메뉴 건너뛰기




Volumn 33, Issue , 2013, Pages 134-150

Incorporating network considerations into pavement management systems: A case for approximate dynamic programming

Author keywords

Approximate dynamic programming; Infrastructure management; Markov decision process

Indexed keywords

BEHAVIORAL RESEARCH; BUDGET CONTROL; CONCRETE PAVEMENTS; CONSTRUCTION INDUSTRY; DECISION MAKING; MARKOV PROCESSES;

EID: 84878870534     PISSN: 0968090X     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.trc.2013.03.003     Document Type: Article
Times cited : (93)

References (37)
  • 3
    • 2442622783 scopus 로고    scopus 로고
    • A tabu search based approach for work zone scheduling
    • In: Proceeding of the Transportation Research Board 80th Annual Meeting, Washington, DC.
    • Chang, Y.Y., Sawaya, O.B., Ziliaskopoulos, A.K., 2001. A tabu search based approach for work zone scheduling. In: Proceeding of the Transportation Research Board 80th Annual Meeting, Washington, DC.
    • (2001)
    • Chang, Y.Y.1    Sawaya, O.B.2    Ziliaskopoulos, A.K.3
  • 4
    • 24144466907 scopus 로고    scopus 로고
    • On parallel machine replacement problems with general replacement cost functions and stochastic deterioration
    • Childress S., Durango-Cohen P. On parallel machine replacement problems with general replacement cost functions and stochastic deterioration. Naval Research Logistics (NRL) 2005, 52(5):409-419.
    • (2005) Naval Research Logistics (NRL) , vol.52 , Issue.5 , pp. 409-419
    • Childress, S.1    Durango-Cohen, P.2
  • 5
    • 84865750680 scopus 로고    scopus 로고
    • Optimal threshold-based network-level transportation infrastructure life-cycle management with heterogeneous maintenance actions
    • Chu J.C., Chen Y.-J. Optimal threshold-based network-level transportation infrastructure life-cycle management with heterogeneous maintenance actions. Transportation Research Part B: Methodological 2012, 46(9):1123-1143.
    • (2012) Transportation Research Part B: Methodological , vol.46 , Issue.9 , pp. 1123-1143
    • Chu, J.C.1    Chen, Y.-J.2
  • 7
    • 1942442125 scopus 로고    scopus 로고
    • Maintenance and repair decision making for infrastructure facilities without a deterioration model
    • Durango-Cohen P.L. Maintenance and repair decision making for infrastructure facilities without a deterioration model. Journal of Infrastructure Systems 2004, 10(1):1-8.
    • (2004) Journal of Infrastructure Systems , vol.10 , Issue.1 , pp. 1-8
    • Durango-Cohen, P.L.1
  • 9
    • 84876701152 scopus 로고    scopus 로고
    • Accounting for network effects in railway asset management
    • Furuya A., Madanat S. Accounting for network effects in railway asset management. Journal of Transportation Engineering 2012, 139(1):92-100.
    • (2012) Journal of Transportation Engineering , vol.139 , Issue.1 , pp. 92-100
    • Furuya, A.1    Madanat, S.2
  • 11
    • 84878889106 scopus 로고    scopus 로고
    • Approximate dynamic programming approach to network-level budget planning and allocation for pavement infrastructure
    • In: Transportation Research Board 88th Annual Meeting. Number 09-2344.
    • Gao, L., Zhang, Z., 2009. Approximate dynamic programming approach to network-level budget planning and allocation for pavement infrastructure. In: Transportation Research Board 88th Annual Meeting. Number 09-2344.
    • (2009)
    • Gao, L.1    Zhang, Z.2
  • 12
    • 0002539999 scopus 로고
    • A statewide pavement management system
    • Golabi K., Kulkarni R.B., Way G.B. A statewide pavement management system. Interfaces 1982, 12(6):5-21.
    • (1982) Interfaces , vol.12 , Issue.6 , pp. 5-21
    • Golabi, K.1    Kulkarni, R.B.2    Way, G.B.3
  • 13
    • 0039054430 scopus 로고    scopus 로고
    • Pontis: a system for maintenance optimization and improvement of US bridge networks
