메뉴 건너뛰기




Volumn 139, Issue 7, 2013, Pages 895-898

Enhancing construction as-built documentation using interactive voice response

Author keywords

As built; Computer application; E mail; Interactive voice response; Progress tracking; Project control; Voice

Indexed keywords

AS-BUILT; BI-DIRECTIONAL COMMUNICATION; CONSTRUCTION ACTIVITIES; INTERACTIVE VOICE RESPONSE; PROJECT CONTROL; REQUESTS FOR INFORMATION; SCHEDULING APPLICATION; VOICE APPLICATIONS;

EID: 84878820289     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CO.1943-7862.0000648     Document Type: Article
Times cited : (20)

References (14)
  • 1
    • 0031147307 scopus 로고    scopus 로고
    • A multimedia construction delay management system
    • 1093-9687 10.1111/0885-9507.00055
    • Abudayyeh, O. Y. (1997). " A multimedia construction delay management system." J. Microcomput. Civil Eng., 12 (3), 183-192. 1093-9687 10.1111/0885-9507.00055
    • (1997) J. Microcomput. Civil Eng. , vol.12 , Issue.3 , pp. 183-192
    • Abudayyeh, O.Y.1
  • 2
    • 33645965860 scopus 로고    scopus 로고
    • Causes of delay in large construction projects
    • 0263-7863 10.1016/j.ijproman.2005.11.010 IPMAEL
    • Assaf, S. A., and, Al-Hejji, S. (2006). " Causes of delay in large construction projects." Int. J. Proj. Manage., 24 (4), 349-357. 0263-7863 10.1016/j.ijproman.2005.11.010 IPMAEL
    • (2006) Int. J. Proj. Manage. , vol.24 , Issue.4 , pp. 349-357
    • Assaf, S.A.1    Al-Hejji, S.2
  • 4
    • 81855200484 scopus 로고    scopus 로고
    • Integrating automated data acquisition technologies for progress reporting of construction projects
    • International Association for Automation and Robotics in Construction (IAARC), Austin, TX
    • El-Omari, S., and, Moselhi, O. (2009). " Integrating automated data acquisition technologies for progress reporting of construction projects." 26th Int. Symp. on Automation and Robotics in Construction, International Association for Automation and Robotics in Construction (IAARC), Austin, TX, 86-94.
    • (2009) 26th Int. Symp. on Automation and Robotics in Construction , pp. 86-94
    • El-Omari, S.1    Moselhi, O.2
  • 5
    • 33746704895 scopus 로고    scopus 로고
    • Mobile model-based bridge lifecycle management systems
    • 1093-9687 10.1111/j.1467-8667.2006.00456.x
    • Hammad, A., Zhang, C., Hu, Y., and, Mozaffari, E. (2006). " Mobile model-based bridge lifecycle management systems." J. Comput.-Aided Civ. Infrastruct. Eng., 21 (7), 530-547. 1093-9687 10.1111/j.1467-8667.2006.00456.x
    • (2006) J. Comput.-Aided Civ. Infrastruct. Eng. , vol.21 , Issue.7 , pp. 530-547
    • Hammad, A.1    Zhang, C.2    Hu, Y.3    Mozaffari, E.4
  • 6
    • 84860296261 scopus 로고    scopus 로고
    • Email-based system for documenting construction as-built details
    • 0926-5805 10.1016/j.autcon.2012.02.014
    • Hegazy, T., and, Abdel-Monem, M. (2012). " Email-based system for documenting construction as-built details." J. Autom. Constr., 24, 130-137. 0926-5805 10.1016/j.autcon.2012.02.014
    • (2012) J. Autom. Constr. , vol.24 , pp. 130-137
    • Hegazy, T.1    Abdel-Monem, M.2
  • 7
    • 77956817791 scopus 로고    scopus 로고
    • Critical path segments (CPS) scheduling technique
    • JCEMD4 0733-9364 10.1061/(ASCE)CO.1943-7862.0000212
    • Hegazy, T., and, Menesi, W. (2010). " Critical path segments (CPS) scheduling technique." J. Constr. Eng. Manage., 136 (10), 1078-1085. JCEMD4 0733-9364 10.1061/(ASCE)CO.1943-7862.0000212
    • (2010) J. Constr. Eng. Manage. , vol.136 , Issue.10 , pp. 1078-1085
    • Hegazy, T.1    Menesi, W.2
  • 8
    • 84878882507 scopus 로고    scopus 로고
    • (Apr. 2012)
    • ifbyphone. (2012). http://public.ifbyphone.com (Apr. 2012).
    • (2012) Ifbyphone
  • 9
    • 84860288459 scopus 로고    scopus 로고
    • Influential factors of VOIP adoption of top 500 export-import enterprises in Taiwan
    • Liao, C., and, Tseng, P. (2010). " Influential factors of VOIP adoption of top 500 export-import enterprises in Taiwan." J. Contemp. Manage. Res., 6 (1), 11-28.
    • (2010) J. Contemp. Manage. Res. , vol.6 , Issue.1 , pp. 11-28
    • Liao, C.1    Tseng, P.2
  • 10
    • 84878830467 scopus 로고    scopus 로고
    • Ministry of Transportation, and Infrastructure. Victoria, BC, Canada (Nov. 29, 2012)
    • Ministry of Transportation, and Infrastructure. (2012). Standard specifications for highway construction, Victoria, BC, Canada, http://www.th.gov.bc.ca/publications/const-maint/contract-serv/standard-specs/ Volume-1-SS2012.pdf (Nov. 29, 2012).
    • (2012) Standard Specifications for Highway Construction
  • 11
    • 33847222202 scopus 로고    scopus 로고
    • Assessing research issues in automated project performance control (APPC)
    • 0926-5805 10.1016/j.autcon.2006.08.001
    • Navon, R., and, Sacks, R. (2007). " Assessing research issues in automated project performance control (APPC)." J. Autom. Constr., 16 (4), 474-484. 0926-5805 10.1016/j.autcon.2006.08.001
    • (2007) J. Autom. Constr. , vol.16 , Issue.4 , pp. 474-484
    • Navon, R.1    Sacks, R.2
  • 12
    • 58849149873 scopus 로고    scopus 로고
    • Opportunities to use speech recognition for bridge inspection
    • ASCE, Reston, VA
    • Sunkpho, J., and, Garrett, J. H. (2000). " Opportunities to use speech recognition for bridge inspection." Proc., Construction Congress VI, ASCE, Reston, VA.
    • (2000) Proc. Construction Congress VI
    • Sunkpho, J.1    Garrett, J.H.2
  • 13
  • 14
    • 67449110716 scopus 로고    scopus 로고
    • Improving communication barriers for on-site information flow: An exploratory study
    • 1474-0346 10.1016/j.aei.2009.03.002
    • Tsai, M.-K. (2009). " Improving communication barriers for on-site information flow: An exploratory study." J. Adv. Eng. Inf., 23 (3), 323-331. 1474-0346 10.1016/j.aei.2009.03.002
    • (2009) J. Adv. Eng. Inf. , vol.23 , Issue.3 , pp. 323-331
    • Tsai, M.-K.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.