메뉴 건너뛰기




Volumn 21, Issue 2, 2013, Pages 355-377

Using and extending fix-and-relax to solve maritime inventory routing problems

Author keywords

Fix and relax; Liquefied natural gas (LNG); Maritime inventory routing problem (IRP); Time decomposition heuristic

Indexed keywords


EID: 84878959111     PISSN: 11345764     EISSN: 18638279     Source Type: Journal    
DOI: 10.1007/s11750-011-0174-z     Document Type: Article
Times cited : (49)

References (46)
  • 1
    • 34547356612 scopus 로고    scopus 로고
    • MIP-based heuristics for multi-item capacitated lot-sizing problem with setup times and shortage costs
    • Absi N, Kedad-Sidhoum S (2007) MIP-based heuristics for multi-item capacitated lot-sizing problem with setup times and shortage costs. RAIRO Oper Res 41: 171-192.
    • (2007) RAIRO Oper Res , vol.41 , pp. 171-192
    • Absi, N.1    Kedad-Sidhoum, S.2
  • 2
    • 53049101103 scopus 로고    scopus 로고
    • A heuristic approach for big bucket multi-level production planning problems
    • Akartunali K, Miller A (2009) A heuristic approach for big bucket multi-level production planning problems. Eur J Oper Res 193: 396-411.
    • (2009) Eur J Oper Res , vol.193 , pp. 396-411
    • Akartunali, K.1    Miller, A.2
  • 3
    • 41449097243 scopus 로고    scopus 로고
    • Optimization of vendor-managed inventory systems in a rolling horizon framework
    • Al-Ameri TA, Shah N, Papageorgiou LG (2008) Optimization of vendor-managed inventory systems in a rolling horizon framework. Comput Ind Eng 54: 1019-1047.
    • (2008) Comput Ind Eng , vol.54 , pp. 1019-1047
    • Al-Ameri, T.A.1    Shah, N.2    Papageorgiou, L.G.3
  • 4
    • 33748959314 scopus 로고    scopus 로고
    • Inventory constrained maritime routing and scheduling for multi-commodity liquid bulk, part I: applications and model
    • Al-Khayal F, Hwang SJ (2007) Inventory constrained maritime routing and scheduling for multi-commodity liquid bulk, part I: applications and model. Eur J Oper Res 176: 106-130.
    • (2007) Eur J Oper Res , vol.176 , pp. 106-130
    • Al-Khayal, F.1    Hwang, S.J.2
  • 5
    • 0006778493 scopus 로고    scopus 로고
    • A stochastic 0-1 program based approach for the air traffic flow management problem
    • Alonso A, Escudero LF, Ortuno MT (2000) A stochastic 0-1 program based approach for the air traffic flow management problem. Eur J Oper Res 120: 47-62.
    • (2000) Eur J Oper Res , vol.120 , pp. 47-62
    • Alonso, A.1    Escudero, L.F.2    Ortuno, M.T.3
  • 6
    • 58149516441 scopus 로고    scopus 로고
    • On SIP algorithms for minimizing the mean-risk function in the multi-period single-source problem under uncertainty
    • Alonso-Ayuso A, Escudero LF, Pizarro C (2009) On SIP algorithms for minimizing the mean-risk function in the multi-period single-source problem under uncertainty. Ann Oper Res 166: 223-242.
    • (2009) Ann Oper Res , vol.166 , pp. 223-242
    • Alonso-Ayuso, A.1    Escudero, L.F.2    Pizarro, C.3
  • 8
    • 75749108843 scopus 로고    scopus 로고
    • Industrial aspects and literature survey: combined inventory management and routing
    • Andersson H, Hoff A, Christiansen M, Hasle G, Løkketangen A (2010) Industrial aspects and literature survey: combined inventory management and routing. Comput Oper Res 37: 1515-1536.
    • (2010) Comput Oper Res , vol.37 , pp. 1515-1536
    • Andersson, H.1    Hoff, A.2    Christiansen, M.3    Hasle, G.4    Løkketangen, A.5
  • 9
    • 0002938084 scopus 로고
    • A column generation algorithm for a ship scheduling problem
    • Appelgren LH (1969) A column generation algorithm for a ship scheduling problem. Transp Sci 3: 53-68.
    • (1969) Transp Sci , vol.3 , pp. 53-68
    • Appelgren, L.H.1
  • 10
    • 0002914365 scopus 로고
    • Integer programming methods for a vessel scheduling problem
    • Appelgren LH (1971) Integer programming methods for a vessel scheduling problem. Transp Sci 5: 64-78.
    • (1971) Transp Sci , vol.5 , pp. 64-78