    • Golabi K., Shepard R. Pontis: a system for maintenance optimization and improvement of US bridge networks. Interfaces 1997, 27(1):71-88.
    • (1997) Interfaces , vol.27 , Issue.1 , pp. 71-88
    • Golabi, K.1    Shepard, R.2
  • 14
    • 34548173455 scopus 로고    scopus 로고
    • Algorithm for the planning of optimum highway work zones
    • Hajdin R., Lindenmann H.P. Algorithm for the planning of optimum highway work zones. Journal of Infrastructure Systems 2007, 13(3):202-214.
    • (2007) Journal of Infrastructure Systems , vol.13 , Issue.3 , pp. 202-214
    • Hajdin, R.1    Lindenmann, H.P.2
  • 16
    • 0141754345 scopus 로고
    • Survey of linear programming for standard and nonstandard Markovian control problems. Part I: Theory
    • Kallenberg L.C.M. Survey of linear programming for standard and nonstandard Markovian control problems. Part I: Theory. Mathematical Methods of Operations Research 1994, 40(1):1-42.
    • (1994) Mathematical Methods of Operations Research , vol.40 , Issue.1 , pp. 1-42
    • Kallenberg, L.C.M.1
  • 17
    • 0000598411 scopus 로고
    • Parallel replacement under capital rationing constraints
    • Karabakal N., Lohmann J.R., Bean J.C. Parallel replacement under capital rationing constraints. Management Science 1994, 40(3):305-319.
    • (1994) Management Science , vol.40 , Issue.3 , pp. 305-319
    • Karabakal, N.1    Lohmann, J.R.2    Bean, J.C.3
  • 18
    • 33646808628 scopus 로고    scopus 로고
    • Model uncertainty and the management of a system of infrastructure facilities
    • Kuhn K., Madanat S. Model uncertainty and the management of a system of infrastructure facilities. Transportation Research Part C: Emerging Technologies 2005, 13(5-6):391-404.
    • (2005) Transportation Research Part C: Emerging Technologies , vol.13 , Issue.5-6 , pp. 391-404
    • Kuhn, K.1    Madanat, S.2
  • 19
    • 77954011959 scopus 로고    scopus 로고
    • Network-level infrastructure management using approximate dynamic programming
    • Kuhn K.D. Network-level infrastructure management using approximate dynamic programming. Journal of Infrastructure Systems 2010, 16(2):103-111.
    • (2010) Journal of Infrastructure Systems , vol.16 , Issue.2 , pp. 103-111
    • Kuhn, K.D.1
  • 20
    • 15944379640 scopus 로고    scopus 로고
    • Computer simulation model: construction analysis for pavement rehabilitation strategies
    • Lee E.B., Ibbs C.W. Computer simulation model: construction analysis for pavement rehabilitation strategies. Journal of Construction Engineering and Management 2005, 131(4):449-458.
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.4 , pp. 449-458
    • Lee, E.B.1    Ibbs, C.W.2
  • 22
    • 33747283719 scopus 로고    scopus 로고
    • Adaptive optimization and systematic probing of infrastructure system maintenance policies under model uncertainty
    • Madanat S., Park S., Kuhn K. Adaptive optimization and systematic probing of infrastructure system maintenance policies under model uncertainty. Journal of Infrastructure Systems 2006, 12(3):192-198.
    • (2006) Journal of Infrastructure Systems , vol.12 , Issue.3 , pp. 192-198
    • Madanat, S.1    Park, S.2    Kuhn, K.3
  • 23
    • 84929208389 scopus 로고    scopus 로고
    • A simultaneous network optimization approach for pavement management systems
    • Medury A., Madanat S. A simultaneous network optimization approach for pavement management systems. Journal of Infrastructure Systems 2013, 10.1061/(ASCE)IS.1943-555X.0000149.
    • (2013) Journal of Infrastructure Systems
    • Medury, A.1    Madanat, S.2
  • 25
    • 67349177505 scopus 로고    scopus 로고
    • Resource-constrained management of heterogeneous assets with stochastic deterioration
    • Ohlmann J.W., Bean J.C. Resource-constrained management of heterogeneous assets with stochastic deterioration. European Journal of Operational Research 2009, 199(1):198-208.
    • (2009) European Journal of Operational Research , vol.199 , Issue.1 , pp. 198-208
