1
-
-
78649323790
-
A vertical movement plan for labors in high-rise building construction using discrete-event simulation
-
Ahn, Byeongju(2004) A Vertical Movement Plan for Labors in High-Rise Building Construction Using Discrete-Event Simulation, Journals of KICEM, 5(1), 47-54.
-
(2004)
Journals of KICEM
, vol.5
, Issue.1
, pp. 47-54
-
-
Ahn, B.1
-
2
-
-
78649317517
-
A development of next generation intelligent construction liftcar toolkit for vertical material movement management
-
Cho, C. Shin T., Kwon S., Chin S., Kim Y. and Lee J. (2009), A Development of Next Generation Intelligent Construction Liftcar Toolkit for Vertical Material Movement Management, Conference Proceeding of ICCEM. 3(1), 242-249
-
(2009)
Conference Proceeding of ICCEM
, vol.3
, Issue.1
, pp. 242-249
-
-
Cho, C.1
Shin, T.2
Kwon, S.3
Chin, S.4
Kim, Y.5
Lee, J.6
-
3
-
-
18744393158
-
Optimization algorithm for selection and on site location of mobile cranes
-
Mohamed Al-Hussein, Sabah, A. and Osama, M. (2005), Optimization Algorithm for Selection and on Site Location of Mobile Cranes, Journal of Construction Engineering and Management, 131(5), 579-590
-
(2005)
Journal of Construction Engineering and Management
, vol.131
, Issue.5
, pp. 579-590
-
-
Al-Hussein, M.1
Sabah, A.2
Osama, M.3
-
4
-
-
33746350454
-
Integrating 3D visualization and simulation for tower crane operations on construction sites
-
Mohamed Al-Hussein, M, Niaz., M.A., Yu, H., Kim, H.K. (2006), "Integrating 3D visualization and simulation for tower crane operations on construction sites "Automation in Construction, Automation in Construction, 15(5), 554-562
-
(2006)
Automation in Construction, Automation in Construction
, vol.15
, Issue.5
, pp. 554-562
-
-
Mohamed Al-Hussein, M.1
Niaz, M.A.2
Yu, H.3
Kim, H.K.4
-
5
-
-
18744383106
-
Feasibility of automated monitoring of lifting equipment in support of project control
-
R. Sacks, R. Navon, I. Brodetskaia and A. Shapira(2005), Feasibility of Automated Monitoring of Lifting Equipment in Support of Project Control, Journal of Construction Engineering and Management, 131(5), 604-614
-
(2005)
Journal of Construction Engineering and Management
, vol.131
, Issue.5
, pp. 604-614
-
-
Sacks, R.1
Navon, R.2
Brodetskaia, I.3
Shapira, A.4
-
6
-
-
33847198334
-
Optimization of floor-level construction material layout using genetic algorithms
-
Jang, H., Lee, S. and Choi, S. (2007), Optimization of floor-level construction material layout using Genetic Algorithms, Automation in Construction, 16(7), 531-545
-
(2007)
Automation in Construction
, vol.16
, Issue.7
, pp. 531-545
-
-
Jang, H.1
Lee, S.2
Choi, S.3
-
7
-
-
37249020345
-
Simulation-based identification of possible locations for mobile cranes on construction sites
-
Kevin Tantisevi and Burcu, A. (2008), Simulation-Based Identification of Possible Locations for Mobile Cranes on Construction Sites, Journal of Computing in Civil Engineering, 22(1), 21-30
-
(2008)
Journal of Computing in Civil Engineering
, vol.22
, Issue.1
, pp. 21-30
-
-
Tantisevi, K.1
Burcu, A.2
-
8
-
-
84863738378
-
An analysis of the optimal planning of material lifting in the high-rise building construction
-
Park, K., Jang, M. and Lee, H. (2001) An Analysis of the Optimal Planning of Material Lifting in the High-rise Building Construction, Conference Proceeding of AIK, 21(2), 515-519
-
(2001)
Conference Proceeding of AIK
, vol.21
, Issue.2
, pp. 515-519
-
-
Park, K.1
Jang, M.2
Lee, H.3
-
9
-
-
84863766827
-
Basic study of smart robotic construction lift for increasing resource lifting efficiency in high-rise building construction
-
Cho, C. Kwon S., Lee J., You S., Chin S. and Kim Y. (2009), Basic Study of Smart Robotic Construction Lift for Increasing Resource Lifting Efficiency in High-Rise Building Construction, Conference Proceeding of ISARC, 26(1), 483-491
-
(2009)
Conference Proceeding of ISARC
, vol.26
, Issue.1
, pp. 483-491
-
-
Cho, C.1
Kwon, S.2
Lee, J.3
You, S.4
Chin, S.5
Kim, Y.6
|