Volumn 27, Issue 1, 2009, Pages 39-50

Quantifying schedule risk in construction projects using Bayesian belief networks

Author keywords

Bayesian belief networks; Construction projects; Delays; Risk management; Scheduling; Vietnam

Indexed keywords

CONSTRUCTION INDUSTRY; CONTRACTORS; CONTRACTS; DECISION THEORY; DEVELOPING COUNTRIES; LOSSES; NETWORK MANAGEMENT; PROJECT MANAGEMENT; RISK ANALYSIS; RISK MANAGEMENT; SCHEDULING; SURVEYS;

EID: 56749181092     PISSN: 02637863     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijproman.2008.03.003     Document Type: Article
Times cited : (210)

References (77)
  • 2
    • 56749132566 scopus 로고    scopus 로고
    • Construction Industry Institute (CII). Management of project risks and uncertainties, Publication 6-8, Cost/schedule control task force, University of Texas; 1989. .
    • Construction Industry Institute (CII). Management of project risks and uncertainties, Publication 6-8, Cost/schedule control task force, University of Texas; 1989. .
  • 3
    • 56749186333 scopus 로고    scopus 로고
    • .
    • .
  • 6
    • 84927635730 scopus 로고
    • Causes of delay in large building construction projects
    • Assaf S.A., Al-Khalil M., and Al-Hazmi M. Causes of delay in large building construction projects. J Manage Eng March/April (1995) 45-50
    • (1995) J Manage Eng , Issue.March-April , pp. 45-50
    • Assaf, S.A.1    Al-Khalil, M.2    Al-Hazmi, M.3
  • 7
    • 84948516864 scopus 로고
    • A study of the factors affecting construction durations in Hong Kong
    • Chan D.W.M., and Kumaraswary M.M. A study of the factors affecting construction durations in Hong Kong. Construct Manage Econom 13 (1995) 319-333
    • (1995) Construct Manage Econom , vol.13 , pp. 319-333
    • Chan, D.W.M.1    Kumaraswary, M.M.2
  • 8
    • 0030074893 scopus 로고    scopus 로고
    • Construction delays in a fast-growing economy: comparing Thailand with other economies
    • Ogunlana S.O., Promkuntong K., and Jearkjirm V. Construction delays in a fast-growing economy: comparing Thailand with other economies. Int J Project Manage 14 1 (1996) 37-45
    • (1996) Int J Project Manage , vol.14 , Issue.1 , pp. 37-45
    • Ogunlana, S.O.1    Promkuntong, K.2    Jearkjirm, V.3
  • 9
    • 0031078243 scopus 로고    scopus 로고
    • A comparative study of causes of time overruns in Hong Kong construction projects
    • Chan D.W.M., and Kumaraswary M.M. A comparative study of causes of time overruns in Hong Kong construction projects. Int J Project Manage 15 1 (1997) 53-63
    • (1997) Int J Project Manage , vol.15 , Issue.1 , pp. 53-63
    • Chan, D.W.M.1    Kumaraswary, M.M.2
  • 10
    • 84992947986 scopus 로고    scopus 로고
    • Evaluation of factors affecting time and cost performance in Hong Kong building projects
    • Dissanayaka S.M., and Kumaraswamy M.M. Evaluation of factors affecting time and cost performance in Hong Kong building projects. Eng Construct Architec Manage 6 3 (1999) 287-298
    • (1999) Eng Construct Architec Manage , vol.6 , Issue.3 , pp. 287-298
    • Dissanayaka, S.M.1    Kumaraswamy, M.M.2
  • 11
    • 0033883312 scopus 로고    scopus 로고
    • Construction delay: a quantitative analysis
    • Al-Moumani H.A. Construction delay: a quantitative analysis. Int J Project Manage 18 1 (2000) 51-59
    • (2000) Int J Project Manage , vol.18 , Issue.1 , pp. 51-59
    • Al-Moumani, H.A.1
  • 12
    • 0036132474 scopus 로고    scopus 로고
    • Causes of construction delay: traditional contracts
    • Odeh A.M., and Battaineh H.T. Causes of construction delay: traditional contracts. Int J Project Manage 20 1 (2002) 67-73
