메뉴 건너뛰기




Volumn , Issue , 2010, Pages 22-28

Simulation method of construction hoist operating plan for high rise buildings considering lifting heights and loads

Author keywords

High rise building; Hoist; Lift car; Lifting; Lifting management; Simulation

Indexed keywords

CONSTRUCTION PROJECTS; CONSTRUCTION RESOURCE; EFFICIENT CONSTRUCTION; EMPIRICAL METHOD; HIGH RISE BUILDING; LIFTING; LIFTING EQUIPMENTS; LIFTING HEIGHT; OPERATION METHODS; PROJECT SCHEDULES; SIMULATION; SIMULATION METHODS;

EID: 84863767659     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (14)

References (9)
  • 1
    • 78649323790 scopus 로고    scopus 로고
    • A vertical movement plan for labors in high-rise building construction using discrete-event simulation
    • Ahn, Byeongju(2004) A Vertical Movement Plan for Labors in High-Rise Building Construction Using Discrete-Event Simulation, Journals of KICEM, 5(1), 47-54.
    • (2004) Journals of KICEM , vol.5 , Issue.1 , pp. 47-54
    • Ahn, B.1
  • 2
    • 78649317517 scopus 로고    scopus 로고
    • A development of next generation intelligent construction liftcar toolkit for vertical material movement management
    • Cho, C. Shin T., Kwon S., Chin S., Kim Y. and Lee J. (2009), A Development of Next Generation Intelligent Construction Liftcar Toolkit for Vertical Material Movement Management, Conference Proceeding of ICCEM. 3(1), 242-249
    • (2009) Conference Proceeding of ICCEM , vol.3 , Issue.1 , pp. 242-249
    • Cho, C.1    Shin, T.2    Kwon, S.3    Chin, S.4    Kim, Y.5    Lee, J.6
  • 6
    • 33847198334 scopus 로고    scopus 로고
    • Optimization of floor-level construction material layout using genetic algorithms
    • Jang, H., Lee, S. and Choi, S. (2007), Optimization of floor-level construction material layout using Genetic Algorithms, Automation in Construction, 16(7), 531-545
    • (2007) Automation in Construction , vol.16 , Issue.7 , pp. 531-545
    • Jang, H.1    Lee, S.2    Choi, S.3
  • 7
    • 37249020345 scopus 로고    scopus 로고
    • Simulation-based identification of possible locations for mobile cranes on construction sites
    • Kevin Tantisevi and Burcu, A. (2008), Simulation-Based Identification of Possible Locations for Mobile Cranes on Construction Sites, Journal of Computing in Civil Engineering, 22(1), 21-30
    • (2008) Journal of Computing in Civil Engineering , vol.22 , Issue.1 , pp. 21-30
    • Tantisevi, K.1    Burcu, A.2
  • 8
    • 84863738378 scopus 로고    scopus 로고
    • An analysis of the optimal planning of material lifting in the high-rise building construction
    • Park, K., Jang, M. and Lee, H. (2001) An Analysis of the Optimal Planning of Material Lifting in the High-rise Building Construction, Conference Proceeding of AIK, 21(2), 515-519
    • (2001) Conference Proceeding of AIK , vol.21 , Issue.2 , pp. 515-519
    • Park, K.1    Jang, M.2    Lee, H.3
  • 9
    • 84863766827 scopus 로고    scopus 로고
    • Basic study of smart robotic construction lift for increasing resource lifting efficiency in high-rise building construction
    • Cho, C. Kwon S., Lee J., You S., Chin S. and Kim Y. (2009), Basic Study of Smart Robotic Construction Lift for Increasing Resource Lifting Efficiency in High-Rise Building Construction, Conference Proceeding of ISARC, 26(1), 483-491
    • (2009) Conference Proceeding of ISARC , vol.26 , Issue.1 , pp. 483-491
    • Cho, C.1    Kwon, S.2    Lee, J.3    You, S.4    Chin, S.5    Kim, Y.6


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.