Volumn 60, Issue , 2013, Pages 251-261

Impact of the German nuclear phase-out on Europe's electricity generation-A comprehensive study

Author keywords

Germany; Nuclear phase out; Unit commitment and economic dispatch model

Indexed keywords

ECONOMIC DISPATCH; ELECTRICITY GENERATION; ELECTRICITY-GENERATION SYSTEM; GERMANY; GREENHOUSE GAS REDUCTIONS; NUCLEAR PHASE-OUT; OPERATIONAL RELIABILITY; RENEWABLE ENERGY SOURCE;

EID: 84880326447     PISSN: 03014215     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.enpol.2013.05.026     Document Type: Article
Times cited : (81)

References (58)
  • 1
    • 84880328045 scopus 로고    scopus 로고
    • 50Hertz Transmission GmbH, 2012. 50Hertz Transmission GmbH. Available at:
    • 50Hertz Transmission GmbH, 2012. 50Hertz Transmission GmbH. Available at: http://www.50hertz.com.
  • 2
    • 84880331289 scopus 로고    scopus 로고
    • 50Hertz Transmission GmbH, Amperion GmbH, Transnet BW GmbH, TenneT TSO GmbH, Bundesnetzagentur, Netzentwicklungsplan strom 2012. Technical Report. Berlin, Germany.
    • 50Hertz Transmission GmbH, Amperion GmbH, Transnet BW GmbH, TenneT TSO GmbH, Bundesnetzagentur, 2012. Netzentwicklungsplan strom 2012. Technical Report. Berlin, Germany.
    • (2012)
  • 3
    • 68049092132 scopus 로고    scopus 로고
    • Can Germany survive without nuclear power?
    • Ackland L. Can Germany survive without nuclear power?. Bulletin of the Atomic Scientists 2009, 65:41-52.
    • (2009) Bulletin of the Atomic Scientists , vol.65 , pp. 41-52
    • Ackland, L.1
  • 4
    • 84880329963 scopus 로고    scopus 로고
    • Amperion GmbH, Amperion GmbH. Available at:
    • Amperion GmbH, 2012. Amperion GmbH. Available at: http://www.amprion.de.
    • (2012)
  • 5
    • 84880328663 scopus 로고    scopus 로고
    • Amperion GmbH, EnBW Transportnetze AG, Transpower stromübertragungs GmbH, Vattenfall Europe Transmission GmbH, 2009a. Übersicht über die installierte Kraftwerksleistung und die Leistungsflüsse in den Netzgebieten der deutschen Übertragungsnetzbetreiber (Regionenmodell Stromtransport 2009). Technical Report. Berlin, Germany.
    • Amperion GmbH, EnBW Transportnetze AG, Transpower stromübertragungs GmbH, Vattenfall Europe Transmission GmbH, 2009a. Übersicht über die installierte Kraftwerksleistung und die Leistungsflüsse in den Netzgebieten der deutschen Übertragungsnetzbetreiber (Regionenmodell Stromtransport 2009). Technical Report. Berlin, Germany.
  • 6
    • 84880326194 scopus 로고    scopus 로고
    • Amperion GmbH, EnBW Transportnetze AG, Transpower stromübertragungs GmbH, Vattenfall Europe Transmission GmbH, Übersicht über die voraussichtliche Entwicklung der installierten Kraftwerksleistung und der Leistungsflüsse in den Netzgebieten der deutschen Übertragungsnetz- betreiber (Regionenmodell Stromtransport 2013). Technical Report. Berlin, Germany.
    • Amperion GmbH, EnBW Transportnetze AG, Transpower stromübertragungs GmbH, Vattenfall Europe Transmission GmbH, 2009b. Übersicht über die voraussichtliche Entwicklung der installierten Kraftwerksleistung und der Leistungsflüsse in den Netzgebieten der deutschen Übertragungsnetz- betreiber (Regionenmodell Stromtransport 2013). Technical Report. Berlin, Germany.
