-
1
-
-
0031147307
-
A multimedia construction delay management system
-
1093-9687 10.1111/0885-9507.00055
-
Abudayyeh, O. Y. (1997). " A multimedia construction delay management system." J. Microcomput. Civil Eng., 12 (3), 183-192. 1093-9687 10.1111/0885-9507.00055
-
(1997)
J. Microcomput. Civil Eng.
, vol.12
, Issue.3
, pp. 183-192
-
-
Abudayyeh, O.Y.1
-
2
-
-
33645965860
-
Causes of delay in large construction projects
-
0263-7863 10.1016/j.ijproman.2005.11.010 IPMAEL
-
Assaf, S. A., and, Al-Hejji, S. (2006). " Causes of delay in large construction projects." Int. J. Proj. Manage., 24 (4), 349-357. 0263-7863 10.1016/j.ijproman.2005.11.010 IPMAEL
-
(2006)
Int. J. Proj. Manage.
, vol.24
, Issue.4
, pp. 349-357
-
-
Assaf, S.A.1
Al-Hejji, S.2
-
3
-
-
57749119938
-
The root causes of delays in highway construction
-
Transportation Research Board, Washington, DC
-
Ellis, R. D., and, Thomas, H. R. (2003). " The root causes of delays in highway construction." 82nd Annual Meeting of the Transportation Research Board, Transportation Research Board, Washington, DC.
-
(2003)
82nd Annual Meeting of the Transportation Research Board
-
-
Ellis, R.D.1
Thomas, H.R.2
-
4
-
-
81855200484
-
Integrating automated data acquisition technologies for progress reporting of construction projects
-
International Association for Automation and Robotics in Construction (IAARC), Austin, TX
-
El-Omari, S., and, Moselhi, O. (2009). " Integrating automated data acquisition technologies for progress reporting of construction projects." 26th Int. Symp. on Automation and Robotics in Construction, International Association for Automation and Robotics in Construction (IAARC), Austin, TX, 86-94.
-
(2009)
26th Int. Symp. on Automation and Robotics in Construction
, pp. 86-94
-
-
El-Omari, S.1
Moselhi, O.2
-
5
-
-
33746704895
-
Mobile model-based bridge lifecycle management systems
-
1093-9687 10.1111/j.1467-8667.2006.00456.x
-
Hammad, A., Zhang, C., Hu, Y., and, Mozaffari, E. (2006). " Mobile model-based bridge lifecycle management systems." J. Comput.-Aided Civ. Infrastruct. Eng., 21 (7), 530-547. 1093-9687 10.1111/j.1467-8667.2006.00456.x
-
(2006)
J. Comput.-Aided Civ. Infrastruct. Eng.
, vol.21
, Issue.7
, pp. 530-547
-
-
Hammad, A.1
Zhang, C.2
Hu, Y.3
Mozaffari, E.4
-
6
-
-
84860296261
-
Email-based system for documenting construction as-built details
-
0926-5805 10.1016/j.autcon.2012.02.014
-
Hegazy, T., and, Abdel-Monem, M. (2012). " Email-based system for documenting construction as-built details." J. Autom. Constr., 24, 130-137. 0926-5805 10.1016/j.autcon.2012.02.014
-
(2012)
J. Autom. Constr.
, vol.24
, pp. 130-137
-
-
Hegazy, T.1
Abdel-Monem, M.2
-
7
-
-
77956817791
-
Critical path segments (CPS) scheduling technique
-
JCEMD4 0733-9364 10.1061/(ASCE)CO.1943-7862.0000212
-
Hegazy, T., and, Menesi, W. (2010). " Critical path segments (CPS) scheduling technique." J. Constr. Eng. Manage., 136 (10), 1078-1085. JCEMD4 0733-9364 10.1061/(ASCE)CO.1943-7862.0000212
-
(2010)
J. Constr. Eng. Manage.
, vol.136
, Issue.10
, pp. 1078-1085
-
-
Hegazy, T.1
Menesi, W.2
-
8
-
-
84878882507
-
-
(Apr. 2012)
-
ifbyphone. (2012). http://public.ifbyphone.com (Apr. 2012).
-
(2012)
Ifbyphone
-
-
-
9
-
-
84860288459
-
Influential factors of VOIP adoption of top 500 export-import enterprises in Taiwan
-
Liao, C., and, Tseng, P. (2010). " Influential factors of VOIP adoption of top 500 export-import enterprises in Taiwan." J. Contemp. Manage. Res., 6 (1), 11-28.
-
(2010)
J. Contemp. Manage. Res.
, vol.6
, Issue.1
, pp. 11-28
-
-
Liao, C.1
Tseng, P.2
-
10
-
-
84878830467
-
-
Ministry of Transportation, and Infrastructure. Victoria, BC, Canada (Nov. 29, 2012)
-
Ministry of Transportation, and Infrastructure. (2012). Standard specifications for highway construction, Victoria, BC, Canada, http://www.th.gov.bc.ca/publications/const-maint/contract-serv/standard-specs/ Volume-1-SS2012.pdf (Nov. 29, 2012).
-
(2012)
Standard Specifications for Highway Construction
-
-
-
11
-
-
33847222202
-
Assessing research issues in automated project performance control (APPC)
-
0926-5805 10.1016/j.autcon.2006.08.001
-
Navon, R., and, Sacks, R. (2007). " Assessing research issues in automated project performance control (APPC)." J. Autom. Constr., 16 (4), 474-484. 0926-5805 10.1016/j.autcon.2006.08.001
-
(2007)
J. Autom. Constr.
, vol.16
, Issue.4
, pp. 474-484
-
-
Navon, R.1
Sacks, R.2
-
12
-
-
58849149873
-
Opportunities to use speech recognition for bridge inspection
-
ASCE, Reston, VA
-
Sunkpho, J., and, Garrett, J. H. (2000). " Opportunities to use speech recognition for bridge inspection." Proc., Construction Congress VI, ASCE, Reston, VA.
-
(2000)
Proc. Construction Congress VI
-
-
Sunkpho, J.1
Garrett, J.H.2
-
13
-
-
77956310770
-
Novel technologies for construction field data collection
-
International Society for Computing in Civil and Building Engineering (ISCCBE), Weimar, Germany
-
Trupp, T., Soibelman, L. T., Hashash, M. A., and, Liu, L. Y. (2004). " Novel technologies for construction field data collection." 10th Int. Conf. on Computing in Civil and Building Engineering (ICCCBE-10), International Society for Computing in Civil and Building Engineering (ISCCBE), Weimar, Germany.
-
(2004)
10th Int. Conf. on Computing in Civil and Building Engineering (ICCCBE-10)
-
-
Trupp, T.1
Soibelman, L.T.2
Hashash, M.A.3
Liu, L.Y.4
-
14
-
-
67449110716
-
Improving communication barriers for on-site information flow: An exploratory study
-
1474-0346 10.1016/j.aei.2009.03.002
-
Tsai, M.-K. (2009). " Improving communication barriers for on-site information flow: An exploratory study." J. Adv. Eng. Inf., 23 (3), 323-331. 1474-0346 10.1016/j.aei.2009.03.002
-
(2009)
J. Adv. Eng. Inf.
, vol.23
, Issue.3
, pp. 323-331
-
-
Tsai, M.-K.1
|