-
1
-
-
0023364439
-
The facility layout problem
-
A. Kusiak and S. S. Heragu, "The facility layout problem," Eur. J. Oper. Res., vol. 29, no. 3, pp. 229- 251, 1987.
-
(1987)
Eur. J. Oper. Res.
, vol.29
, Issue.3
, pp. 229-251
-
-
Kusiak, A.1
Heragu, S.S.2
-
3
-
-
0002384937
-
Assignment problems and the location of economic activities
-
T. C. Koopmans and M. Beckmann, "Assignment problems and the location of economic activities," Econ. J. Econ. Soc., pp. 53-76, 1957.
-
(1957)
Econ. J. Econ. Soc.
, pp. 53-76
-
-
Koopmans, T.C.1
Beckmann, M.2
-
4
-
-
36448983601
-
Facility layout problems: A survey
-
A. Drira, H. Pierreval, and S. Hajri-Gabouj, "Facility layout problems: A survey," Annu. Rev. Control, vol. 31, no. 2, pp. 255-267, 2007.
-
(2007)
Annu. Rev. Control
, vol.31
, Issue.2
, pp. 255-267
-
-
Drira, A.1
Pierreval, H.2
Hajri-Gabouj, S.3
-
7
-
-
0030869878
-
Minimizing work-inprocess and material handling in the facilities layout problem
-
M. C. Fu and B. K. Kaku, "Minimizing work-inprocess and material handling in the facilities layout problem," Iie Trans., vol. 29, no. 1, pp. 29-36, 1997.
-
(1997)
Iie Trans
, vol.29
, Issue.1
, pp. 29-36
-
-
Fu, M.C.1
Kaku, B.K.2
-
8
-
-
5144223230
-
Genetic algorithm for facilities layout problems based on slicing tree structure
-
E. Shayan and A. Chittilappilly, "Genetic algorithm for facilities layout problems based on slicing tree structure," Int. J. Prod. Res., vol. 42, no. 19, pp. 4055- 4067, 2004.
-
(2004)
Int. J. Prod. Res.
, vol.42
, Issue.19
, pp. 4055-4067
-
-
Shayan, E.1
Chittilappilly, A.2
-
9
-
-
33748564656
-
A review of different approaches to the facility layout problems
-
S. P. Singh and R. R. K. Sharma, "A review of different approaches to the facility layout problems," Int. J. Adv. Manuf. Technol., vol. 30, no. 5-6, pp. 425-433, 2006.
-
(2006)
Int. J. Adv. Manuf. Technol.
, vol.30
, Issue.5-6
, pp. 425-433
-
-
Singh, S.P.1
Sharma, R.R.K.2
-
11
-
-
84885648809
-
Machine layout problem in modern manufacturing facilities
-
M. M. D. Hassan, "Machine layout problem in modern manufacturing facilities," Int. J. Prod. Res., vol. 32, no. 11, pp. 2559-2584, 1994.
-
(1994)
Int. J. Prod. Res.
, vol.32
, Issue.11
, pp. 2559-2584
-
-
Hassan, M.M.D.1
-
12
-
-
33749834100
-
The facility layout problem: Recent and emerging trends and perspectives
-
R. D. Meller and K.-Y. Gau, "The facility layout problem: Recent and emerging trends and perspectives," J. Manuf. Syst., vol. 15, no. 5, pp. 351- 366, 1996.
-
(1996)
J. Manuf. Syst.
, vol.15
, Issue.5
, pp. 351-366
-
-
Meller, R.D.1
Gau, K.-Y.2
-
13
-
-
38249036528
-
A review of graph theory application to the facilities layout problem
-
M. M. Hassan and G. L. Hogg, "A review of graph theory application to the facilities layout problem," Omega, vol. 15, no. 4, pp. 291-300, 1987.
-
(1987)
Omega
, vol.15
, Issue.4
, pp. 291-300
-
-
Hassan, M.M.1
Hogg, G.L.2
-
14
-
-
0033101918
-
Development and validation of genetic algorithm-based facility layout a case study in the pharmaceutical industry
-
S. Hamamoto, "Development and validation of genetic algorithm-based facility layout a case study in the pharmaceutical industry," Int. J. Prod. Res., vol. 37, no. 4, pp. 749-768, 1999.
-
(1999)
Int. J. Prod. Res.
