
    • (2001) Production Planning & Control , vol.12 , pp. 362-371
    • Hennet, J.C.1
  • 9
    • 74449083168 scopus 로고    scopus 로고
    • Multi-objective Job-shop scheduling with Lot-splitting Production
    • Huang, R. H. 2010. "Multi-objective Job-shop scheduling with Lot-splitting Production." International Journal of Production Economics 124: 206-213.
    • (2010) International Journal of Production Economics , vol.124 , pp. 206-213
    • Huang, R.H.1
  • 10
    • 0032216046 scopus 로고    scopus 로고
    • Effective continuous-time formulation for short-term scheduling. 2. Continuous and semicontinuous processes
    • Ierapetritou, M. G., and C. A. Floudas. 1998. "Effective Continuous-time Formulation for Short-term Scheduling. 2. Continuous and Semicontinuous Processes." Industrial Engineering and Chemical Research 37: 4360-4374.
    • (1998) Industrial Engineering and Chemical Research , vol.37 , pp. 4360-4374
    • Ierapetritou, M.G.1    Floudas, C.A.2
  • 11
    • 54249105631 scopus 로고    scopus 로고
    • Short-term scheduling of batch plants with multiple intermediate due dates
    • Ierapetritou, M. G., T. S. Hene, and C. A. Floudas. 1999. "Short-term Scheduling of Batch Plants with Multiple Intermediate Due Dates." Computers and Chemical Engineering 23: 515-518.
    • (1999) Computers and Chemical Engineering , vol.23 , pp. 515-518
    • Ierapetritou, M.G.1    Hene, T.S.2    Floudas, C.A.3
  • 12
    • 0030244109 scopus 로고    scopus 로고
    • Simulated annealing and genetic algorithms for scheduling products with multi-level product structure
    • Kim, J. U., and Y. D. Kim. 1996. "Simulated Annealing and Genetic Algorithms for Scheduling Products with Multi-level Product Structure." Computers & Operations Research 23: 857-868.
    • (1996) Computers & Operations Research , vol.23 , pp. 857-868
    • Kim, J.U.1    Kim, Y.D.2
  • 13
    • 0027545176 scopus 로고
    • A general algorithm for short-term scheduling of batch operations-I. Milp formulation
    • Kondili, E., C. C. Pantelides, and R. W. H. Sargent. 1993. "A General Algorithm for Short-term Scheduling of Batch Operations-I. MILP Formulation." Computers and Chemical Engineering 17: 211-227.
    • (1993) Computers and Chemical Engineering , vol.17 , pp. 211-227
    • Kondili, E.1    Pantelides, C.C.2    Sargent, R.W.H.3
  • 14
    • 84855278833 scopus 로고    scopus 로고
    • Memetic algorithms and memetic computing optimization: A literature review
    • Neri, F., and C. Cotta. 2012. "Memetic Algorithms and Memetic Computing Optimization: A Literature Review." Swarm and Evolutionary Computation 2: 1-14.
    • (2012) Swarm and Evolutionary Computation , vol.2 , pp. 1-14
    • Neri, F.1    Cotta, C.2
  • 16
    • 0035546154 scopus 로고    scopus 로고
    • The finite horizon economic lot sizing problem in job shops: The multiple cycle approach
    • Ouenniche, J., and J. W. M. Bertrand. 2001. "The Finite Horizon Economic Lot Sizing Problem in Job Shops: the Multiple Cycle Approach." International Journal of Production Economics 74: 49-61.
    • (2001) International Journal of Production Economics , vol.74 , pp. 49-61
    • Ouenniche, J.1    Bertrand, J.W.M.2
  • 17
    • 72049116023 scopus 로고    scopus 로고
    • Capacitated lot sizing with linked lots for general product structures in job shops
    • Ozturk, C., and A. M. Orneck. 2010. "Capacitated Lot Sizing with Linked Lots for General Product Structures in Job Shops." Computers & Industrial Engineering 58: 151-164.
    • (2010) Computers & Industrial Engineering , vol.58 , pp. 151-164
    • Ozturk, C.1    Orneck, A.M.2
  • 19
    • 0001775820 scopus 로고    scopus 로고
    • Batch scheduling in process industries: An application of resource-constrained project scheduling
    • Schwindt, C., and N. Trautmann. 2000. "Batch Scheduling in Process Industries: an Application of Resource-constrained Project Scheduling." OR Spektrum 22: 501-524.
    • (2000) OR Spektrum , vol.22 , pp. 501-524
    • Schwindt, C.1    Trautmann, N.2
  • 20
    • 29344475492 scopus 로고    scopus 로고
    • Multilevel capacitated lot-sizing and resource-constrained project scheduling: An integrating perspective
    • Stadtler, H. 2005. "Multilevel Capacitated Lot-sizing and Resource-constrained Project Scheduling: An Integrating Perspective." International Journal of Production Research 43: 5253-5270.
    • (2005) International Journal of Production Research , vol.43 , pp. 5253-5270
    • Stadtler, H.1
  • 23
    • 37849188714 scopus 로고    scopus 로고
    • Hybrid flow shop scheduling as a multi-mode multi-project scheduling problem with batching requirements: A real-world application
    • Vob, S., and A. Witt. 2007. "Hybrid Flow Shop Scheduling as a Multi-mode Multi-project Scheduling Problem with Batching Requirements: A Real-world Application." International Journal of Production Economics 105: 445-458.
    • (2007) International Journal of Production Economics , vol.105 , pp. 445-458
    • Vob, S.1    Witt, A.2
  • 24
    • 69649103114 scopus 로고    scopus 로고
    • A resource-constrained assembly job shop scheduling problem with lot streaming technique
    • Wong, T. C., F. T. S. Chan, and L. Y. Chan. 2009. "A Resource-constrained Assembly Job Shop Scheduling Problem with Lot Streaming Technique." Computers & Industrial Engineering 57: 983-995.
    • (2009) Computers & Industrial Engineering , vol.57 , pp. 983-995
    • Wong, T.C.1    Chan, F.T.S.2    Chan, L.Y.3
  • 25
    • 33748492325 scopus 로고    scopus 로고
    • Scheduling and lot sizing with sequence-dependent setup: A literature review
    • Zhu, X., and W. E. Wilhelm. 2006. "Scheduling and Lot Sizing with Sequence-dependent Setup: A Literature Review." IIE Transactions 38: 987-1007.
    • (2006) IIE Transactions , vol.38 , pp. 987-1007
    • Zhu, X.1    Wilhelm, W.E.2
  • 26
    • 79961086795 scopus 로고    scopus 로고
    • Optimal multiperiod scheduling of multiproduct batch plants under demand uncertainty
    • Zhu, J., X. Gu, and W. Gu. 2011. "Optimal Multiperiod Scheduling of Multiproduct Batch Plants under Demand Uncertainty." Kybernetes 40: 871-882.
    • (2011) Kybernetes , vol.40 , pp. 871-882
    • Zhu, J.1    Gu, X.2    Gu, W.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.