Volumn 25, Issue 3, 2013, Pages 343-366

Scheduling unrelated parallel machines in semiconductor manufacturing by problem reduction and local search heuristics

Author keywords

Dispatching rule; Local search; Mixed integer programming; Scheduling

Indexed keywords

DISPATCHING RULES; LARGE-SCALE SCHEDULING PROBLEMS; LOCAL SEARCH; MIXED INTEGER PROGRAMMING; MIXED INTEGER PROGRAMMING (MIP); SEMICONDUCTOR MANUFACTURING; SEMICONDUCTOR MANUFACTURING PROCESS; SEQUENCE-DEPENDENT SETUP TIME;

EID: 84879008848     PISSN: 19366582     EISSN: 19366590     Source Type: Journal    
DOI: 10.1007/s10696-012-9150-7     Document Type: Article
Times cited : (32)

References (24)
  • 1
    • 34748854807 scopus 로고    scopus 로고
    • A new dispatching rule for optimizing machine utilization at a semiconductor test field
    • Altendorfer K, Kabelka B, Stöher W (2007) A new dispatching rule for optimizing machine utilization at a semiconductor test field. In: Advance semiconductor manufacturing conference IEEE/SEMI, pp 188-193
    • (2007) Advance Semiconductor Manufacturing Conference IEEE/SEMI , pp. 188-193
    • Altendorfer K, K.1
  • 2
    • 0032182879 scopus 로고    scopus 로고
    • Dispatching in a workstation belonging to a re-entrant production line under sequence-dependent set-up times
    • Arzi Y, Raviv D (1998) Dispatching in a workstation belonging to a re-entrant production line under sequence-dependent set-up times. Prod Plan Control 9:690-699 (Pubitemid 128624361)
    • (1998) Production Planning and Control , vol.9 , Issue.7 , pp. 690-699
    • Arzi, Y.1    Raviv, D.2
  • 3
    • 0033079828 scopus 로고    scopus 로고
    • Early/tardy scheduling with sequence dependent setups on uniform parallel machines
    • DOI 10.1016/S0305-0548(98)00051-3, PII S0305054898000513
    • Balakrishnan N, Kanet JJ, Sridharan SV (1999) Early/Tardy scheduling with sequence dependent setups on uniform parallel machines. Comput Oper Res 26:127-141 (Pubitemid 29346480)
    • (1999) Computers and Operations Research , vol.26 , Issue.2 , pp. 127-141
    • Balakrishnan, N.1    Kanet, J.J.2    Sridharan, S.V.3
  • 4
    • 0035145661 scopus 로고    scopus 로고
    • Heuristic algorithms for unrelated parallel machine scheduling with a common due date, release dates, and linear earliness and tardiness penalties
    • DOI 10.1016/S0895-7177(00)00250-8, PII S0895717700002508
    • Bank J, Werner F (2001) Heuristic algorithms for unrelated parallel-machine scheduling with a common due date, release dates, and linear earliness and tardiness penalties. Math Comput Model 33:363-383 (Pubitemid 32122694)
    • (2001) Mathematical and Computer Modelling , vol.33 , Issue.4-5 , pp. 363-383
    • Bank, J.1    Werner, F.2
  • 5
    • 0347092029 scopus 로고    scopus 로고
    • A tabu search algorithm for parallel machine total tardiness problem
    • DOI 10.1016/S0305-0548(02)00198-3
    • Bilge Ü, KIrac F, Kurtulan M, Pekgün P (2004) A Tabu search algorithm for parallel machine total tardiness problem. Comput Oper Res 31:397-414 (Pubitemid 38092934)
    • (2004) Computers and Operations Research , vol.31 , Issue.3 , pp. 397-414
    • Bilge, U.1    Kirac, F.2    Kurtulan, M.3    Pekgun, P.4
  • 6
    • 33751413051 scopus 로고    scopus 로고
    • Short-interval detailed production scheduling in 300mm semiconductor manufacturing using mixed integer and constraint programming
    • DOI 10.1109/ASMC.2006.1638740, 1638740, 17th Annual SEMI/IEEE Advanced Semiconductor Manufacturing Conference, ASMC 2006
    • Bixby R, Burda R, Miller D (2006) Short-interval detailed production scheduling in 300 mm semiconductor manufacturing using mixed integer and constraint programming. In: Advance semiconductor manufacturing conference IEEE/SEMI, pp 148-154 (Pubitemid 44815897)