, vol.37
, Issue.4
, pp. 749-768
-
-
Hamamoto, S.1
-
16
-
-
84885223925
-
Application of lean scheduling and production control in non-repetitive manufacturing systems using intelligent agent decision support
-
T. C. Papadopoulou, "Application of lean scheduling and production control in non-repetitive manufacturing systems using intelligent agent decision support," 2013.
-
(2013)
-
-
Papadopoulou, T.C.1
-
19
-
-
0034780059
-
A simulation analysis of factors influencing the flow time and through-put performance of functional and cellular layouts
-
Jul
-
F. Huq, D. A. Hensler, and Z. M. Mohamed, "A simulation analysis of factors influencing the flow time and through-put performance of functional and cellular layouts," Integr. Manuf. Syst., vol. 12, no. 4, pp. 285-295, Jul. 2001.
-
(2001)
Integr. Manuf. Syst.
, vol.12
, Issue.4
, pp. 285-295
-
-
Huq, F.1
Hensler, D.A.2
Mohamed, Z.M.3
-
20
-
-
0000839571
-
Layout design in group technology manufacturing
-
M. Hassan, "Layout design in group technology manufacturing," Int. J. Prod. Econ., vol. 38, no. 2, pp. 173-188, 1995.
-
(1995)
Int. J. Prod. Econ.
, vol.38
, Issue.2
, pp. 173-188
-
-
Hassan, M.1
-
21
-
-
84885228069
-
"Merchandise and replenishment planning optimization for fashion retail,"
-
vol. in press
-
R. Iannone, A. Ingenito, G. Martino, S. Miranda, S. Pepe, and S. Riemma, "Merchandise and replenishment planning optimization for fashion retail," Int. J. Eng. Bus. Manag., vol. in press, 2013.
-
(2013)
Int. J. Eng. Bus. Manag.
-
-
Iannone, R.1
Ingenito, A.2
Martino, G.3
Miranda, S.4
Pepe, S.5
Riemma, S.6
-
22
-
-
84885826446
-
"The Logistic Maturity Model: Application to a Fashion Company,"
-
vol. in press
-
M. M. Schiraldi and C. Battista, "The Logistic Maturity Model: Application to a Fashion Company," Int. J. Eng. Bus. Manag., vol. in press, 2013.
-
(2013)
Int. J. Eng. Bus. Manag.
-
-
Schiraldi, M.M.1
Battista, C.2
-
23
-
-
84885221758
-
"Key success factors for organizational innovation in the fashion industry,"
-
vol. in press
-
F. De Felice, A. Petrillo, and C. Autorino, "Key success factors for organizational innovation in the fashion industry," Int. J. Eng. Bus. Manag., vol. in press, 2013.
-
(2013)
Int. J. Eng. Bus. Manag.
-
-
De Felice, F.1
Petrillo, A.2
Autorino, C.3
-
24
-
-
85007396443
-
"Bucket brigades to increase productivity in a luxury assembly line,"
-
vol. in press
-
F. De Carlo, M. Tucci, and O. Borgia, "Bucket brigades to increase productivity in a luxury assembly line," Int. J. Eng. Bus. Manag., vol. in press, 2013.
-
(2013)
Int. J. Eng. Bus. Manag.
-
-
De Carlo, F.1
Tucci, M.2
Borgia, O.3
-
25
-
-
84885212741
-
"Prominent determinants of consumer based brand equity,"
-
vol. in press
-
E. Battistoni, A. Fronzetti Colladon, and G. Mercorelli, "Prominent determinants of consumer based brand equity," Int. J. Eng. Bus. Manag., vol. in press, 2013.
-
(2013)
Int. J. Eng. Bus. Manag.
-
-
Battistoni, E.1
Colladon, A.F.2
Mercorelli, G.3
-
26
-
-
84885207575
-
"Fourier analysis for demand forecasting in fashion company,"
-
vol. in press
-
A. Fumi, A. Pepe, L. Scarabotti, and M. M. Schiraldi, "Fourier analysis for demand forecasting in fashion company," Int. J. Eng. Bus. Manag., vol. in press, 2013.
-
(2013)
Int. J. Eng. Bus. Manag.
-
-
Fumi, A.1
Pepe, A.2
Scarabotti, L.3
Schiraldi, M.M.4
-
27
-
-
84885198824
-
"Demand forecasting in the fashion industry: a review,"
-
vol. in press
-
M. E. Nenni, L. Giustiniano, and L. Pirolo, "Demand forecasting in the fashion industry: a review," Int. J. Eng. Bus. Manag., vol. in press, 2013.
