-
1
-
-
0022234268
-
Simultaneous lot sizing and sequencing for multistage production systems
-
Afentakis, P. 1985. "Simultaneous Lot Sizing and Sequencing for Multistage Production Systems." IIE Transactions 17: 327-331.
-
(1985)
IIE Transactions
, vol.17
, pp. 327-331
-
-
Afentakis, P.1
-
2
-
-
36849082395
-
A survey of scheduling problems with setup times or costs
-
Allahverdi, A., C. T. Ng, T. C. E. Cheng, and M. Y. Kovalyov. 2008. "A Survey of Scheduling Problems with Setup Times or Costs." European Journal of Operational Research 187: 985-1032.
-
(2008)
European Journal of Operational Research
, vol.187
, pp. 985-1032
-
-
Allahverdi, A.1
Ng, C.T.2
Cheng, T.C.E.3
Kovalyov, M.Y.4
-
6
-
-
0012712572
-
A capacity-oriented hierarchical approach to single-item and small-batch production planning using project-scheduling methods
-
Franck, B., K. Neumann, and C. Schwindt. 1997. "A Capacity-oriented Hierarchical Approach to Single-item and Small-batch Production Planning Using Project-scheduling Methods." OR Spektrum 19: 77-85.
-
(1997)
OR Spektrum
, vol.19
, pp. 77-85
-
-
Franck, B.1
Neumann, K.2
Schwindt, C.3
-
7
-
-
79952624870
-
An efficient memetic algorithm for solving the job shop scheduling problem
-
Gao, L., G. Zhang, L. Zhang, and X. Li. 2011. "An Efficient Memetic Algorithm for Solving the Job Shop Scheduling Problem." Computers & Industrial Engineering 60: 699-705.
-
(2011)
Computers & Industrial Engineering
, vol.60
, pp. 699-705
-
-
Gao, L.1
Zhang, G.2
Zhang, L.3
Li, X.4
-
8
-
-
0035384294
-
A common cycle approach to lot-scheduling in multistage manufacturing systems
-
Hennet, J. C. 2001. "A Common Cycle Approach to Lot-scheduling in Multistage Manufacturing Systems." Production Planning & Control 12: 362-371.
-
(2001)
Production Planning & Control
, vol.12
, pp. 362-371
-
-
Hennet, J.C.1
-
9
-
-
74449083168
-
Multi-objective Job-shop scheduling with Lot-splitting Production
-
Huang, R. H. 2010. "Multi-objective Job-shop scheduling with Lot-splitting Production." International Journal of Production Economics 124: 206-213.
-
(2010)
International Journal of Production Economics
, vol.124
, pp. 206-213
-
-
Huang, R.H.1
-
10
-
-
0032216046
-
Effective continuous-time formulation for short-term scheduling. 2. Continuous and semicontinuous processes
-
Ierapetritou, M. G., and C. A. Floudas. 1998. "Effective Continuous-time Formulation for Short-term Scheduling. 2. Continuous and Semicontinuous Processes." Industrial Engineering and Chemical Research 37: 4360-4374.
-
(1998)
Industrial Engineering and Chemical Research
, vol.37
, pp. 4360-4374
-
-
Ierapetritou, M.G.1
Floudas, C.A.2
-
12
-
-
0030244109
-
Simulated annealing and genetic algorithms for scheduling products with multi-level product structure
-
Kim, J. U., and Y. D. Kim. 1996. "Simulated Annealing and Genetic Algorithms for Scheduling Products with Multi-level Product Structure." Computers & Operations Research 23: 857-868.
-
(1996)
Computers & Operations Research
, vol.23
, pp. 857-868
-
-
Kim, J.U.1
Kim, Y.D.2
-
13
-
-
0027545176
-
A general algorithm for short-term scheduling of batch operations-I. Milp formulation
-
Kondili, E., C. C. Pantelides, and R. W. H. Sargent. 1993. "A General Algorithm for Short-term Scheduling of Batch Operations-I. MILP Formulation." Computers and Chemical Engineering 17: 211-227.
-
(1993)
Computers and Chemical Engineering
, vol.17
, pp. 211-227
-
-
Kondili, E.1
Pantelides, C.C.2
Sargent, R.W.H.3
-
14
-
-
84855278833
-
Memetic algorithms and memetic computing optimization: A literature review
-
Neri, F., and C. Cotta. 2012. "Memetic Algorithms and Memetic Computing Optimization: A Literature Review." Swarm and Evolutionary Computation 2: 1-14.
-
(2012)
Swarm and Evolutionary Computation
, vol.2
, pp. 1-14
-
-
Neri, F.1
Cotta, C.2
-
15
-
-
0036507655
-
Production planning for a project job shop, with application to disassembly, evaluation and maintenance of nuclear weapons
-
Nozick, L. K., M. A. Turnquist, C. R. Lawton, G. F. List, D. A. Jones, S. T. Wright, and E. A. Kjeldgaard. 2002. "Production Planning for a Project Job Shop, with Application to Disassembly, Evaluation and Maintenance of Nuclear Weapons." Production Planning & Control 13: 187-198.