    • (2002) Int J Project Manage , vol.20 , Issue.1 , pp. 67-73
    • Odeh, A.M.1    Battaineh, H.T.2
  • 13
    • 0036836295 scopus 로고    scopus 로고
    • The effects of construction delays on project delivery in Nigerian construction industry
    • Aibinu A.A., and Jagboro G.O. The effects of construction delays on project delivery in Nigerian construction industry. Int J Project Manage 20 8 (2002) 593-599
    • (2002) Int J Project Manage , vol.20 , Issue.8 , pp. 593-599
    • Aibinu, A.A.1    Jagboro, G.O.2
  • 14
    • 0036834347 scopus 로고    scopus 로고
    • Material and equipment procurement delays in highway projects in Nepal
    • Manavazhi M.R., and Adhikari D.K. Material and equipment procurement delays in highway projects in Nepal. Int J Project Manage 20 8 (2002) 627-632
    • (2002) Int J Project Manage , vol.20 , Issue.8 , pp. 627-632
    • Manavazhi, M.R.1    Adhikari, D.K.2
  • 15
    • 13944275955 scopus 로고    scopus 로고
    • Evaluating risk in construction-schedule model (ERIC-S): construction schedule risk model
    • Nasir D., McCabe B., and Hartono L. Evaluating risk in construction-schedule model (ERIC-S): construction schedule risk model. J Construct Eng Manage ASCE 129 5 (2003) 518-527
    • (2003) J Construct Eng Manage ASCE , vol.129 , Issue.5 , pp. 518-527
    • Nasir, D.1    McCabe, B.2    Hartono, L.3
  • 16
    • 0038721064 scopus 로고    scopus 로고
    • Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study
    • Frimpong Y., Oluwoye J., and Crawford L. Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study. Int J Project Manage 21 5 (2003) 321-326
    • (2003) Int J Project Manage , vol.21 , Issue.5 , pp. 321-326
    • Frimpong, Y.1    Oluwoye, J.2    Crawford, L.3
  • 17
    • 16444365584 scopus 로고    scopus 로고
    • Delays and cost increases in the construction of private residential projects in Kuwait
    • Koushki P.A., Al-Rashid K., and Kartam N. Delays and cost increases in the construction of private residential projects in Kuwait. Construct Manage Econom 23 3 (2005) 285-294
    • (2005) Construct Manage Econom , vol.23 , Issue.3 , pp. 285-294
    • Koushki, P.A.1    Al-Rashid, K.2    Kartam, N.3
  • 18
    • 33645965860 scopus 로고    scopus 로고
    • Causes of delay in large construction projects
    • Assaf S.A., and Al-Hejji S. Causes of delay in large construction projects. Int J Project Manage 24 4 (2006) 349-357
    • (2006) Int J Project Manage , vol.24 , Issue.4 , pp. 349-357
    • Assaf, S.A.1    Al-Hejji, S.2
  • 19
    • 33751295266 scopus 로고    scopus 로고
    • Significant factors causing delay in the UAE construction industry
    • Faridi A.S., and El-Sayegh S.M. Significant factors causing delay in the UAE construction industry. Construct Manage Econom 24 11 (2006) 1167-1176
    • (2006) Construct Manage Econom , vol.24 , Issue.11 , pp. 1167-1176
    • Faridi, A.S.1    El-Sayegh, S.M.2
  • 20
    • 33845750210 scopus 로고    scopus 로고
    • Construction duration of residential building projects in Germany
    • Stoy C., Dreier F., and Schalcher H.-R. Construction duration of residential building projects in Germany. Eng Construct Architec Manage 14 1 (2007) 52-64
    • (2007) Eng Construct Architec Manage , vol.14 , Issue.1 , pp. 52-64
    • Stoy, C.1    Dreier, F.2    Schalcher, H.-R.3
  • 21
    • 0032050006 scopus 로고    scopus 로고
    • Belief networks for construction performance diagnostics
    • McCabe B., AbouRizk S.M., and Goebel R. Belief networks for construction performance diagnostics. J Comput Civil Eng ASCE 12 2 (1998) 93-100
    • (1998) J Comput Civil Eng ASCE , vol.12 , Issue.2 , pp. 93-100