-
(2013)
Int. J. Eng. Bus. Manag.
-
-
Nenni, M.E.1
Giustiniano, L.2
Pirolo, L.3
-
28
-
-
84885198790
-
CORELAP-Computerized REIationship L Ay out Planning
-
R. C. Lee, "CORELAP-Computerized REIationship L Ay out Planning," in Conference and convention proceedings, 1967, p. 274.
-
(1967)
Conference and convention proceedings
, pp. 274
-
-
Lee, R.C.1
-
29
-
-
84885202329
-
Reliability and Maintainability in Operations Management,"
-
Rijeka Croatia: Intech
-
F. De Carlo, "Reliability and Maintainability in Operations Management," in Operations Management, 1 vols., Rijeka, Croatia: Intech, 2013, p. 32.
-
(2013)
Operations Management
, vol.1
, pp. 32
-
-
De Carlo, F.1
-
30
-
-
84856273410
-
Risk-based inspections enhanced with Bayesian networks
-
F. De Carlo, O. Borgia, and M. Tucci, "Risk-based inspections enhanced with Bayesian networks," Proc. Inst. Mech. Eng. Part O J. Risk Reliab., vol. 225, no. 3, pp. 375-386, 2011.
-
(2011)
Proc. Inst. Mech. Eng. Part O J. Risk Reliab.
, vol.225
, Issue.3
, pp. 375-386
-
-
De Carlo, F.1
Borgia, O.2
Tucci, M.3
-
31
-
-
84885212846
-
Accelerated degradation tests for reliability estimation of a new product: a case study for washing machines.,"
-
in press
-
F. De Carlo, O. Borgia, and M. Tucci, "Accelerated degradation tests for reliability estimation of a new product: a case study for washing machines.," Proc. Inst. Mech. Eng. Part O J. Risk Reliab., in press.
-
Proc. Inst. Mech. Eng. Part O J. Risk Reliab.
-
-
De Carlo, F.1
Borgia, O.2
Tucci, M.3
-
32
-
-
0004132720
-
"Systematic layout planning,"
-
R. Muther and A. H. Mogensen, "Systematic layout planning," 1973.
-
(1973)
-
-
Muther, R.1
Mogensen, A.H.2
-
33
-
-
0003463029
-
The Machine That Changed the World: The Story of Lean Production-Toyota's Secret Weapon in the Global Car Wars That Is Now Revolutionizing World Industry
-
Simon and Schuster
-
J. P. Womack, D. T. Jones, and D. Roos, The Machine That Changed the World: The Story of Lean Production-Toyota's Secret Weapon in the Global Car Wars That Is Now Revolutionizing World Industry. Simon and Schuster, 2007.
-
(2007)
-
-
Womack, J.P.1
Jones, D.T.2
Roos, D.3
-
36
-
-
3543108498
-
The seven value stream mapping tools"
-
P. Hines and N. Rich, "The seven value stream mapping tools," Int. J. Oper. Prod. Manag., vol. 17, no. 1, pp. 46-64, 1997.
-
(1997)
Int. J. Oper. Prod. Manag.
, vol.17
, Issue.1
, pp. 46-64
-
-
Hines, P.1
Rich, N.2
-
38
-
-
82455205800
-
Design and implementation of Lean Facility Layout System of a Production Line
-
X. Lu, Z. Jia, J. Yang, and H. Liu, "Design and implementation of Lean Facility Layout System of a Production Line," Int. J. Ind. Eng. Theory Appl. Pr., vol. 18, no. 5, 2011.
-
(2011)
Int. J. Ind. Eng. Theory Appl. Pr.
, vol.18
, Issue.5
-
-
Lu, X.1
Jia, Z.2
Yang, J.3
Liu, H.4
-
39
-
-
0003931681
-
Learning to See: Value-Stream Mapping to Create Value and Eliminate Muda: Version 1
-
3 June 2003. Lean Enterprise Institute
-
M. Rother and J. Shook, Learning to See: Value-Stream Mapping to Create Value and Eliminate Muda: Version 1.3 June 2003. Lean Enterprise Institute, 2003.
-
(2003)
-
-
Rother, M.1
Shook, J.2
|