    • (2009)
  • 7
    • 84880333714 scopus 로고    scopus 로고
    • BDEW, Anlage zur presseinformation 'strom-und gasverbrauch um vier prozent gestiegen' - 51 kraftwerke bis 2019 geplant. Available at:
    • BDEW, 2011a. Anlage zur presseinformation 'strom-und gasverbrauch um vier prozent gestiegen' - 51 kraftwerke bis 2019 geplant. Available at: http://www.bdew.de.
    • (2011)
  • 8
    • 84880329133 scopus 로고    scopus 로고
    • BDEW, Auswirkungen des Moratoriums auf die Elektrizitätswirtschaft. Technical Report. Berlin, Germany.
    • BDEW, 2011b. Auswirkungen des Moratoriums auf die Elektrizitätswirtschaft. Technical Report. Berlin, Germany.
    • (2011)
  • 9
    • 84880330073 scopus 로고    scopus 로고
    • BDEW, Press Release BDEW Analysis for March 2011: Development of electricity generation and exchanges-Considerable changes in terms of electricity imports and exports. Available at:
    • BDEW, 2011c. Press Release BDEW Analysis for March 2011: Development of electricity generation and exchanges-Considerable changes in terms of electricity imports and exports. Available at: http://www.bdew.de.
    • (2011)
  • 10
    • 65549125585 scopus 로고    scopus 로고
    • Nucs down in Germany-Prices up in Europe?
    • Bode S. Nucs down in Germany-Prices up in Europe?. Energy Policy 2009, 37:2492-2497.
    • (2009) Energy Policy , vol.37 , pp. 2492-2497
    • Bode, S.1
  • 11
    • 84880325774 scopus 로고    scopus 로고
    • Impact Of The German Nuclear Phase-Out On Europe's Electricity Generation-Model Description & Detailed Results. WP EN2013-01. Available at:
    • Bruninx, K., Madzharov, D., Delarue, E., D'haeseleer, W., 2012. Impact Of The German Nuclear Phase-Out On Europe's Electricity Generation-Model Description & Detailed Results. WP EN2013-01. Available at: http://www.mech.kuleuven.be/en/tme/research/energyenvironment/PublicationsEnergyandenvironment/Journalpapers.
    • (2012)
    • Bruninx, K.1    Madzharov, D.2    Delarue, E.3    D'haeseleer, W.4
  • 12
    • 84880332560 scopus 로고    scopus 로고
    • The Energiewende-Germany's Gamble. Available at:
    • Buchan, D., 2012. The Energiewende-Germany's Gamble. Available at: http://www.oxfordenergy.org/wpcms/wp-content/uploads/2012/06/SP-261.pdf.
    • (2012)
    • Buchan, D.1
  • 13
    • 84880324552 scopus 로고    scopus 로고
    • Bundesnetzagentur, Auswirkungen des Kernkraftwerk-Moratoriums auf die Übertragungsnetze und die Versorgungssicherheit. Technical Report. Berlin, Germany.
    • Bundesnetzagentur, 2011a. Auswirkungen des Kernkraftwerk-Moratoriums auf die Übertragungsnetze und die Versorgungssicherheit. Technical Report. Berlin, Germany.
    • (2011)
  • 14
    • 84880329651 scopus 로고    scopus 로고
    • Bundesnetzagentur, Auswirkungen des Kernkraftwerk-Moratoriums auf die Übertragungsnetze und die Versorgungssicherheit-Aktualisierung. Technical Report. Berlin, Germany.
    • Bundesnetzagentur, 2011b. Auswirkungen des Kernkraftwerk-Moratoriums auf die Übertragungsnetze und die Versorgungssicherheit-Aktualisierung. Technical Report. Berlin, Germany.
    • (2011)
  • 15
    • 84880330057 scopus 로고    scopus 로고
    • Bundesnetzagentur, Bericht zu den Auswirkungen des Kernkraftausstiegs auf die Übertragungsnetze und die Versorgungssicherheit zugleich Bericht zur Notwendigkeit eines Reservekernkraftwerks im Sinne der Neuregelungen des Atomgesetzes. Technical Report. Berlin, Germany.