    • McCabe, B.1    AbouRizk, S.M.2    Goebel, R.3
  • 22
    • 0035312268 scopus 로고    scopus 로고
    • Diagnosing upsets in anaerobic wastewater treatment using Bayesian belief networks
    • Sahely B.S.G.E., and Bagley D.M. Diagnosing upsets in anaerobic wastewater treatment using Bayesian belief networks. J Environ Eng ASCE 127 4 (2001) 302-310
    • (2001) J Environ Eng ASCE , vol.127 , Issue.4 , pp. 302-310
    • Sahely, B.S.G.E.1    Bagley, D.M.2
  • 23
    • 13944267542 scopus 로고    scopus 로고
    • Bridge falsework productivity-measurement and influences
    • Tischer T.E., and Kuprenas J. Bridge falsework productivity-measurement and influences. J Construct Eng Manage ASCE 129 3 (2003) 243-250
    • (2003) J Construct Eng Manage ASCE , vol.129 , Issue.3 , pp. 243-250
    • Tischer, T.E.1    Kuprenas, J.2
  • 24
    • 0036024932 scopus 로고    scopus 로고
    • Probabilistic analysis of factors affecting highway construction costs: a belief network approach
    • Attoh-Okine N.O. Probabilistic analysis of factors affecting highway construction costs: a belief network approach. Can J Civil Eng 29 3 (2002) 369-374
    • (2002) Can J Civil Eng , vol.29 , Issue.3 , pp. 369-374
    • Attoh-Okine, N.O.1
  • 25
    • 32844468789 scopus 로고    scopus 로고
    • Expert elicitation and Bayesian analysis of construction contract risks: an investigation
    • Adams F. Expert elicitation and Bayesian analysis of construction contract risks: an investigation. Construct Manage Econom 24 1 (2006) 81-96
    • (2006) Construct Manage Econom , vol.24 , Issue.1 , pp. 81-96
    • Adams, F.1
  • 26
    • 1642440688 scopus 로고    scopus 로고
    • Safety climate in construction site environments
    • Mohamed S. Safety climate in construction site environments. J Construct Eng Manage ASCE 128 5 (2002) 375-384
    • (2002) J Construct Eng Manage ASCE , vol.128 , Issue.5 , pp. 375-384
    • Mohamed, S.1
  • 27
    • 56749101968 scopus 로고    scopus 로고
    • Cao SK. East Asian economic integration: problems for late-entry countries. .
    • Cao SK. East Asian economic integration: problems for late-entry countries. .
  • 28
    • 56749157187 scopus 로고    scopus 로고
    • World Bank. East Asia update, managing through a global downturn, East Asia and Pacific region: The World Bank; November 2006. .
    • World Bank. East Asia update, managing through a global downturn, East Asia and Pacific region: The World Bank; November 2006. .
  • 29
    • 3342970967 scopus 로고    scopus 로고
    • Large construction projects in developing country: a case study from Vietnam
    • Long N.D., Ogunlana S., Quang T., and Lam K.C. Large construction projects in developing country: a case study from Vietnam. Int J Project Manage 22 7 (2004) 553-561
    • (2004) Int J Project Manage , vol.22 , Issue.7 , pp. 553-561
    • Long, N.D.1    Ogunlana, S.2    Quang, T.3    Lam, K.C.4
  • 30
    • 0036603981 scopus 로고    scopus 로고
    • The effect of attitudinal differences on interface conflicts in large scale construction projects: a case study
    • Awakul P., and Ogunlana S.O. The effect of attitudinal differences on interface conflicts in large scale construction projects: a case study. Construct Manage Econom 20 4 (2002) 365-377
    • (2002) Construct Manage Econom , vol.20 , Issue.4 , pp. 365-377
    • Awakul, P.1    Ogunlana, S.O.2
  • 31
    • 56749182761 scopus 로고    scopus 로고
    • World Bank. Vietnam country program review 2005, volume II sector reports. The World Bank; 2005. p. 142. .
    • World Bank. Vietnam country program review 2005, volume II sector reports. The World Bank; 2005. p. 142. .