-
(2002)
Production Planning & Control
, vol.13
, pp. 187-198
-
-
Nozick, L.K.1
Turnquist, M.A.2
Lawton, C.R.3
List, G.F.4
Jones, D.A.5
Wright, S.T.6
Kjeldgaard, E.A.7
-
16
-
-
0035546154
-
The finite horizon economic lot sizing problem in job shops: The multiple cycle approach
-
Ouenniche, J., and J. W. M. Bertrand. 2001. "The Finite Horizon Economic Lot Sizing Problem in Job Shops: the Multiple Cycle Approach." International Journal of Production Economics 74: 49-61.
-
(2001)
International Journal of Production Economics
, vol.74
, pp. 49-61
-
-
Ouenniche, J.1
Bertrand, J.W.M.2
-
17
-
-
72049116023
-
Capacitated lot sizing with linked lots for general product structures in job shops
-
Ozturk, C., and A. M. Orneck. 2010. "Capacitated Lot Sizing with Linked Lots for General Product Structures in Job Shops." Computers & Industrial Engineering 58: 151-164.
-
(2010)
Computers & Industrial Engineering
, vol.58
, pp. 151-164
-
-
Ozturk, C.1
Orneck, A.M.2
-
18
-
-
84868370277
-
Multi-product sequencing and lot-sizing under uncertainties: A memetic algorithm
-
Schemeleva, K., X. Delorme, A. Dolgui, and F. Grimaud. 2012. "Multi-product Sequencing and Lot-sizing under Uncertainties: A Memetic Algorithm." Engineering Applications of Artificial Intelligence 25: 1598-1610.
-
(2012)
Engineering Applications of Artificial Intelligence
, vol.25
, pp. 1598-1610
-
-
Schemeleva, K.1
Delorme, X.2
Dolgui, A.3
Grimaud, F.4
-
19
-
-
0001775820
-
Batch scheduling in process industries: An application of resource-constrained project scheduling
-
Schwindt, C., and N. Trautmann. 2000. "Batch Scheduling in Process Industries: an Application of Resource-constrained Project Scheduling." OR Spektrum 22: 501-524.
-
(2000)
OR Spektrum
, vol.22
, pp. 501-524
-
-
Schwindt, C.1
Trautmann, N.2
-
20
-
-
29344475492
-
Multilevel capacitated lot-sizing and resource-constrained project scheduling: An integrating perspective
-
Stadtler, H. 2005. "Multilevel Capacitated Lot-sizing and Resource-constrained Project Scheduling: An Integrating Perspective." International Journal of Production Research 43: 5253-5270.
-
(2005)
International Journal of Production Research
, vol.43
, pp. 5253-5270
-
-
Stadtler, H.1
-
23
-
-
37849188714
-
Hybrid flow shop scheduling as a multi-mode multi-project scheduling problem with batching requirements: A real-world application
-
Vob, S., and A. Witt. 2007. "Hybrid Flow Shop Scheduling as a Multi-mode Multi-project Scheduling Problem with Batching Requirements: A Real-world Application." International Journal of Production Economics 105: 445-458.
-
(2007)
International Journal of Production Economics
, vol.105
, pp. 445-458
-
-
Vob, S.1
Witt, A.2
-
24
-
-
69649103114
-
A resource-constrained assembly job shop scheduling problem with lot streaming technique
-
Wong, T. C., F. T. S. Chan, and L. Y. Chan. 2009. "A Resource-constrained Assembly Job Shop Scheduling Problem with Lot Streaming Technique." Computers & Industrial Engineering 57: 983-995.
-
(2009)
Computers & Industrial Engineering
, vol.57
, pp. 983-995
-
-
Wong, T.C.1
Chan, F.T.S.2
Chan, L.Y.3
-
25
-
-
33748492325
-
Scheduling and lot sizing with sequence-dependent setup: A literature review
-
Zhu, X., and W. E. Wilhelm. 2006. "Scheduling and Lot Sizing with Sequence-dependent Setup: A Literature Review." IIE Transactions 38: 987-1007.
-
(2006)
IIE Transactions
, vol.38
, pp. 987-1007
-
-
Zhu, X.1
Wilhelm, W.E.2
-
26
-
-
79961086795
-
Optimal multiperiod scheduling of multiproduct batch plants under demand uncertainty
-
Zhu, J., X. Gu, and W. Gu. 2011. "Optimal Multiperiod Scheduling of Multiproduct Batch Plants under Demand Uncertainty." Kybernetes 40: 871-882.
-
(2011)
Kybernetes
, vol.40
, pp. 871-882
-
-
Zhu, J.1
Gu, X.2
Gu, W.3
|