    • Bundesnetzagentur, 2011c. Bericht zu den Auswirkungen des Kernkraftausstiegs auf die Übertragungsnetze und die Versorgungssicherheit zugleich Bericht zur Notwendigkeit eines Reservekernkraftwerks im Sinne der Neuregelungen des Atomgesetzes. Technical Report. Berlin, Germany.
    • (2011)
  • 16
    • 84880324795 scopus 로고    scopus 로고
    • Bundesnetzagentur, Informationen zur Genehmigung des Szenariorahmens. Technical Report. Berlin, Germany.
    • Bundesnetzagentur, 2011d. Informationen zur Genehmigung des Szenariorahmens. Technical Report. Berlin, Germany.
    • (2011)
  • 17
    • 84880329129 scopus 로고    scopus 로고
    • Consentec, Technische Untersuchung der Notwendigkeit eines Reserveatomkraftwerks vor dem Hintergrund der Neuregelungen im Atomgesetz. Technical Report. Berlin, Germany.
    • Consentec, 2011. Technische Untersuchung der Notwendigkeit eines Reserveatomkraftwerks vor dem Hintergrund der Neuregelungen im Atomgesetz. Technical Report. Berlin, Germany.
    • (2011)
  • 18
    • 84880326089 scopus 로고    scopus 로고
    • Modeling Electricity Generation Systems Generation Optimization and Simulation Models
    • KU Leuven.
    • Delarue, E., 2009. Modeling Electricity Generation Systems Generation Optimization and Simulation Models. Ph.D. Thesis, KU Leuven.
    • (2009) Ph.D. Thesis
    • Delarue, E.1
  • 19
    • 84880332200 scopus 로고    scopus 로고
    • Development of a comprehensive electricity generation simulation model using a mixed integer programming approach. In: Proceedings of the World Academy of Science, Engineering and Technology
    • Delarue, E., Bekaert, D., Belmans, R., William, D., 2007. Development of a comprehensive electricity generation simulation model using a mixed integer programming approach. In: Proceedings of the World Academy of Science, Engineering and Technology, pp. 92-97.
    • (2007) , pp. 92-97
    • Delarue, E.1    Bekaert, D.2    Belmans, R.3    William, D.4
  • 20
    • 84880332439 scopus 로고    scopus 로고
    • Deutsche Energie-Agentur, Dena Grid Study II-Integration of Renewable Energy Sources in the German Power Supply System from 2015-2020 with an Outlook to 2025. Technical Report. Berlin, Germany.
    • Deutsche Energie-Agentur, 2010. Dena Grid Study II-Integration of Renewable Energy Sources in the German Power Supply System from 2015-2020 with an Outlook to 2025. Technical Report. Berlin, Germany.
    • (2010)
  • 21
    • 84880324755 scopus 로고    scopus 로고
    • Deutsches Atomforum e.V., Kernkraftwerke in Deutschland: Betriebsergebnisse Available at:
    • Deutsches Atomforum e.V., 2010. Kernkraftwerke in Deutschland: Betriebsergebnisse 2010. Available at: http://www.kernenergie.de/kernenergie-wAssets/docs/service/604atw-betriebsergebnisse-kkw2010.pdf.
    • (2010)
  • 22
    • 79957873472 scopus 로고    scopus 로고
    • Deutsches Atomforum e.V., Kernenergie Weltreport 2010. ATW 4, 281-286.
    • Deutsches Atomforum e.V., 2011. Kernenergie Weltreport 2010. ATW 4, 281-286.
    • (2011)
  • 23
    • 84880328209 scopus 로고    scopus 로고
    • DLR, Fraunhofer IWES, IfnE, 2010. Langfristszenarien und Strategien für den Ausbau der erneuerbaren Energien in Deutschland bei Berücksichtigung der Entwicklung in Europa und global: Leitstudie 2010. Technical Report. Berlin, Germany.