  • 32
    • 56749157053 scopus 로고    scopus 로고
    • Vnexpress VP. The schedule delay in many industrial construction projects; 02 February 2006. [in Vietnamese].
    • Vnexpress VP. The schedule delay in many industrial construction projects; 02 February 2006. [in Vietnamese].
  • 33
    • 56749103409 scopus 로고    scopus 로고
    • Thai A, Thuyen H. Dung quat refine oil project: why do 7 bidding packages delay? Thanhnien online; 06 March 2006. [in Vietnamese].
    • Thai A, Thuyen H. Dung quat refine oil project: why do 7 bidding packages delay? Thanhnien online; 06 March 2006. [in Vietnamese].
  • 34
    • 56749106375 scopus 로고    scopus 로고
    • Huong V. Delays in bridge projects: lesson learned from bridges in Ho Chi Minh city. Tuoitre online; 05 June 2004. [in Vietnamese].
    • Huong V. Delays in bridge projects: lesson learned from bridges in Ho Chi Minh city. Tuoitre online; 05 June 2004. [in Vietnamese].
  • 35
    • 56749139576 scopus 로고    scopus 로고
    • Hai NV, Quynh VH. Serious corruption in the Vietnamese oil and gas industry: largely waste money from the Thi Vai port project. Tuoitre online; 28 June 2006. [in Vietnamese].
    • Hai NV, Quynh VH. Serious corruption in the Vietnamese oil and gas industry: largely waste money from the Thi Vai port project. Tuoitre online; 28 June 2006. [in Vietnamese].
  • 36
    • 56749151539 scopus 로고    scopus 로고
    • Charles River Analytics. About Bayesian belief network. Charles River Analytics Inc.; 2004. [January 02, 2007].
    • Charles River Analytics. About Bayesian belief network. Charles River Analytics Inc.; 2004. [January 02, 2007].
  • 37
    • 0026880908 scopus 로고
    • Expert system for equipment selection for earth-moving operations
    • Amirkhanian S.N., and Baker N.J. Expert system for equipment selection for earth-moving operations. J Construct Eng Manage 118 2 (1992) 318-331
    • (1992) J Construct Eng Manage , vol.118 , Issue.2 , pp. 318-331
    • Amirkhanian, S.N.1    Baker, N.J.2
  • 38
    • 0011101936 scopus 로고    scopus 로고
    • Factors that effect process quality in the life cycle of building projects
    • Arditi D., and Gunaydin H.M. Factors that effect process quality in the life cycle of building projects. J Construct Eng Manage 124 3 (1998) 194-203
    • (1998) J Construct Eng Manage , vol.124 , Issue.3 , pp. 194-203
    • Arditi, D.1    Gunaydin, H.M.2
  • 39
    • 0032676962 scopus 로고    scopus 로고
    • Physiological demands of concrete slab placing and finishing work
    • Abdelhamid T.S., and Everett J.G. Physiological demands of concrete slab placing and finishing work. J Construct Eng Manage 125 1 (1999) 47-52
    • (1999) J Construct Eng Manage , vol.125 , Issue.1 , pp. 47-52
    • Abdelhamid, T.S.1    Everett, J.G.2
  • 40
    • 0342969753 scopus 로고    scopus 로고
    • Combined discrete-event continuous simulation for project planning
    • AbouRizk S.M., and Wales R.J. Combined discrete-event continuous simulation for project planning. J Construct Eng Manage 123 1 (1997) 11-20
    • (1997) J Construct Eng Manage , vol.123 , Issue.1 , pp. 11-20
    • AbouRizk, S.M.1    Wales, R.J.2
  • 41
    • 0031832477 scopus 로고    scopus 로고
    • Performance of concrete placing in Hong Kong buildings
    • Anson M., and Wang S.Q. Performance of concrete placing in Hong Kong buildings. J Construct Eng Manage 124 1 (1998) 116-124
    • (1998) J Construct Eng Manage , vol.124 , Issue.1 , pp. 116-124
    • Anson, M.1    Wang, S.Q.2
  • 42
    • 0022675344 scopus 로고