    • Appelgren, L.H.1
  • 11
    • 84878988708 scopus 로고    scopus 로고
    • Applying a fix-and-relax heuristic to U. S. navy force structure planning
    • Aytekin M (2002) Applying a fix-and-relax heuristic to U. S. navy force structure planning. Naval Postgraduate School.
    • (2002) Naval Postgraduate School
    • Aytekin, M.1
  • 12
    • 33645151237 scopus 로고    scopus 로고
    • Fix and relax heuristic for a stochastic lot-sizing problem
    • Beraldi P, Ghiani G, Grieco A, Guerriero E (2006) Fix and relax heuristic for a stochastic lot-sizing problem. Comput Optim Appl 33: 303-318.
    • (2006) Comput Optim Appl , vol.33 , pp. 303-318
    • Beraldi, P.1    Ghiani, G.2    Grieco, A.3    Guerriero, E.4
  • 13
    • 41149118126 scopus 로고    scopus 로고
    • Rolling-horizon and fix-and-relax heuristics for the parallel machine lot-sizing and scheduling problem with sequence-dependent set-up cost
    • Beraldi P, Ghiani G, Grieco A, Guerriero E (2008) Rolling-horizon and fix-and-relax heuristics for the parallel machine lot-sizing and scheduling problem with sequence-dependent set-up cost. Comput Oper Res 35: 3644-3656.
    • (2008) Comput Oper Res , vol.35 , pp. 3644-3656
    • Beraldi, P.1    Ghiani, G.2    Grieco, A.3    Guerriero, E.4
  • 15
    • 0006681133 scopus 로고    scopus 로고
    • Decomposition of a combined inventory and time constrained ship routing problem
    • Christiansen M (1999) Decomposition of a combined inventory and time constrained ship routing problem. Transp Sci 33: 3-16.
    • (1999) Transp Sci , vol.33 , pp. 3-16
    • Christiansen, M.1
  • 16
    • 78649442301 scopus 로고    scopus 로고
    • Maritime inventory routing problems
    • C. A. Floudas and P. M. Pardalos (Eds.), New York: Springer
    • Christiansen M, Fagerholt K (2009) Maritime inventory routing problems. In: Floudas CA, Pardalos PM (eds) Encyclopedia of optimization. Springer, New York.
    • (2009) Encyclopedia of Optimization
    • Christiansen, M.1    Fagerholt, K.2
  • 17
    • 0032397383 scopus 로고    scopus 로고
    • A method for solving ship routing problems with inventory constraints
    • Christiansen M, Nygreen B (1998a) A method for solving ship routing problems with inventory constraints. Ann Oper Res 81: 357-378.
    • (1998) Ann Oper Res , vol.81 , pp. 357-378
    • Christiansen, M.1    Nygreen, B.2
  • 18
    • 0032337356 scopus 로고    scopus 로고
    • Modelling path flows for a combined ship routing and inventory management problem
    • Christiansen M, Nygreen B (1998b) Modelling path flows for a combined ship routing and inventory management problem. Ann Oper Res 82: 391-412.
    • (1998) Ann Oper Res , vol.82 , pp. 391-412
    • Christiansen, M.1    Nygreen, B.2
  • 19
    • 36249030767 scopus 로고    scopus 로고
    • Robust inventory ship routing by column generation
    • G. Desaulniers, J. Desrosiers, and M. M. Solomon (Eds.), New York: Springer
    • Christiansen M, Nygreen B (2005) Robust inventory ship routing by column generation. In: Desaulniers G, Desrosiers J, Solomon MM (eds) Column generation. Springer, New York.
    • (2005) Column Generation
    • Christiansen, M.1    Nygreen, B.2
  • 20
    • 1642304524 scopus 로고    scopus 로고
    • Ship routing and scheduling: status and perspectives
    • Christiansen M, Fagerholt K, Ronen D (2004) Ship routing and scheduling: status and perspectives. Transp Sci 38: 1-18.
    • (2004) Transp Sci , vol.38 , pp. 1-18
    • Christiansen, M.1    Fagerholt, K.2    Ronen, D.3
  • 24
    • 34547145422 scopus 로고    scopus 로고
    • Joint rolling-horizon scheduling of materials processing and lot-sizing with sequence-dependent setups
    • De Araujo S, Arenales MN, Clark AR (2007) Joint rolling-horizon scheduling of materials processing and lot-sizing with sequence-dependent setups. J Heuristics 13: 337-358.
    • (2007) J Heuristics , vol.13 , pp. 337-358
    • De Araujo, S.1    Arenales, M.N.2    Clark, A.R.3