    • DLR, Fraunhofer IWES, IfnE, 2010. Langfristszenarien und Strategien für den Ausbau der erneuerbaren Energien in Deutschland bei Berücksichtigung der Entwicklung in Europa und global: Leitstudie 2010. Technical Report. Berlin, Germany.
  • 24
    • 84880330759 scopus 로고    scopus 로고
    • EnBW Transportnetze AG, EnBW Transportnetze AG.
    • EnBW Transportnetze AG, 2012. EnBW Transportnetze AG.
    • (2012)
  • 25
    • 84880330333 scopus 로고    scopus 로고
    • ENFE, Germany's Nuclear Phase-out by 2022: Plenty of Open Questions Remain. Online:
    • ENFE, 2011. Germany's Nuclear Phase-out by 2022: Plenty of Open Questions Remain. Online: http://www.efne.eu/en/news/news-details/article/germanys.html.
    • (2011)
  • 26
    • 84880327750 scopus 로고    scopus 로고
    • ENTSO-E. An Overview of System Adequacy: Winter Outlook Report 2011/2012 and Summer Review 2011. Technical Report. Brussels, Belgium.
    • ENTSO-E, 2011. An Overview of System Adequacy: Winter Outlook Report 2011/2012 and Summer Review 2011. Technical Report. Brussels, Belgium.
    • (2011)
  • 27
    • 84880328786 scopus 로고    scopus 로고
    • ENTSO-E, ENTSO-E Data Portal. Available at:
    • ENTSO-E, 2012. ENTSO-E Data Portal. Available at: https://www.entsoe.eu/resources/data-portal/.
    • (2012)
  • 28
    • 84880327654 scopus 로고    scopus 로고
    • Eurelectric, Power Statistics. Technical Report. Brussels, Belgium.
    • Eurelectric, 2010. Power Statistics. Technical Report. Brussels, Belgium.
    • (2010)
  • 29
    • 84880333929 scopus 로고    scopus 로고
    • EWI, EEFA, 2008. Studie Energiewirtschaftliches Gesamtkonzept 2030. Technical Report. Köln, Germany.
    • EWI, EEFA, 2008. Studie Energiewirtschaftliches Gesamtkonzept 2030. Technical Report. Köln, Germany.
    • (2010)
  • 30
    • 84880326381 scopus 로고    scopus 로고
    • GDXMRW: Interfacing GAMS and MATLAB. Available at:
    • Ferris, M.C., Jain, R., Dirkse, S., 2011. GDXMRW: Interfacing GAMS and MATLAB. Available at: http://www.gams.com/dd/docs/tools/gdxmrw.pdf.
    • (2011)
    • Ferris, M.C.1    Jain, R.2    Dirkse, S.3
  • 31
    • 84880324429 scopus 로고    scopus 로고
    • German Nuclear Policy Reconsidered: Implications for the Electricity Market. EUI Working Papers, no 11/12. Available at:
    • Fürsch, M., Malischek, R., Trüby, J., 2012. German Nuclear Policy Reconsidered: Implications for the Electricity Market. EUI Working Papers, no 11/12. Available at: http://www.ewi.uni-koeln.de/fileadmin/userupload/Publikationen/WorkingPaper/EWIWP11-12Germannuclearpolicyreconsidered.pdf.
    • (2012)
    • Fürsch, M.1    Malischek, R.2    Trüby, J.3
  • 32
    • 84861223486 scopus 로고    scopus 로고
    • A method for estimating security of electricity supply from intermittent sources: scenarios for Germany until 2030
    • Grave K., Paulus M., Lindenberger D. A method for estimating security of electricity supply from intermittent sources: scenarios for Germany until 2030. Energy Policy 2012, 46:193-202.
    • (2012) Energy Policy , vol.46 , pp. 193-202
    • Grave, K.1    Paulus, M.2    Lindenberger, D.3
  • 33
    • 84880329876 scopus 로고    scopus 로고
    • Greenpeace, Nuclear Phaseout by 2015 is Possible. Technical Report. Hamburg, Germany.