    • Attributes of materials management systems
    • Bell L.C., and Stukhart G. Attributes of materials management systems. J Construct Eng Manage 112 1 (1986) 14-21
    • (1986) J Construct Eng Manage , vol.112 , Issue.1 , pp. 14-21
    • Bell, L.C.1    Stukhart, G.2
  • 44
    • 2342442938 scopus 로고    scopus 로고
    • The architect/engineer's role rehabilitation work
    • Daoud O.E.K. The architect/engineer's role rehabilitation work. J Construct Eng Manage 123 1 (1997) 1-5
    • (1997) J Construct Eng Manage , vol.123 , Issue.1 , pp. 1-5
    • Daoud, O.E.K.1
  • 46
    • 0033101229 scopus 로고    scopus 로고
    • Overexertion injuries in construction
    • Everett G.J. Overexertion injuries in construction. J Construct Eng Manage 125 2 (1999) 109-114
    • (1999) J Construct Eng Manage , vol.125 , Issue.2 , pp. 109-114
    • Everett, G.J.1
  • 47
    • 0032208519 scopus 로고    scopus 로고
    • A better way to estimate and mitigate disruption
    • Finke M.R. A better way to estimate and mitigate disruption. J Construct Eng Manage 124 6 (1998) 490-497
    • (1998) J Construct Eng Manage , vol.124 , Issue.6 , pp. 490-497
    • Finke, M.R.1
  • 48
    • 0030318089 scopus 로고    scopus 로고
    • Automated constructability analysis of work-zone traffic-control planning
    • Fisher D.J., and Rajan N. Automated constructability analysis of work-zone traffic-control planning. J Construct Eng Manage 122 1 (1996) 36-43
    • (1996) J Construct Eng Manage , vol.122 , Issue.1 , pp. 36-43
    • Fisher, D.J.1    Rajan, N.2
  • 49
    • 0042275878 scopus 로고
    • Analysis of fatalities recorded by OSHA
    • Hinze J., and Russell D.B. Analysis of fatalities recorded by OSHA. J Construct Eng Manage 121 2 (1995) 209-214
    • (1995) J Construct Eng Manage , vol.121 , Issue.2 , pp. 209-214
    • Hinze, J.1    Russell, D.B.2
  • 50
    • 0013199180 scopus 로고    scopus 로고
    • Identifying root causes of construction injuries
    • Hinze J., Pederson C., and Fredley J. Identifying root causes of construction injuries. J Construct Eng Manage 124 1 (1998) 67-71
    • (1998) J Construct Eng Manage , vol.124 , Issue.1 , pp. 67-71
    • Hinze, J.1    Pederson, C.2    Fredley, J.3
  • 51
    • 2342431959 scopus 로고    scopus 로고
    • Bidding considerations in developing countries
    • Jaselkis E.J., and Talukhaba A. Bidding considerations in developing countries. J Construct Eng Manage 124 3 (1998) 185-193
    • (1998) J Construct Eng Manage , vol.124 , Issue.3 , pp. 185-193
    • Jaselkis, E.J.1    Talukhaba, A.2
  • 52
    • 0029747295 scopus 로고    scopus 로고
    • Making effective use of construction lessons learned in project life cycle
    • Kartam N.A. Making effective use of construction lessons learned in project life cycle. J Construct Eng Manage 122 1 (1996) 14-21
    • (1996) J Construct Eng Manage , vol.122 , Issue.1 , pp. 14-21
    • Kartam, N.A.1
  • 53
    • 0029746285 scopus 로고    scopus 로고
    • Lessons learned from multiphase reconstruction project
    • Krizek R.J., Lo W., and Hadavi A. Lessons learned from multiphase reconstruction project. J Construct Eng Manage 122 1 (1996) 44-54
    • (1996) J Construct Eng Manage , vol.122 , Issue.1 , pp. 44-54
    • Krizek, R.J.1    Lo, W.2    Hadavi, A.3
  • 54
    • 0025398530 scopus 로고
    • Factors affecting construction planning outcomes
    • Laufer A., and Cohenca D. Factors affecting construction planning outcomes. J Construct Eng Manage 116 1 (1990) 135-156
