Management of the risk of backorders in a MTO-ATO/MTS context under imperfect requirements

Author keywords

Fuzzy optimisation; Manufacturing; MRP; Planning

Indexed keywords

DECOUPLING POINT; EFFICIENT MANAGEMENTS; ENGINEER TO ORDERS; FUZZY MODELLING; FUZZY OPTIMISATION; MRP; PRODUCTION SYSTEM; SPECIFIC PROBLEMS;

EID: 84881542078     PISSN: 0307904X     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.apm.2013.03.019     Document Type: Article
Times cited : (14)

References (36)
  • 1
    • 70449458354 scopus 로고    scopus 로고
    • Decision support for supply chain planning under uncertainty
    • 12th IFAC International Symposium Information Control Problems in Manufacturing (INCOM), St-Etienne, France
    • F. Galasso, Mercé C., B. Grabot, Decision support for supply chain planning under uncertainty. in: 12th IFAC International Symposium Information Control Problems in Manufacturing (INCOM), St-Etienne, France, 2006, pp. 233-238.
    • (2006) , pp. 233-238
    • Galasso, F.1    Mercé, C.2    Grabot, B.3
  • 4
    • 34548515744 scopus 로고    scopus 로고
    • Optimal safety stock levels of subassemblies and manufacturing components
    • Persona A., Battini D., Manzini R., Pareschi A. Optimal safety stock levels of subassemblies and manufacturing components. Int. J. Prod. Econ. 2007, 110(1-2):147-159.
    • (2007) Int. J. Prod. Econ. , vol.110 , Issue.1-2 , pp. 147-159
    • Persona, A.1    Battini, D.2    Manzini, R.3    Pareschi, A.4
  • 5
    • 77952742668 scopus 로고    scopus 로고
    • Collaborative planning in supply chains
    • Dudek G. Collaborative planning in supply chains. Lect. Notes Econ. Math. Syst. 2004, 533.
    • (2004) Lect. Notes Econ. Math. Syst. , pp. 533
    • Dudek, G.1
  • 6
    • 77957898528 scopus 로고    scopus 로고
    • Supply chain Collaboration: how to implement CPFR® and other best collaborative practices
    • Ireland, R., Crum, C., (2005). Supply chain Collaboration: how to implement CPFR® and other best collaborative practices, Integrated Business Management series and APICS.
    • (2005) Integrated Business Management series and APICS.
    • Ireland, R.1    Crum, C.2
  • 7
    • 79957798917 scopus 로고    scopus 로고
    • Modelling of ill-known requirements and integration in production planning
    • Guillaume R., Thierry C., Grabot B. Modelling of ill-known requirements and integration in production planning. Prod. Plan. Control 2011, 22(4):336-352.
    • (2011) Prod. Plan. Control , vol.22 , Issue.4 , pp. 336-352
    • Guillaume, R.1    Thierry, C.2    Grabot, B.3
  • 8
    • 17444389311 scopus 로고    scopus 로고
    • Integration of uncertain and imprecise orders in the MRP method
    • Grabot B., Geneste L., Reynoso Castillo G., Vérot S. Integration of uncertain and imprecise orders in the MRP method. J. Intell. Manuf. 2005, 16(2):215-234.
    • (2005) J. Intell. Manuf. , vol.16 , Issue.2 , pp. 215-234
    • Grabot, B.1    Geneste, L.2    Reynoso Castillo, G.3    Vérot, S.4
  • 9
    • 33645854036 scopus 로고    scopus 로고
    • The use of possibilistic decision theory in manufacturing, planning and control: recent results in fuzzy master production scheduling
    • Spingler-Verlag, R. Slowinski, M. Hapke (Eds.)
    • Fargier H., Thierry C. The use of possibilistic decision theory in manufacturing, planning and control: recent results in fuzzy master production scheduling. Studies in Fuzziness and Soft Computing 2000, vol. 36:45-59. Spingler-Verlag. R. Slowinski, M. Hapke (Eds.).
    • (2000) Studies in Fuzziness and Soft Computing , vol.36 , pp. 45-59
    • Fargier, H.1    Thierry, C.2
  • 10
    • 70350568663 scopus 로고    scopus 로고
    • Engineer-to-order supply chain management: a literature review and research agenda