    • Greenpeace, 2011. Nuclear Phaseout by 2015 is Possible. Technical Report. Hamburg, Germany.
    • (2011)
  • 34
    • 0032077746 scopus 로고    scopus 로고
    • Impact of a nuclear phase-out in Germany. results form a simulation model of the European Power Systems
    • Hoster F. Impact of a nuclear phase-out in Germany. results form a simulation model of the European Power Systems. Energy Policy 1998, 26:507-518.
    • (1998) Energy Policy , vol.26 , pp. 507-518
    • Hoster, F.1
  • 35
    • 84880327238 scopus 로고    scopus 로고
    • IER, RWI, ZEW, Die Entwicklung der Energiemärkte bis 2030-Energieprognose 2009. Technical Report. Bundesministeriums für Wirtschaft und Technologie (BMWi). Berlin, Germany.
    • IER, RWI, ZEW, 2010. Die Entwicklung der Energiemärkte bis 2030-Energieprognose 2009. Technical Report. Bundesministeriums für Wirtschaft und Technologie (BMWi). Berlin, Germany.
    • (2010)
  • 36
    • 84880325710 scopus 로고    scopus 로고
    • Congestion Management in Germany-The Impact of Renewable Generation on Congestion Management Costs. Available at:
    • Kunz, F., 2011. Congestion Management in Germany-The Impact of Renewable Generation on Congestion Management Costs. Available at: http://idei.fr/doc/conf/eem/papers2011/kunz.pdf.
    • (2011)
    • Kunz, F.1
  • 37
    • 84880330458 scopus 로고    scopus 로고
    • Security of Supply and Electricity Network Flows after a Phase-Out of Germany's Nuclear Plants: Any Trouble Ahead? EUI Working Papers. Available at:
    • Kunz, F., Hirschhausen, C.V., Möst, D., Weigt, H., 2011. Security of Supply and Electricity Network Flows after a Phase-Out of Germany's Nuclear Plants: Any Trouble Ahead? EUI Working Papers. Available at: http://cadmus.eui.eu/handle/1814/17834.
    • (2011)
    • Kunz, F.1    Hirschhausen, C.V.2    Möst, D.3    Weigt, H.4
  • 38
    • 84880330301 scopus 로고    scopus 로고
    • ELMOD-A Model of the European Electricity Market. Electricity Markets Working Papers. Available at:
    • Leuthold, F., Weigt, H., Von Hirschhausen, C., 2008. ELMOD-A Model of the European Electricity Market. Electricity Markets Working Papers. Available at: http://www.hannesweigt.de/paper/wpem00ELMOD.pdf.
    • (2008)
    • Leuthold, F.1    Weigt, H.2    Von Hirschhausen, C.3
  • 39
    • 84880330159 scopus 로고    scopus 로고
    • Atomstrom aus Frankreich? Kurzfristige Abschaltungen deutscher Kernkraftwerke und die Entwicklung des Strom- Austauschs mit dem Ausland Kurzanalyse für die Umweltstiftung WWF Deutschland. Technical Report. Öko-Institut e.V. Freiburg/Berlin, Germany.
    • Matthes, F.C., Harthan, R.O., Loreck, C., 2011a. Atomstrom aus Frankreich? Kurzfristige Abschaltungen deutscher Kernkraftwerke und die Entwicklung des Strom- Austauschs mit dem Ausland Kurzanalyse für die Umweltstiftung WWF Deutschland. Technical Report. Öko-Institut e.V. Freiburg/Berlin, Germany.
    • (2011)
    • Matthes, F.C.1    Harthan, R.O.2    Loreck, C.3
  • 40
    • 84880327400 scopus 로고    scopus 로고
    • Schneller Ausstieg aus der Kernenergie in Deutschland Kurzfristige Ersatzoptionen, Strom- und CO2 -Preiseffekte Kurzanalyse für die Umweltstiftung WWF Deutschland. Technical Report. Öko-Institut e.V. Freiburg/Berlin, Germany.