    • (1990) J Construct Eng Manage , vol.116 , Issue.1 , pp. 135-156
    • Laufer, A.1    Cohenca, D.2
  • 56
    • 0022681473 scopus 로고
    • Motivational implications of construction work
    • Maloney W.F., and McFillen J.M. Motivational implications of construction work. J Construct Eng Manage 112 1 (1986) 137-151
    • (1986) J Construct Eng Manage , vol.112 , Issue.1 , pp. 137-151
    • Maloney, W.F.1    McFillen, J.M.2
  • 57
    • 0032670945 scopus 로고    scopus 로고
    • Risk assessment in construction schedules
    • Mulholland B., and Christian J. Risk assessment in construction schedules. J Construct Eng Manage 125 1 (1999) 8-15
    • (1999) J Construct Eng Manage , vol.125 , Issue.1 , pp. 8-15
    • Mulholland, B.1    Christian, J.2
  • 58
    • 0026882125 scopus 로고
    • Non-contractual methods of integration on construction projects
    • Nam C.H., and Tatum C.B. Non-contractual methods of integration on construction projects. J Construct Eng Manage 118 2 (1992) 385-398
    • (1992) J Construct Eng Manage , vol.118 , Issue.2 , pp. 385-398
    • Nam, C.H.1    Tatum, C.B.2
  • 59
    • 0032052024 scopus 로고    scopus 로고
    • Simulation modeling and management of a large basement construction
    • Ng W.M., Khor E.L., Tiong L.K., and Lee J. Simulation modeling and management of a large basement construction. J Comput Civil Eng 12 2 (1998) 101-110
    • (1998) J Comput Civil Eng , vol.12 , Issue.2 , pp. 101-110
    • Ng, W.M.1    Khor, E.L.2    Tiong, L.K.3    Lee, J.4
  • 60
    • 0002299336 scopus 로고    scopus 로고
    • Space planning methods for multistory building construction
    • Riley D.R., and Sanvido V.E. Space planning methods for multistory building construction. J Construct Eng Manage 123 2 (1997) 171-180
    • (1997) J Construct Eng Manage , vol.123 , Issue.2 , pp. 171-180
    • Riley, D.R.1    Sanvido, V.E.2
  • 62
    • 0042640313 scopus 로고    scopus 로고
    • Owner-contractor relationships contaminated site remediation projects
    • Ruff C.M., Dzombak D.A., and Hendrickson C.T. Owner-contractor relationships contaminated site remediation projects. J Construct Eng Manage 122 4 (1996) 348-353
    • (1996) J Construct Eng Manage , vol.122 , Issue.4 , pp. 348-353
    • Ruff, C.M.1    Dzombak, D.A.2    Hendrickson, C.T.3
  • 63
    • 0027608442 scopus 로고
    • Computerized daily site reporting
    • Russell A.D. Computerized daily site reporting. J Construct Eng Manage 119 2 (1993) 385-402
    • (1993) J Construct Eng Manage , vol.119 , Issue.2 , pp. 385-402
    • Russell, A.D.1
  • 65
    • 0033099726 scopus 로고    scopus 로고
    • Small to medium contractor contingency and assumption of risk
    • Smith G.R., and Bohn C.M. Small to medium contractor contingency and assumption of risk. J Construct Eng Manage 125 2 (1999) 101-108
    • (1999) J Construct Eng Manage , vol.125 , Issue.2 , pp. 101-108
    • Smith, G.R.1    Bohn, C.M.2
  • 66
    • 0000971955 scopus 로고    scopus 로고
    • Project characteristics for successful public-sector deign-build
    • Songer A.D., and Molenaar K.R. Project characteristics for successful public-sector deign-build. J Construct Eng Manage 123 1 (1997) 34-40
    • (1997) J Construct Eng Manage , vol.123 , Issue.1 , pp. 34-40
    • Songer, A.D.1    Molenaar, K.R.2
  • 67
    • 0032206731 scopus 로고    scopus 로고
    • Construction labor productivity modeling with neural networks
    • Sonmez R., and Rowings J.E. Construction labor productivity modeling with neural networks. J Construct Eng Manage 124 6 (1998) 498-504