    • Gosling J., Naim M. Engineer-to-order supply chain management: a literature review and research agenda. Int. J. Prod. Econ. 2009, 122(2):741-754.
    • (2009) Int. J. Prod. Econ. , vol.122 , Issue.2 , pp. 741-754
    • Gosling, J.1    Naim, M.2
  • 11
    • 0037810496 scopus 로고    scopus 로고
    • Strategic positioning of the order penetration point
    • Olhager J. Strategic positioning of the order penetration point. Int. J. Prod. Econ. 2003, 85(3):319-329.
    • (2003) Int. J. Prod. Econ. , vol.85 , Issue.3 , pp. 319-329
    • Olhager, J.1
  • 12
    • 54649084281 scopus 로고    scopus 로고
    • Combining make to order and make to stock
    • Adam I., Wal J. Combining make to order and make to stock. OR Spektrum 1998, 20(2):73-81.
    • (1998) OR Spektrum , vol.20 , Issue.2 , pp. 73-81
    • Adam, I.1    Wal, J.2
  • 13
    • 2642516348 scopus 로고    scopus 로고
    • Combined make-to-order and make-to-stock in a food production system
    • Soman C.A., Pieter van Donk D., Gaalman G. Combined make-to-order and make-to-stock in a food production system. Int. J. Prod. Econ. 2004, 90(2):223-235.
    • (2004) Int. J. Prod. Econ. , vol.90 , Issue.2 , pp. 223-235
    • Soman, C.A.1    Pieter van Donk, D.2    Gaalman, G.3
  • 14
    • 0036475271 scopus 로고    scopus 로고
    • Make to order or make to stock: model and application
    • Rajagopalan S. Make to order or make to stock: model and application. Manage. Sci. 2002, 48(2):241-256.
    • (2002) Manage. Sci. , vol.48 , Issue.2 , pp. 241-256
    • Rajagopalan, S.1
  • 15
    • 67651068254 scopus 로고    scopus 로고
    • Fuzzy optimization for supply chain planning under supply, demand and process uncertainties
    • Peidro D., Mula J., Poler R., Verdegay J.L. Fuzzy optimization for supply chain planning under supply, demand and process uncertainties. Fuzzy Sets Syst. 2009, 160(18):2640-2657.
    • (2009) Fuzzy Sets Syst. , vol.160 , Issue.18 , pp. 2640-2657
    • Peidro, D.1    Mula, J.2    Poler, R.3    Verdegay, J.L.4
  • 16
    • 49349133217 scopus 로고
    • Fuzzy sets as a basis for a theory of possibility
    • Zadeh L.A. Fuzzy sets as a basis for a theory of possibility. Fuzzy Sets Syst. 1978, 1:3-28.
    • (1978) Fuzzy Sets Syst. , vol.1 , pp. 3-28
    • Zadeh, L.A.1
  • 18
    • 0019585325 scopus 로고
    • A procedure for ordering fuzzy subsets of the unit interval
    • Yager R.R. A procedure for ordering fuzzy subsets of the unit interval. Inform. Sci. 1981, 24:143-161.
    • (1981) Inform. Sci. , vol.24 , pp. 143-161
    • Yager, R.R.1
  • 19
    • 0346636333 scopus 로고
    • Decision-making in a fuzzy environment
    • Bellman R.E., Zadeh L.A. Decision-making in a fuzzy environment. Manage. Sci. 1970, 17:B-141-B-164.
    • (1970) Manage. Sci. , vol.17
    • Bellman, R.E.1    Zadeh, L.A.2
  • 21
    • 77957773775 scopus 로고    scopus 로고
    • The effectiveness of a fuzzy mathematical programming approach for supply chain production planning with fuzzy demand
    • Mula J., Peidro D., Poler R. The effectiveness of a fuzzy mathematical programming approach for supply chain production planning with fuzzy demand. Int. J. Prod. Econ. 2010, 128:136-143.
    • (2010) Int. J. Prod. Econ. , vol.128 , pp. 136-143
    • Mula, J.1    Peidro, D.2    Poler, R.3
  • 24
    • 84881552545 scopus 로고    scopus 로고
    • A decision support tool for procurement planning process under uncertainty
    • 18th World Congress of the International Federation of Automatic Control, Milan, 28-2 September
    • Guillaume, R., Thierry, C., and B. Grabot, A decision support tool for procurement planning process under uncertainty, in: 18th World Congress of the International Federation of Automatic Control, Milan, 28-2 September, 2011b.
    • (2011)
    • Guillaume, R.1    Thierry, C.2    Grabot, B.3
  • 25
    • 33846833792 scopus 로고    scopus 로고