    • Matthes, F.C., Harthan, R.O., Loreck, C., 2011b. Schneller Ausstieg aus der Kernenergie in Deutschland Kurzfristige Ersatzoptionen, Strom- und CO2 -Preiseffekte Kurzanalyse für die Umweltstiftung WWF Deutschland. Technical Report. Öko-Institut e.V. Freiburg/Berlin, Germany.
    • (2011)
    • Matthes, F.C.1    Harthan, R.O.2    Loreck, C.3
  • 41
    • 80052840340 scopus 로고    scopus 로고
    • Energy policy scenarios to reach challenging climate protection targets in the German electricity sector until 2050
    • Nagl S., Fürsch M., Paulus M., Richter J., Trüby J., Lindenberger D. Energy policy scenarios to reach challenging climate protection targets in the German electricity sector until 2050. Utilities Policy 2011, 19:185-192.
    • (2011) Utilities Policy , vol.19 , pp. 185-192
    • Nagl, S.1    Fürsch, M.2    Paulus, M.3    Richter, J.4    Trüby, J.5    Lindenberger, D.6
  • 42
    • 84855974846 scopus 로고    scopus 로고
    • Does the use of nuclear power lead to lower electricity prices? An analysis of the debate in Germany with an international perspective
    • Nestle U. Does the use of nuclear power lead to lower electricity prices? An analysis of the debate in Germany with an international perspective. Energy Policy 2012, 41:152-160.
    • (2012) Energy Policy , vol.41 , pp. 152-160
    • Nestle, U.1
  • 43
    • 84880329949 scopus 로고    scopus 로고
    • Das Grüne Energiewend-Szenario 2020. Technical Report. Darmstadt/Freiburg/Berlin, Germany.
    • Öko-Institut E.V., 1996. Das Grüne Energiewend-Szenario 2020. Technical Report. Darmstadt/Freiburg/Berlin, Germany.
    • (1996)
    • Öko-Institut, E.V.1
  • 44
    • 84880324753 scopus 로고    scopus 로고
    • Ausstieg aus der Kernenergie-und was kommt danach? Technical Report. Alfred Herrhausen Gesellschaft für internationalen Dialog. Frankfurt/München, Germany.
    • Pfaffenberger, W., 1999. Ausstieg aus der Kernenergie-und was kommt danach? Technical Report. Alfred Herrhausen Gesellschaft für internationalen Dialog. Frankfurt/München, Germany.
    • (1999)
    • Pfaffenberger, W.1
  • 45
    • 84880332787 scopus 로고    scopus 로고
    • Das Energiewirtschaftliche Gesamtkonzept
    • München, Germany.
    • Prognos, AG, 2010. Das Energiewirtschaftliche Gesamtkonzept. Technical Report. München, Germany.
    • (2010) Technical Report
    • Prognos, A.G.1
  • 46
    • 84880326842 scopus 로고    scopus 로고
    • Das Energiewirtschaftliche Gesamtkonzept Konsequenzen eines beschleunigten Ausstiegs. Technical Report.
    • Prognos, A.G., 2011a. Das Energiewirtschaftliche Gesamtkonzept Konsequenzen eines beschleunigten Ausstiegs. Technical Report.
    • (2011)
    • Prognos, A.G.1
  • 47
    • 84866785493 scopus 로고    scopus 로고
    • Konsequenzen eines Ausstiegs aus der Kernenergie bis 2022 für Deutschland und Bayern
    • Prognos, A.G., 2011b. Konsequenzen eines Ausstiegs aus der Kernenergie bis 2022 für Deutschland und Bayern. Technical Report.
    • (2011) Technical Report
    • Prognos, A.G.1
  • 48
    • 84880327463 scopus 로고    scopus 로고
    • EWI, Energieszenarien für den Energiegipfel 2007. Technical Report.
    • Prognos, A.G., EWI, 2007. Energieszenarien für den Energiegipfel 2007. Technical Report.
    • (2007)
    • Prognos, A.G.1
  • 49
    • 84937328714 scopus 로고    scopus 로고
    • Phasing out nuclear energy in Germany
    • Rüdig W. Phasing out nuclear energy in Germany. German Politics 2000, 9:43-80.
