메뉴 건너뛰기




Volumn , Issue , 2009, Pages 266-277

Basic study of smart robotic construction lift for increasing resource lifting efficiency in high-rise building construction

Author keywords

Concept model; High rise building construction; Operation optimization; Robotic construction lift; Smart lift

Indexed keywords

AUTONOMOUS OPERATIONS; BUILDING HEIGHT; CONCEPT MODEL; CONSTRUCTION SITES; CONSTRUCTION TECHNOLOGIES; DEVELOPMENT TOOLKIT; DISPATCH ALGORITHMS; HIGH RISE BUILDING; ITS EFFICIENCIES; JUST IN TIME; LIFT SYSTEM; LIMITED SPACE; MECHANICAL PERFORMANCE; NIGHT TIME; OPERATION OPTIMIZATION; OPERATION PLAN; OPTIMIZED OPERATIONS; OVERALL EFFICIENCY; ROBOTIC CONSTRUCTION; SPACE CONSTRAINTS; STOCK MATERIALS; STORAGE SPACES; SYSTEM DEVELOPMENT; TRANSPORTATION ROBOTS; TRANSPORTING MATERIALS; UBIQUITOUS SENSOR NETWORKS;

EID: 84863766827     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (9)

References (9)
  • 2
    • 84860288528 scopus 로고    scopus 로고
    • A feasibility study on optimal lifting planning in the high-rise apartment building construction
    • (Korean)
    • Lee, J.B. et. al. (2008) A Feasibility Study on Optimal Lifting Planning in the High-rise Apartment Building Construction, Journal of Korea Institute of Construction Engineering and Management Institute 9(3), pp. 185-193 (Korean)
    • (2008) Journal of Korea Institute of Construction Engineering and Management Institute , vol.9 , Issue.3 , pp. 185-193
    • Lee, J.B.1
  • 3
    • 84863760852 scopus 로고    scopus 로고
    • A system for the selection fo the optimum tower cranes (Opt-TC)
    • (Korean)
    • Ho, J.K. (2007). A System for the Selection fo the Optimum Tower Cranes (Opt-TC). Journals of KICEM. 8(6). (Korean)
    • (2007) Journals of KICEM , vol.8 , Issue.6
    • Ho, J.K.1
  • 5
    • 84863764565 scopus 로고    scopus 로고
    • A study on the hoisting planning system in highrise building construction
    • (Korean)
    • Kim, J.J. (2005). A Study on the Hoisting Planning System in Highrise Building Construction. Journal of Korea Institute of Construction 5(4). (Korean)
    • (2005) Journal of Korea Institute of Construction , vol.5 , Issue.4
    • Kim, J.J.1
  • 6
    • 84863733534 scopus 로고    scopus 로고
    • A study of the highrise building's lift-up management: Through division of loading factors of equipment materials
    • (Korean)
    • Chung, Y.W. (2004). A study of the Highrise Building's Lift-up Management: Through Division of Loading Factors of Equipment Materials. Proceedings of 5th Annual Conference of KICEM. (Korean)
    • (2004) Proceedings of 5th Annual Conference of KICEM
    • Chung, Y.W.1
  • 7
    • 84863729098 scopus 로고    scopus 로고
    • A study on the method of new activity based cost management coping with changes in the cost structure of real estate construction industry
    • (Korean)
    • Lee, H.S. (2004). A Study on the Method of New Activity Based Cost Management Coping With Changes in the Cost Structure of Real Estate Construction Industry. Journal of KICEM 5(1). (Korean)
    • (2004) Journal of KICEM , vol.5 , Issue.1
    • Lee, H.S.1
  • 8
    • 84863764564 scopus 로고    scopus 로고
    • A study on the estimation of proper numbers of construction lifts
    • (Korean)
    • Kim, S.K. (2008). A Study on the Estimation of Proper Numbers of Construction Lifts. Journal of KIC 8(3). (Korean)
    • (2008) Journal of KIC , vol.8 , Issue.3
    • Kim, S.K.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.