-
1
-
-
70349760533
-
-
managers, designers, engineers and contractors Wiley
-
Eastman, C., Teicholz, P., Sacks, R., Liston, K.: BIM handbook: A guide to building information modeling for owners, managers, designers, engineers and contractors. Wiley (2011)
-
(2011)
BIM Handbook: A Guide to Building Information Modeling for Owners
-
-
Eastman, C.1
Teicholz, P.2
Sacks, R.3
Liston, K.4
-
3
-
-
62549091452
-
Paradigm trajectories of building information modeling practice in project networks
-
Taylor, J.E., Bernstein, P.G.: Paradigm trajectories of building information modeling practice in project networks. Journal of Management in Engineering 25(2), 69-76 (2009)
-
(2009)
Journal of Management in Engineering
, vol.25
, Issue.2
, pp. 69-76
-
-
Taylor, J.E.1
Bernstein, P.G.2
-
4
-
-
79551688323
-
Building information modelling (bim) framework for practical implementation
-
Jung, Y., Joo, M.: Building information modelling (BIM) framework for practical implementation. Automation in Construction 20(2), 126-133 (2011)
-
(2011)
Automation in Construction
, vol.20
, Issue.2
, pp. 126-133
-
-
Jung, Y.1
Joo, M.2
-
5
-
-
34247643800
-
Dimensional reduction of 3d building models using graph theory and its application in building energy simulation
-
van Treeck, C., Rank, E.: Dimensional reduction of 3D building models using graph theory and its application in building energy simulation. Engineering with Computers 23(2), 109-122 (2007)
-
(2007)
Engineering with Computers
, vol.23
, Issue.2
, pp. 109-122
-
-
Van Treeck, C.1
Rank, E.2
-
6
-
-
57749169961
-
Building information model based energy/exergy performance assessment in early design stages
-
Schlueter, A., Thesseling, F.: Building information model based energy/exergy performance assessment in early design stages. Automation in Construction 18(2), 153-163 (2009)
-
(2009)
Automation in Construction
, vol.18
, Issue.2
, pp. 153-163
-
-
Schlueter, A.1
Thesseling, F.2
-
7
-
-
57649149304
-
Visualizing high-rise building construction strategies using linear scheduling and 4d cad
-
Russell, A., Staub-French, S., Tran, N., Wong, W.: Visualizing high-rise building construction strategies using linear scheduling and 4D CAD. Automation in Construction 18(2), 219-236 (2009)
-
(2009)
Automation in Construction
, vol.18
, Issue.2
, pp. 219-236
-
-
Russell, A.1
Staub-French, S.2
Tran, N.3
Wong, W.4
-
8
-
-
77949484698
-
Using the md cad model to develop the time-cost integrated schedule for construction projects
-
Feng, C.W., Chen, Y.J., Huang, J.R.: Using the MD CAD model to develop the time-cost integrated schedule for construction projects. Automation in Construction 19(3), 347-356 (2010)
-
(2010)
Automation in Construction
, vol.19
, Issue.3
, pp. 347-356
-
-
Feng, C.W.1
Chen, Y.J.2
Huang, J.R.3
-
9
-
-
84864203735
-
BIM+, A.R onsite information sharing and communication via advanced visualization
-
Wang, X., Love, P.: BIM+, A.R Onsite information sharing and communication via advanced visualization. In: Computer Supported Cooperative Work in Design (CSCWD), pp. 850-855 (2012)
-
(2012)
Computer Supported Cooperative Work in Design (CSCWD)
, pp. 850-855
-
-
Wang, X.1
Love, P.2
-
14
-
-
77957836985
-
Augmented reality in architecture and design: Potentials and challenges for application
-
Wang, X.: Augmented reality in architecture and design: potentials and challenges for application. International Journal of Architectural Computing 7(2), 309-326 (2009)
-
(2009)
International Journal of Architectural Computing
, vol.7
, Issue.2
, pp. 309-326
-
-
Wang, X.1
-
15
-
-
77955710066
-
Integrating resource production and construction using BIM
-
Babi?, N.?., Podbreznik, P., Rebolj, D.: Integrating resource production and construction using BIM. Automation in Construction 19(5), 539-543 (2010)
-
(2010)
Automation in Construction
, vol.19
, Issue.5
, pp. 539-543
-
-
Babi, N.1
Podbreznik, P.2
Rebolj, D.3
|