    • (1998) J Construct Eng Manage , vol.124 , Issue.6 , pp. 498-504
    • Sonmez, R.1    Rowings, J.E.2
  • 68
    • 0026837613 scopus 로고
    • Effects of scheduled overtime on labor productivity
    • Thomas H.R. Effects of scheduled overtime on labor productivity. J Construct Eng Manage 118 1 (1992) 60-76
    • (1992) J Construct Eng Manage , vol.118 , Issue.1 , pp. 60-76
    • Thomas, H.R.1
  • 70
    • 0029361062 scopus 로고
    • Quantitative effects of construction changes on labor productivity
    • Thomas H.R., and Napolitan C.L. Quantitative effects of construction changes on labor productivity. J Construct Eng Manage 121 3 (1995) 290-296
    • (1995) J Construct Eng Manage , vol.121 , Issue.3 , pp. 290-296
    • Thomas, H.R.1    Napolitan, C.L.2
  • 71
    • 0000849119 scopus 로고    scopus 로고
    • Scheduled overtime on labor productivity: a quantitative analysis
    • Thomas H.R., and Raynar K.A. Scheduled overtime on labor productivity: a quantitative analysis. J Construct Eng Manage 123 2 (1997) 181-188
    • (1997) J Construct Eng Manage , vol.123 , Issue.2 , pp. 181-188
    • Thomas, H.R.1    Raynar, K.A.2
  • 72
    • 0032673945 scopus 로고    scopus 로고
    • Loss of labor productivity due to delivery methods and weather
    • Thomas R.T., Riley D.R., and Sanvido V.E. Loss of labor productivity due to delivery methods and weather. J Construct Eng Manage 125 1 (1999) 39-46
    • (1999) J Construct Eng Manage , vol.125 , Issue.1 , pp. 39-46
    • Thomas, R.T.1    Riley, D.R.2    Sanvido, V.E.3
  • 73
    • 0022677597 scopus 로고
    • Owner and contractor review to reduce claims
    • Vlatas D.A. Owner and contractor review to reduce claims. J Construct Eng Manage 112 1 (1986) 104-111
    • (1986) J Construct Eng Manage , vol.112 , Issue.1 , pp. 104-111
    • Vlatas, D.A.1
  • 74
    • 0027610716 scopus 로고
    • Construction decision support system for delay analysis
    • Yates J.K. Construction decision support system for delay analysis. J Construct Eng Manage 119 2 (1993) 226-244
    • (1993) J Construct Eng Manage , vol.119 , Issue.2 , pp. 226-244
    • Yates, J.K.1
  • 75
    • 0000725583 scopus 로고
    • Causes of delay and cost overruns in Nigerian construction projects
    • Mansfield N.R., Ugwu O.O., and Doran T. Causes of delay and cost overruns in Nigerian construction projects. Int J Project Manage 12 4 (1994) 254-260
    • (1994) Int J Project Manage , vol.12 , Issue.4 , pp. 254-260
    • Mansfield, N.R.1    Ugwu, O.O.2    Doran, T.3
  • 76
    • 33749024426 scopus 로고    scopus 로고
    • Factors influencing the construction time of civil engineering projects in Malaysia
    • Othman A.A., Torrance J.V., and Hamid M.A. Factors influencing the construction time of civil engineering projects in Malaysia. Eng Construct Architec Manage 13 5 (2006) 481-501
    • (2006) Eng Construct Architec Manage , vol.13 , Issue.5 , pp. 481-501
    • Othman, A.A.1    Torrance, J.V.2    Hamid, M.A.3
  • 77
    • 0039997969 scopus 로고    scopus 로고
    • Factors influencing construction time and cost overruns on high-rise projects in Indonesia
    • Kaming P.F., Olomolaiye P.O., Holt G.D., and Harris F.C. Factors influencing construction time and cost overruns on high-rise projects in Indonesia. Construct Manage Econom 15 (1997) 83-94
    • (1997) Construct Manage Econom , vol.15 , pp. 83-94
    • Kaming, P.F.1    Olomolaiye, P.O.2    Holt, G.D.3    Harris, F.C.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.