    • Material requirement planning with fuzzy constraints and fuzzy coefficients
    • Mula J., Poler R., Garcia-Sabater J.P. Material requirement planning with fuzzy constraints and fuzzy coefficients. Fuzzy Sets Syst. 2007, 158(7):783-793.
    • (2007) Fuzzy Sets Syst. , vol.158 , Issue.7 , pp. 783-793
    • Mula, J.1    Poler, R.2    Garcia-Sabater, J.P.3
  • 26
    • 29344452896 scopus 로고    scopus 로고
    • Order-fulfillment ability analysis in the supply-chain system with fuzzy operation times
    • Chen C.-T., Huang S.-F. Order-fulfillment ability analysis in the supply-chain system with fuzzy operation times. Int. J. Prod. Econ. 2006, 101:185-193.
    • (2006) Int. J. Prod. Econ. , vol.101 , pp. 185-193
    • Chen, C.-T.1    Huang, S.-F.2
  • 27
    • 0037445865 scopus 로고    scopus 로고
    • Scheduling optimization under uncertainty an alternative approach
    • Balasubramanian J., Grossmann I.E. Scheduling optimization under uncertainty an alternative approach. Comput. Chem. Eng. 2003, 27:469-490.
    • (2003) Comput. Chem. Eng. , vol.27 , pp. 469-490
    • Balasubramanian, J.1    Grossmann, I.E.2
  • 28
    • 0022266758 scopus 로고
    • Manufacturing resource planning: an information systems model
    • Adams F.P., Cox J.F. Manufacturing resource planning: an information systems model. Long Range Plan. 1985, 18(2):86-92.
    • (1985) Long Range Plan. , vol.18 , Issue.2 , pp. 86-92
    • Adams, F.P.1    Cox, J.F.2
  • 29
    • 0034321179 scopus 로고    scopus 로고
    • The impact of material coordination concepts on planning stability in supply chains
    • Van Donselaar K., Van Den Nieuwenhof J., Visschers J. The impact of material coordination concepts on planning stability in supply chains. Int. J. Prod. Econ. 2000, 68(2):169-176.
    • (2000) Int. J. Prod. Econ. , vol.68 , Issue.2 , pp. 169-176
    • Van Donselaar, K.1    Van Den Nieuwenhof, J.2    Visschers, J.3
  • 30
    • 75849145567 scopus 로고    scopus 로고
    • A fuzzy linear programming based approach for tactical supply chain planning in an uncertainty environment
    • Peidro D., Mula J., Jiménez M., Botella M.d.M. A fuzzy linear programming based approach for tactical supply chain planning in an uncertainty environment. Eur. J. Oper. Res. 2010, 205:65-80.
    • (2010) Eur. J. Oper. Res. , vol.205 , pp. 65-80
    • Peidro, D.1    Mula, J.2    Jiménez, M.3    Botella, M.4
  • 31
    • 79957820617 scopus 로고    scopus 로고
    • Représentations formelles de l'incertain et de l'imprécis
    • Hermès Science Publications, Outils de modélisation
    • Dubois D., Prade H. Représentations formelles de l'incertain et de l'imprécis. Concepts et méthodes pour l'aide à la décision 2006, vol. 1. Hermès Science Publications.
    • (2006) Concepts et méthodes pour l'aide à la décision , vol.1
    • Dubois, D.1    Prade, H.2
  • 32
    • 42549099494 scopus 로고    scopus 로고
    • Gradual numbers and their application to fuzzyinterval analysis
    • Fortin J., Dubois D., Fargier H. Gradual numbers and their application to fuzzyinterval analysis. IEEE Trans. Fuzzy Syst. 2008, 16(2):388-402.
    • (2008) IEEE Trans. Fuzzy Syst. , vol.16 , Issue.2 , pp. 388-402
    • Fortin, J.1    Dubois, D.2    Fargier, H.3
  • 34
    • 38249026788 scopus 로고
    • Maximin, leximin and the protective criterion
    • Barbera S., Jackson M. Maximin, leximin and the protective criterion. J. Econ. Theory 1988, 46(1):34-44.
    • (1988) J. Econ. Theory , vol.46 , Issue.1 , pp. 34-44
    • Barbera, S.1    Jackson, M.2
  • 35
    • 0023548442 scopus 로고
    • The mean value of a fuzzy number
    • Dubois D., Prade H. The mean value of a fuzzy number. Fuzzy Sets Syst. 1987, 24:279-300.
    • (1987) Fuzzy Sets Syst. , vol.24 , pp. 279-300
    • Dubois, D.1    Prade, H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.