    • Ohlmann, J.W.1    Bean, J.C.2
  • 26
    • 33847217607 scopus 로고    scopus 로고
    • Pavement resurfacing planning for highway networks: parametric policy iteration approach
    • Ouyang Y. Pavement resurfacing planning for highway networks: parametric policy iteration approach. Journal of Infrastructure Systems 2007, 13(1):65-71.
    • (2007) Journal of Infrastructure Systems , vol.13 , Issue.1 , pp. 65-71
    • Ouyang, Y.1
  • 27
    • 33745039168 scopus 로고    scopus 로고
    • An analytical solution for the finite-horizon pavement resurfacing planning problem
    • Ouyang Y., Madanat S. An analytical solution for the finite-horizon pavement resurfacing planning problem. Transportation Research Part B: Methodological 2006, 40(9):767-778.
    • (2006) Transportation Research Part B: Methodological , vol.40 , Issue.9 , pp. 767-778
    • Ouyang, Y.1    Madanat, S.2
  • 29
    • 79959785833 scopus 로고    scopus 로고
    • A bottom-up solution for the multi-facility optimal pavement resurfacing problem
    • Sathaye N., Madanat S. A bottom-up solution for the multi-facility optimal pavement resurfacing problem. Transportation Research Part B: Methodological 2011, 45(7):1004-1017.
    • (2011) Transportation Research Part B: Methodological , vol.45 , Issue.7 , pp. 1004-1017
    • Sathaye, N.1    Madanat, S.2
  • 30
    • 63449141834 scopus 로고    scopus 로고
    • An approximate dynamic programming algorithm for large-scale fleet management: a case application
    • Simão H.P., Day J., George A.P., Gifford T., Nienow J., Powell W.B. An approximate dynamic programming algorithm for large-scale fleet management: a case application. Transportation Science 2009, 43(2):178-197.
    • (2009) Transportation Science , vol.43 , Issue.2 , pp. 178-197
    • Simão, H.P.1    Day, J.2    George, A.P.3    Gifford, T.4    Nienow, J.5    Powell, W.B.6
  • 31
    • 84878881251 scopus 로고
    • The Development of Optimal Strategies for Maintenance, Rehabilitation and Replacement of Highway Bridges
    • The Elements of the Indiana Bridge Management System (IBMS). Tech. Rep. FHWA/IN/JHRP-88/15-1. Joint Highway Research Project, Indiana Department of Transportation and Purdue University, West Lafayette, Indiana.
    • Sinha, K., Saito, M., Jiang, Y., Murthy, S., Tee, A., Bowman, M., 1988. The Development of Optimal Strategies for Maintenance, Rehabilitation and Replacement of Highway Bridges, vol. 1: The Elements of the Indiana Bridge Management System (IBMS). Tech. Rep. FHWA/IN/JHRP-88/15-1. Joint Highway Research Project, Indiana Department of Transportation and Purdue University, West Lafayette, Indiana.
    • (1988) , vol.1
    • Sinha, K.1    Saito, M.2    Jiang, Y.3    Murthy, S.4    Tee, A.5    Bowman, M.6
  • 33
    • 34249830539 scopus 로고
    • A time indexed formulation of non-preemptive single machine scheduling problems
    • Sousa J., Wolsey L. A time indexed formulation of non-preemptive single machine scheduling problems. Mathematical Programming 1992, 54(1):353-367.
    • (1992) Mathematical Programming , vol.54 , Issue.1 , pp. 353-367
    • Sousa, J.1    Wolsey, L.2
  • 35
    • 0029276036 scopus 로고
    • Temporal difference learning and TD-gammon
    • Tesauro G. Temporal difference learning and TD-gammon. Communications of the ACM 1995, 38(3):58-68.
    • (1995) Communications of the ACM , vol.38 , Issue.3 , pp. 58-68
    • Tesauro, G.1
  • 36
    • 34548647703 scopus 로고    scopus 로고
    • A Snapshot of Summer 2001 Work Zone Activity
    • Tech. Rep. EDL: 13793, National Transportation Library, FHWA, U.S. Department of Transportation.
    • Wunderlich, K., Hardesty, D., 2003. A Snapshot of Summer 2001 Work Zone Activity. Tech. Rep. EDL: 13793, National Transportation Library, FHWA, U.S. Department of Transportation.
    • (2003)
    • Wunderlich, K.1    Hardesty, D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.