메뉴 건너뛰기




Volumn , Issue , 2009, Pages 41-50

Interactive visual construction progress monitoring with D4A - 4D augmented reality- Models

Author keywords

[No Author keywords available]

Indexed keywords

AR MODELS; CONSTRUCTION PROJECT MANAGERS; CONSTRUCTION PROJECTS; DATA COLLECTION; PERFORMANCE MODEL; SPATIAL ASPECT;

EID: 69949104466     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1061/41020(339)5     Document Type: Conference Paper
Times cited : (38)

References (27)
  • 2
    • 0032201716 scopus 로고    scopus 로고
    • An optimal algorithm for approximate nearest neighbor searching fixed dimensions
    • Arya, S., Mount, D., Netanyahu, N., Silverman, R., and Wu, A. (1998). "An optimal algorithm for approximate nearest neighbor searching fixed dimensions" J. of the ACM 45 (6), 891-923.
    • (1998) J. of the ACM , vol.45 , Issue.6 , pp. 891-923
    • Arya, S.1    Mount, D.2    Netanyahu, N.3    Silverman, R.4    Wu, A.5
  • 3
    • 39449105508 scopus 로고    scopus 로고
    • General purpose modular hardware and software framework for mobile outdoor augmented reality applications in engineering
    • Behzadan, A., Timm, B., and Kamat, V. (2008). "General purpose modular hardware and software framework for mobile outdoor augmented reality applications in engineering" Advanced Eng Informatics 22, 90-105.
    • (2008) Advanced Eng Informatics , vol.22 , pp. 90-105
    • Behzadan, A.1    Timm, B.2    Kamat, V.3
  • 4
  • 5
    • 0002604591 scopus 로고
    • Four-Dimensional modeling in design and construction
    • Stanford University, Stanford, CA
    • Collier, E. and Fischer, M. (1995). "Four-Dimensional modeling in design and construction", CIFE Technical Report No. 101. Stanford University, Stanford, CA, 411-423.
    • (1995) CIFE Technical Report No.101 , pp. 411-423
    • Collier, E.1    Fischer, M.2
  • 6
    • 49349100565 scopus 로고    scopus 로고
    • Integrating 3D laser scanning and photogrammetry for progress measurement of construction work
    • El-Omari, S. and Moselhi, O. (2008). "Integrating 3D laser scanning and photogrammetry for progress measurement of construction work" J. of Automation in Constr., 18 (1), 1-9.
    • (2008) J. of Automation in Constr. , vol.18 , Issue.1 , pp. 1-9
    • El-Omari, S.1    Moselhi, O.2
  • 7
    • 69949096793 scopus 로고    scopus 로고
    • Visualization of construction progress monitoring with 4D simulation model overlaid on time-lapsed photographs
    • Special Ed. on Graphical 3D Visualization in AEC, in press
    • Golparvar-Fard, M., Peña-Mora, F., Arboleda, C. and Lee, S. (2008). "Visualization of construction progress monitoring with 4D simulation model overlaid on time-lapsed photographs" ASCE J. of Computing in Civil Eng., Special Ed. on Graphical 3D Visualization in AEC, in press.
    • (2008) ASCE J. of Computing in Civil Eng.
    • Golparvar-Fard, M.1    Peña-Mora, F.2    Arboleda, C.3    Lee, S.4
  • 8
    • 84877626945 scopus 로고    scopus 로고
    • Visual representation of construction progress monitoring metrics on time-lapse photographs
    • Univ. of Reading, UK.
    • Golparvar Fard, M., Sridharan, A., Lee, S., and Peña-Mora, F. (2007). "Visual Representation of Construction Progress Monitoring Metrics on Time-Lapse Photographs" Const. Mgmt and Econ. 25th Anniv. Conf., Univ. of Reading, UK.
    • (2007) Const. Mgmt and Econ. 25th Anniv. Conf.
    • Fard, M.G.1    Sridharan, A.2    Lee, S.3    Peña-Mora, F.4
  • 11
    • 41549118465 scopus 로고    scopus 로고
    • Software mechanisms for extensible and scalable 3D visualization of construction operations
    • Kamat, V., and Martinez, J. (2008). "Software mechanisms for extensible and scalable 3d visualization of construction operations", Adv. in Eng. Software, 39 (8), 659-675.
    • (2008) Adv. in Eng. Software , vol.39 , Issue.8 , pp. 659-675
    • Kamat, V.1    Martinez, J.2
  • 13
    • 3042535216 scopus 로고    scopus 로고
    • Distinctive image features from scale-invariant keypoints
    • Lowe, D. (2004). "Distinctive image features from scale-invariant keypoints". Int. J. of Computer Vision 60(2), 91-110.
    • (2004) Int. J. of Computer Vision , vol.60 , Issue.2 , pp. 91-110
    • Lowe, D.1
  • 15
    • 33244468369 scopus 로고    scopus 로고
    • A comparison of affine region detectors
    • Mikolajczyk, K., et al. (2005). "A comparison of affine region detectors". Int. J. of Computer Vision 65 (1/2), 43-72.
    • (2005) Int. J. of Computer Vision , vol.65 , Issue.1-2 , pp. 43-72
    • Mikolajczyk, K.1
  • 16
    • 33847222202 scopus 로고    scopus 로고
    • Assessing research issues in Automated Project Performance Control (APPC)
    • DOI 10.1016/j.autcon.2006.08.001, PII S0926580506000768
    • Navon, R. and Sacks, R. (2007). "Assessing research in automated project performance control (APPC)", J. of Automation in Construction, 16(4), 474-484. (Pubitemid 46304214)
    • (2007) Automation in Construction , vol.16 , Issue.4 , pp. 474-484
    • Navon, R.1    Sacks, R.2
  • 18
    • 33747360709 scopus 로고    scopus 로고
    • Construction scheduling and progress control using geographical information systems
    • Poku, S. and Arditi, D. (2006). "Construction scheduling and progress control using geographical information systems" J. of Computing in Civil Engrg, 20 (5), 351-360.
    • (2006) J. of Computing in Civil Engrg , vol.20 , Issue.5 , pp. 351-360
    • Poku, S.1    Arditi, D.2
  • 20
    • 33749256220 scopus 로고    scopus 로고
    • Building architectural models from many views using map constraints
    • Robertson, D., and Cipolla, R. (2002). "Building architectural models from many views using map constraints". Proc., European Conf. on Computer Vision, 2, 155-169.
    • (2002) Proc., European Conf. on Computer Vision , vol.2 , pp. 155-169
    • Robertson, D.1    Cipolla, R.2
  • 25
  • 26
    • 69949085233 scopus 로고    scopus 로고
    • Heavy equipment operator training via virtual modeling technologies
    • San Diego, CA
    • Wang, X., and Dunston, P. (2005). "Heavy equipment operator training via virtual modeling technologies" Proc., Construction Research Congress 2005, San Diego, CA, 618-622.
    • (2005) Proc., Construction Research Congress 2005 , pp. 618-622
    • Wang, X.1    Dunston, P.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.