    • (2000) German Politics , vol.9 , pp. 43-80
    • Rüdig, W.1
  • 50
    • 33749989779 scopus 로고    scopus 로고
    • Innovative energy technologies and climate policy in Germany
    • Schumacher K., Sands R.D. Innovative energy technologies and climate policy in Germany. Energy Policy 2006, 34:3929-3941.
    • (2006) Energy Policy , vol.34 , pp. 3929-3941
    • Schumacher, K.1    Sands, R.D.2
  • 51
    • 84880328542 scopus 로고    scopus 로고
    • Tennet TSO GmbH, Tennet TSO GmbH. Available at:
    • Tennet TSO GmbH, 2012. Tennet TSO GmbH. Available at: http://www.tennettso.de.
    • (2012)
  • 52
    • 84880333926 scopus 로고    scopus 로고
    • German Nuclear Phase-out Policy-Effects on European Electricity Wholesale Prices, Emission Prices, Conventional Power Plant Investments and Electricity Trade. EWI Discussion Papers 1219. Available at:
    • Traber, T., Kemfert, C., 2012. German Nuclear Phase-out Policy-Effects on European Electricity Wholesale Prices, Emission Prices, Conventional Power Plant Investments and Electricity Trade. EWI Discussion Papers 1219. Available at: http://www.diw.de/documents/publikationen/73/diw01.c.405142.de/dp1219.pdf.
    • (2012)
    • Traber, T.1    Kemfert, C.2
  • 53
    • 84880333576 scopus 로고    scopus 로고
    • Umweltbundesamt, Datenbank "Kraftwerke in Deutschland". Technical Report. Dessau-Roßlau/Berlin, Germany.
    • Umweltbundesamt, 2011a. Datenbank "Kraftwerke in Deutschland". Technical Report. Dessau-Roßlau/Berlin, Germany.
    • (2011)
  • 54
    • 84880327329 scopus 로고    scopus 로고
    • Umweltbundesamt, Restructuring Electricity Supply. Technical Report. Dessau-Roßlau/Berlin, Germany.
    • Umweltbundesamt, 2011b. Restructuring Electricity Supply. Technical Report. Dessau-Roßlau/Berlin, Germany.
    • (2011)
  • 55
    • 84880325405 scopus 로고    scopus 로고
    • Germany's Nuclear Phase-Out Causes no Supply Security Concerns, But Indicates Need for Region-Wide Cooperation. Available at: (1/10/2011).
    • Von Hirschhausen, C., 2011. Germany's Nuclear Phase-Out Causes no Supply Security Concerns, But Indicates Need for Region-Wide Cooperation. Available at: (1/10/2011). http://www.energypolicyblog.com.
    • (2011)
    • Von Hirschhausen, C.1
  • 56
    • 0032052425 scopus 로고    scopus 로고
    • Coal subsidization and nuclear phase-out in a general equilibrium model for Germany
    • Welsch H. Coal subsidization and nuclear phase-out in a general equilibrium model for Germany. Energy Economics 1998, 20:203-222.
    • (1998) Energy Economics , vol.20 , pp. 203-222
    • Welsch, H.1
  • 57
    • 0034745451 scopus 로고    scopus 로고
    • Dismantling of nuclear power in Germany. sectoral and macroeconomic effects
    • Welsch H., Ochsen C. Dismantling of nuclear power in Germany. sectoral and macroeconomic effects. Energy Policy 2001, 29:279-289.
    • (2001) Energy Policy , vol.29 , pp. 279-289
    • Welsch, H.1    Ochsen, C.2
  • 58
    • 84880327240 scopus 로고    scopus 로고
    • Linking Matlab and GAMS: A Supplement. Available at:
    • Wong, L., 2009. Linking Matlab and GAMS: A Supplement. Available at: https://web.uvic.ca/~repa/publications/REPA%20working%20papers/WorkingPaper2009-03.pdf.
    • (2009)
    • Wong, L.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.