    • (2006) ASMC (Advanced Semiconductor Manufacturing Conference) Proceedings , vol.2006 , pp. 148-154
    • Bixby, R.1    Burda, R.2    Miller, D.3
  • 7
    • 0020013653 scopus 로고
    • A state-of-the-art survey of dispatching rules for manufacturing job shop operations
    • 10.1080/00207548208947745
    • Blackstone JH, Phillips DT, Hogg GL (1982) A state-of-the-art survey of dispatching rules for manufacturing job shop operations. Int J Prod Res 20:27-45
    • (1982) Int J Prod Res , vol.20 , pp. 27-45
    • Blackstone, J.H.1    Phillips, D.T.2    Hogg, G.L.3
  • 8
    • 0042887637 scopus 로고    scopus 로고
    • A new scheduling approach using combined dispatching criteria in wafer fabs
    • Dabbas R, Fowler JW (2003) A new scheduling approach using combined dispatching criteria in wafer fabs. IEEE Trans Semicond Manuf 16(3):501-510
    • (2003) IEEE Trans Semicond Manuf , vol.16 , Issue.3 , pp. 501-510
    • Dabbas, R.1    Fowler, J.W.2
  • 9
    • 34249973653 scopus 로고    scopus 로고
    • A survey of priority rule-based scheduling
    • 983795
    • Haupt R (1999) A survey of priority rule-based scheduling. OR Spectr 11:3-16
    • (1999) OR Spectr , vol.11 , pp. 3-16
    • Haupt, R.1
  • 10
    • 0031270468 scopus 로고    scopus 로고
    • Scheduling semiconductor burn-in operations to minimize total flowtime
    • Hochbaum DS, Landy D (1997) Scheduling semiconductor burn-in operations to minimize total flowtime. Oper Res 45:874-885 (Pubitemid 127684768)
    • (1997) Operations Research , vol.45 , Issue.6 , pp. 874-885
    • Hochbaum, D.S.1    Landy, D.2
  • 11
    • 77955891941 scopus 로고    scopus 로고
    • Coordinated multistage scheduling of parallel batch-processing machines under multiresource constraints
    • 2683485 1231.90200 10.1287/opre.1090.0788
    • Jula P, Leachman RC (2010) Coordinated multistage scheduling of parallel batch-processing machines under multiresource constraints. Oper Res 58:933-947
    • (2010) Oper Res , vol.58 , pp. 933-947
    • Jula, P.1    Leachman, R.C.2
  • 12
    • 0142216509 scopus 로고    scopus 로고
    • Scheduling jobs on parallel machines: A restricted Tabu search approach
    • 10.1007/s00170-002-1472-2
    • Kim CO, Shin HJ (2003) Scheduling jobs on parallel machines: a restricted Tabu search approach. Int J Adv Manuf Technol 22:278-287
    • (2003) Int J Adv Manuf Technol , vol.22 , pp. 278-287
    • Kim, C.O.1    Shin, H.J.2
  • 13
    • 0031705292 scopus 로고    scopus 로고
    • A simulation study on lot release control, mask scheduling, and batch scheduling in semiconductor wafer fabrication facilities
    • 10.1016/S0278-6125(98)80024-1
    • Kim YD, Lee DH, Kim JU (1998) A simulation study on lot release control, mask scheduling, and batch scheduling in semiconductor wafer fabrication facilities. J Manuf Syst 17:107-117
    • (1998) J Manuf Syst , vol.17 , pp. 107-117
    • Kim, Y.D.1    Lee, D.H.2    Kim, J.U.3
  • 14
    • 0346152771 scopus 로고    scopus 로고
    • A due date density-based categorising heuristic for parallel machines scheduling
    • 10.1007/s00170-003-1611-4
    • Kim SS, Shin HJ, Eom DH, Kim CO (2003) A due date density-based categorising heuristic for parallel machines scheduling. Int J Adv Manuf Technol 22:753-760
    • (2003) Int J Adv Manuf Technol , vol.22 , pp. 753-760
    • Kim, S.S.1    Shin, H.J.2    Eom, D.H.3    Kim, C.O.4
  • 15
    • 0035841877 scopus 로고    scopus 로고
    • Heuristic scheduling of parallel machines with sequence-dependent set-up times
    • DOI 10.1080/00207540110064938
    • Kurz ME, Askin RG (2001) Heuristic scheduling of parallel machines with sequence-dependent set-up times. Int J Prod Res 39:3747-3769 (Pubitemid 35165511)
    • (2001) International Journal of Production Research , vol.39 , Issue.16 , pp. 3747-3769
    • Kurz, M.E.1    Askin, R.G.2
  • 16
