-
1
-
-
34249883987
-
Maintenance priority assignment utilizing on-line production information
-
Z. Yang, Q. Chang, D. Djurdjanovic, J. Ni, and J. Lee Maintenance priority assignment utilizing on-line production information Journal of Manufacturing Science and Engineering 129 2007 435
-
(2007)
Journal of Manufacturing Science and Engineering
, vol.129
, pp. 435
-
-
Yang, Z.1
Chang, Q.2
Djurdjanovic, D.3
Ni, J.4
Lee, J.5
-
6
-
-
79960078275
-
The use of analytical hierarchy process in priority rating of pavement maintenance
-
D. Moazami, R. Muniandy, H. Hamid, and Z.M. Yusoff The use of analytical hierarchy process in priority rating of pavement maintenance Scientific Research and Essays 6 2011 2447 2456
-
(2011)
Scientific Research and Essays
, vol.6
, pp. 2447-2456
-
-
Moazami, D.1
Muniandy, R.2
Hamid, H.3
Yusoff, Z.M.4
-
7
-
-
0347968133
-
A cost-effective approach of prioritizing distribution maintenance based on system reliability
-
F.X. Li, and R.E. Brown A cost-effective approach of prioritizing distribution maintenance based on system reliability IEEE Transactions on Power Deliver 19 2004 439 441
-
(2004)
IEEE Transactions on Power Deliver
, vol.19
, pp. 439-441
-
-
Li, F.X.1
Brown, R.E.2
-
10
-
-
34547416651
-
Maintenance opportunity planning system
-
Q. Chang, J. Ni, P. Bandyopadhyay, S. Biller, and G. Xiao Maintenance opportunity planning system Journal of Manufacturing Science and Engineering 129 2007 661
-
(2007)
Journal of Manufacturing Science and Engineering
, vol.129
, pp. 661
-
-
Chang, Q.1
Ni, J.2
Bandyopadhyay, P.3
Biller, S.4
Xiao, G.5
-
11
-
-
34547689494
-
Maintenance staffing management
-
Q. Chang, J. Ni, P. Bandyopadhyay, S. Biller, and G.X. Xiao Maintenance staffing management Journal of Intelligent Manufacturing 18 2007 351 360
-
(2007)
Journal of Intelligent Manufacturing
, vol.18
, pp. 351-360
-
-
Chang, Q.1
Ni, J.2
Bandyopadhyay, P.3
Biller, S.4
Xiao, G.X.5
-
14
-
-
84858333096
-
A complexity model for sequence planning in mixed-model assembly lines
-
X. Zhu, S.J. Hu, Y. Koren, and N. Huang A complexity model for sequence planning in mixed-model assembly lines Journal of Manufacturing Systems 31 2012 121 130
-
(2012)
Journal of Manufacturing Systems
, vol.31
, pp. 121-130
-
-
Zhu, X.1
Hu, S.J.2
Koren, Y.3
Huang, N.4
-
15
-
-
79955905594
-
Multi-objective optimization of product variety and manufacturing complexity in mixed-model assembly systems
-
H. Wang, X. Zhu, H. Wang, S.J. Hu, Z. Lin, and G. Chen Multi-objective optimization of product variety and manufacturing complexity in mixed-model assembly systems Journal of Manufacturing Systems 30 2011 16 27
-
(2011)
Journal of Manufacturing Systems
, vol.30
, pp. 16-27
-
-
Wang, H.1
Zhu, X.2
Wang, H.3
Hu, S.J.4
Lin, Z.5
Chen, G.6
-
16
-
-
46149112187
-
Balancing of manufacturing systems with complex configurations for delayed product differentiation
-
J. Ko, and S. Jack Hu Balancing of manufacturing systems with complex configurations for delayed product differentiation International Journal of Production Research 46 2008 4285 4308
-
(2008)
International Journal of Production Research
, vol.46
, pp. 4285-4308
-
-
Ko, J.1
Jack Hu, S.2
-
18
-
-
0037118559
-
A survey of maintenance policies of deteriorating systems
-
H. Wang A survey of maintenance policies of deteriorating systems European Journal of Operational Research 139 2002 469 489
-
(2002)
European Journal of Operational Research
, vol.139
, pp. 469-489
-
-
Wang, H.1
-
22
-
-
33748562480
-
Determination of sample size in using central limit theorem for Weibull distribution
-
H.-J. Chang, and K.-C. Huang Determination of sample size in using central limit theorem for Weibull distribution Information and Management Sciences 17 2006 31 46
-
(2006)
Information and Management Sciences
, vol.17
, pp. 31-46
-
-
Chang, H.-J.1
Huang, K.-C.2
|