  • 25
    • 34548453509 scopus 로고    scopus 로고
    • Lot sizing and furnace scheduling in small foundries
    • De Araujo S, Arenales MN, Clark AR (2008) Lot sizing and furnace scheduling in small foundries. Comput Oper Res 35: 916-932.
    • (2008) Comput Oper Res , vol.35 , pp. 916-932
    • De Araujo, S.1    Arenales, M.N.2    Clark, A.R.3
  • 26
    • 0028769399 scopus 로고
    • On practical resource allocation for production planning and scheduling with period overlapping setups
    • Dillenberger C, Escudero LF, Wollensak A, Zhang W (1994) On practical resource allocation for production planning and scheduling with period overlapping setups. Eur J Oper Res 75: 275-286.
    • (1994) Eur J Oper Res , vol.75 , pp. 275-286
    • Dillenberger, C.1    Escudero, L.F.2    Wollensak, A.3    Zhang, W.4
  • 27
    • 34250117476 scopus 로고
    • A computational comparison of algorithms for the inventory routing problem
    • Dror M, Ball M, Golden B (1985) A computational comparison of algorithms for the inventory routing problem. Ann Oper Res 4: 3-23.
    • (1985) Ann Oper Res , vol.4 , pp. 3-23
    • Dror, M.1    Ball, M.2    Golden, B.3
  • 28
    • 28244454159 scopus 로고    scopus 로고
    • On a fix-and-relax framework for a class of project scheduling problems
    • Escudero LF, Salmeron J (2005) On a fix-and-relax framework for a class of project scheduling problems. Ann Oper Res 140: 163-188.
    • (2005) Ann Oper Res , vol.140 , pp. 163-188
    • Escudero, L.F.1    Salmeron, J.2
  • 29
    • 38549131391 scopus 로고    scopus 로고
    • Progressive interval heuristic for multi-item capacitated lot-sizing problems
    • Federgruen A, Meissner J, Tzur M (2007) Progressive interval heuristic for multi-item capacitated lot-sizing problems. Oper Res 55: 490-502.
    • (2007) Oper Res , vol.55 , pp. 490-502
    • Federgruen, A.1    Meissner, J.2    Tzur, M.3
  • 30
    • 58149250389 scopus 로고    scopus 로고
    • Solution approaches for the soft drink integrated production lot sizing and scheduling problem
    • Ferreira D, Morabito R, Rangel S (2009) Solution approaches for the soft drink integrated production lot sizing and scheduling problem. Eur J Oper Res 196: 697-706.
    • (2009) Eur J Oper Res , vol.196 , pp. 697-706
    • Ferreira, D.1    Morabito, R.2    Rangel, S.3
  • 31
    • 1642409757 scopus 로고    scopus 로고
    • Combining exact and heuristic methods for solving a vessel routing problem with inventory constraints and time windows
    • Flatberg T, Haavardtun H, Kloster O, Løkketangen A (2000) Combining exact and heuristic methods for solving a vessel routing problem with inventory constraints and time windows. Ric Oper 29: 55-68.
    • (2000) Ric Oper , vol.29 , pp. 55-68
    • Flatberg, T.1    Haavardtun, H.2    Kloster, O.3    Løkketangen, A.4
  • 32
    • 84873056722 scopus 로고    scopus 로고
    • LNGScheduler: a rich model for coordinating vessel routing, inventories and trade in the LNG-supply chain
    • Fodstad M, Tolstad Uggen K, Rømo F, Lium A-G, Stremersch G, Hecq S (2010) LNGScheduler: a rich model for coordinating vessel routing, inventories and trade in the LNG-supply chain. J Energy Mark 3: 1-34.
    • (2010) J Energy Mark , vol.3 , pp. 1-34
    • Fodstad, M.1    Tolstad Uggen, K.2    Rømo, F.3    Lium, A.-G.4    Stremersch, G.5    Hecq, S.6
  • 33
    • 0021632689 scopus 로고
    • Analysis of a large scale vehicle routing problem with an inventory component
    • Golden B, Assad A, Dahl R (1984) Analysis of a large scale vehicle routing problem with an inventory component. Large Scale Syst 7: 181-190.
    • (1984) Large Scale Syst , vol.7 , pp. 181-190
    • Golden, B.1    Assad, A.2    Dahl, R.3
  • 34
    • 77955591564 scopus 로고    scopus 로고
    • Supply chain optimization for the liquefied natural gas business
    • L. Bertazzi, M. G. Speranza, and JAEEVan Nunen (Eds.), Berlin: Springer
