-
1
-
-
61349094800
-
An exact approach to the one-dimensional facility layout problem
-
Amaral, André R. S. (2008).An exact approach to the one-dimensional facility layout problem. Operations Research, v 56, n 4, p 1026-1033.
-
(2008)
Operations Research
, vol.56
, Issue.4
, pp. 1026-1033
-
-
Amaral André, R.S.1
-
2
-
-
57049126568
-
Solving facility layout problems with strict geometric constraints using a two-phase genetic algorithm
-
Diego-Mas, J.A.; Santamarina-Siurana, M.C.; Alcaide-Marzal, J.; Cloquell-Ballester, V.A. (2009). Solving facility layout problems with strict geometric constraints using a two-phase genetic algorithm. International Journal of Production Research, v 47, n 6, p 1679-1693.
-
(2009)
International Journal of Production Research
, vol.47
, Issue.6
, pp. 1679-1693
-
-
Diego-Mas, J.A.1
Santamarina-Siurana, M.C.2
Alcaide-Marzal, J.3
Cloquell-Ballester, V.A.4
-
3
-
-
36248959667
-
Facility layout problem: An approach based on a group decision-making system and psychoclonal algorithm
-
DOI 10.1080/00207540600943993, PII 786449041
-
Khilwani, N.; Shankar, R.; Tiwari, M.K. (2008).Facility layout problem: An approach based on a group decision-making system and psychoclonal algorithm. International Journal of Production Research, v 46, n 4, p 895-927. (Pubitemid 350136924)
-
(2008)
International Journal of Production Research
, vol.46
, Issue.4
, pp. 895-927
-
-
Khilwani, N.1
Shankar, R.2
Tiwari, M.K.3
-
4
-
-
33749465070
-
Computerized production layout of deterministic demand through resource utilization
-
Lan, Chun-Hsiung; Lan, Kuo-Torng. (2005). Computerized production layout of deterministic demand through resource utilization. International Journal of Industrial Engineering: Theory Applications and Practice, v 12, n 3, p 256-265.
-
(2005)
International Journal of Industrial Engineering: Theory Applications and Practice
, vol.12
, Issue.3
, pp. 256-265
-
-
Chun-Hsiung, L.1
Kuo-Torng, L.2
-
5
-
-
34047209879
-
The research on lean rework and balancing of the cylinder liner production line
-
JIA, Zhenyuan; LU, Xiaohong; LIU, Dixin. (2006). The research on lean rework and balancing of the cylinder liner production line. Proceedings of the World Congress on Intelligent Control and Automation (WCICA), v 2, p 6680-6684
-
(2006)
Proceedings of the World Congress on Intelligent Control and Automation (WCICA)
, vol.2
, pp. 6680-6684
-
-
Zhenyuan, J.1
Xiaohong, L.2
Dixin, L.3
-
7
-
-
56149124634
-
Towards measuring the effectiveness of a facilities layout
-
Raman, Dhamodharan; Nagalingam, Sev V.; Lin, Grier C.I. (2009). Towards measuring the effectiveness of a facilities layout. Robotics and Computer-Integrated Manufacturing, v 25, n 1, p 191-203.
-
(2009)
Robotics and Computer-Integrated Manufacturing
, vol.25
, Issue.1
, pp. 191-203
-
-
Dhamodharan, R.1
Nagalingam, S.V.2
Lin Grier, C.I.3
-
9
-
-
63049092796
-
A simulated annealing algorithm to find approximate Pareto optimal solutions for the multi-objective facility layout problem
-
Sahin, Ramazan; Türkbey, Orhan. (2009). A simulated annealing algorithm to find approximate Pareto optimal solutions for the multi-objective facility layout problem. International Journal of Advanced Manufacturing Technology, v 41, n 9-10, p 1003-1018.
-
(2009)
International Journal of Advanced Manufacturing Technology
, vol.41
, Issue.9-10
, pp. 1003-1018
-
-
Ramazan, S.1
Orhan, T.2
-
10
-
-
82455189474
-
Study on facility layout and simulation technology of production line
-
(in Chinese)
-
WANG Fuji, JIA Zhenyuan, WANG Linping, LIU Wei, LU Xiaohong. (2007). Study on facility layout and simulation technology of production line. Modular Machine Tool & Automatic Manufacturing Technique, 9, 96-99.(in Chinese)
-
(2007)
Modular Machine Tool & Automatic Manufacturing Technique
, vol.9
, pp. 96-99
-
-
Fuji, W.1
Zhenyuan, J.2
Linping, W.3
Wei, L.4
Xiaohong, L.5
-
11
-
-
59649108226
-
Facility placement with sub-aisle design in an existing layout
-
Zhang, Min; Savas, Selçuk; Batta, Rajan; Nagi, Rakesh.(2009).Facility placement with sub-aisle design in an existing layout. European Journal of Operational Research, v 197, n 1, p 154-165.
-
(2009)
European Journal of Operational Research
, vol.197
, Issue.1
, pp. 154-165
-
-
Zhang, M.1
Savas, S.2
Batta, R.3
Nagi, R.4
|