    • 0030735290 scopus 로고    scopus 로고
    • A heuristic to minimize the total weighted tardiness with sequence-dependent setups
    • Lee YH, Bhaskaran K, Pinedo M (1997) A heuristic to minimize the total weighted tardiness with sequence dependent setups. IIE Trans 29:45-52 (Pubitemid 127754351)
    • (1997) IIE Transactions (Institute of Industrial Engineers) , vol.29 , Issue.1 , pp. 45-52
    • Lee, Y.H.1
  • 17
    • 0036468738 scopus 로고    scopus 로고
    • Experimental study on input and bottleneck scheduling for a semiconductor fabrication line
    • DOI 10.1023/A:1011948031373, Scheduling and Logistics on Semiconductor Manufacturing
    • Lee YH, Park JK, Kim SY (2002) Experimental study on input and bottleneck scheduling for a semiconductor fabrication line. IIE Trans 34:179-190 (Pubitemid 34138509)
    • (2002) IIE Transactions (Institute of Industrial Engineers) , vol.34 , Issue.2 , pp. 179-190
    • Lee, Y.H.1    Park, J.2    Kim, S.3
  • 18
    • 34047130624 scopus 로고    scopus 로고
    • Scheduling unrelated parallel machines with sequence-dependent setups
    • DOI 10.1016/j.cor.2006.02.006, PII S0305054806000438
    • Logendran R, McDonell B, Smucker B (2007) Scheduling unrelated parallel machines with sequence-dependent setups. Comput Oper Res 34:3420-3438 (Pubitemid 46517865)
    • (2007) Computers and Operations Research , vol.34 , Issue.11 , pp. 3420-3438
    • Logendran, R.1    McDonell, B.2    Smucker, B.3
  • 19
    • 0029404198 scopus 로고
    • Rolling horizon procedures for dynamic parallel machine scheduling with sequence-dependent setup times
    • 0911.90217 10.1080/00207549508904867
    • Ovacik IM, Uzsoy R (1995) Rolling horizon procedures for dynamic parallel machine scheduling with sequence-dependent setup times. Int J Prod Res 33:3173-3192
    • (1995) Int J Prod Res , vol.33 , pp. 3173-3192
    • Ovacik, I.M.1    Uzsoy, R.2
  • 21
    • 0001518839 scopus 로고    scopus 로고
    • List scheduling revisited
    • DOI 10.1016/0167-6377(95)00057-7
    • Schutten JMJ (1996) List scheduling revisited. Oper Res Lett 18:167-170 (Pubitemid 126398840)
    • (1996) Operations Research Letters , vol.18 , Issue.4 , pp. 167-170
    • Schutten, J.M.J.1
  • 22
    • 0033166361 scopus 로고    scopus 로고
    • Parallel machine scheduling with earliness and tardiness penalties
    • DOI 10.1016/S0305-0548(98)00090-2, PII S0305054898000902
    • Sivrikaya-Serifoglu F, Ulusoy G (1999) Parallel machine scheduling with earliness and tardiness penalties. Comput Oper Res 26:773-787 (Pubitemid 29351336)
    • (1999) Computers and Operations Research , vol.26 , Issue.8 , pp. 773-787
    • Sivrikaya-Srifoglu, F.1    Ulusoy, G.2
  • 23
    • 27744506367 scopus 로고    scopus 로고
    • Heuristic scheduling algorithm for flexible manufacturing systems with partially overlapping machine capabilities
    • IEEE International Conference on Mechatronics and Automation, ICMA 2005
    • Wang C, Ghenniwa H, Shen W (2005) Heuristic scheduling algorithm for flexible manufacturing systems with partially overlapping machine capabilities. Mechatron Autom IEEE Int Conf 3:1139-1144 (Pubitemid 41585565)
    • (2005) IEEE International Conference on Mechatronics and Automation, ICMA 2005 , pp. 1139-1144
    • Wang, C.1    Ghenniwa, H.2    Shen, W.3
  • 24
    • 33748492325 scopus 로고    scopus 로고
    • Scheduling and lot sizing with sequence-dependent setup: A literature review
    • DOI 10.1080/07408170600559706, PII J784373L461611VQ
    • Zhu X, Wilhelm WE (2006) Scheduling and lot sizing with sequence-dependent setup: a literature review. IIE Trans 38:987-1007 (Pubitemid 44355862)
    • (2006) IIE Transactions (Institute of Industrial Engineers) , vol.38 , Issue.11 , pp. 987-1007
    • Zhu, X.1    Wilhelm, W.E.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.