    • Grønhaug R, Christiansen M (2009) Supply chain optimization for the liquefied natural gas business. In: Bertazzi L, Speranza MG, van Nunen JAEE, (eds) Innovations in distribution logistics. Springer, Berlin.
    • (2009) Innovations in Distribution Logistics
    • Grønhaug, R.1    Christiansen, M.2
  • 36
    • 84866448704 scopus 로고    scopus 로고
    • IEA
    • IEA (2009) World energy outlook. http://www. iea. org/speech/2009/Tanaka/WEO2009_Press_Conference. pdf.
    • (2009) World energy outlook
  • 37
    • 4143075637 scopus 로고    scopus 로고
    • Flowsheet decomposition heuristic for scheduling: a relax-and-fix method
    • Kelly JD, Mann JL (2004) Flowsheet decomposition heuristic for scheduling: a relax-and-fix method. Comput Chem Eng 28: 2193-2200.
    • (2004) Comput Chem Eng , vol.28 , pp. 2193-2200
    • Kelly, J.D.1    Mann, J.L.2
  • 38
    • 33646549264 scopus 로고    scopus 로고
    • Airport management: taxi planning
    • Marín ÁG (2006) Airport management: taxi planning. Ann Oper Res 143: 191-202.
    • (2006) Ann Oper Res , vol.143 , pp. 191-202
    • Marín, Á.G.1
  • 39
    • 0023531578 scopus 로고
    • An interactive computer-aided ship scheduling system
    • Miller DM (1987) An interactive computer-aided ship scheduling system. Eur J Oper Res 32: 363-379.
    • (1987) Eur J Oper Res , vol.32 , pp. 363-379
    • Miller, D.M.1
  • 40
    • 77955658944 scopus 로고    scopus 로고
    • Rolling-horizon and fix-and-relax heuristics for the multi-product multi-level capacitated lot-sizing problem with sequence-dependent setups
    • Mohammadi M, Fatemi Ghomi SMT, Karimi B, Torabi SA (2008) Rolling-horizon and fix-and-relax heuristics for the multi-product multi-level capacitated lot-sizing problem with sequence-dependent setups. J Intell Manuf.
    • (2008) J Intell Manuf
    • Mohammadi, M.1    Fatemi Ghomi, S.M.T.2    Karimi, B.3    Torabi, S.A.4
  • 41
    • 0242655516 scopus 로고    scopus 로고
    • a gentle introduction to memetic algorithms
    • F. W. Glover and G. A. Kochenberger (Eds.), Berlin: Springer
    • Moscato P, Cotta C (2003) a gentle introduction to memetic algorithms. In: Glover FW, Kochenberger GA (eds) Handbook of metaheuristics. Springer, Berlin.
    • (2003) Handbook of Metaheuristics
    • Moscato, P.1    Cotta, C.2
  • 42
    • 40849139202 scopus 로고    scopus 로고
    • Furniture supply chain tactical planning optimization using a time decomposition approach
    • Ouhimmou M, D'amours S, Beauregard R, Ait-Kadi D, Singh Chauhan S (2008) Furniture supply chain tactical planning optimization using a time decomposition approach. Eur J Oper Res 189: 952-970.
    • (2008) Eur J Oper Res , vol.189 , pp. 952-970
    • Ouhimmou, M.1    D'amours, S.2    Beauregard, R.3    Ait-Kadi, D.4    Singh Chauhan, S.5
  • 43
    • 10444251832 scopus 로고    scopus 로고
    • Shipment planning at oil refineries using column generation and valid inequalities
    • Persson JA, Göthe-Lundgren M (2005) Shipment planning at oil refineries using column generation and valid inequalities. Eur J Oper Res 163: 631-652.
    • (2005) Eur J Oper Res , vol.163 , pp. 631-652
    • Persson, J.A.1    Göthe-Lundgren, M.2
  • 44
    • 50549092936 scopus 로고    scopus 로고
    • A tighter continuous time formulation for the cyclic scheduling of a mixed plant
    • Pochet Y, Warichet F (2008) A tighter continuous time formulation for the cyclic scheduling of a mixed plant. Comput Chem Eng 32: 2723-2744.
    • (2008) Comput Chem Eng , vol.32 , pp. 2723-2744
    • Pochet, Y.1    Warichet, F.2
  • 45
    • 0141733592 scopus 로고    scopus 로고
    • Multilevel lot sizing with setup times and multiple constrained resources: internally rolling schedules with lot-sizing windows
    • Stadtler H (2003) Multilevel lot sizing with setup times and multiple constrained resources: internally rolling schedules with lot-sizing windows. Oper Res 51: 487-502.
    • (2003) Oper Res , vol.51 , pp. 487-502
    • Stadtler, H.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.