1
-
-
58449104091
-
Float allocation using the total risk approach
-
JCEMD4 0733-9364, 10.1061/(ASCE)0733-9364(2009)135:2(88)
-
Al-Gahtani, K. (2009). " Float allocation using the total risk approach. " J. Constr. Eng. Manage. JCEMD4 0733-9364, 135 (2), 88-95. 10.1061/(ASCE)0733-9364(2009)135:2(88)
-
(2009)
J. Constr. Eng. Manage.
, vol.135
, Issue.2
, pp. 88-95
-
-
Al-Gahtani, K.1
-
4
-
-
23044451467
-
Key constraints analysis with integrated production scheduler
-
DOI 10.1061/(ASCE)0733-9364(2005)131:7(753)
-
Chua, D. K. H., and Shen, L. J. (2005). " Key constraint analysis with integrated production scheduler. " J. Constr. Eng. Manage. JCEMD4 0733-9364, 131 (7), 753-764. 10.1061/(ASCE)0733-9364(2005)131:7(753) (Pubitemid 41068296)
-
(2005)
Journal of Construction Engineering and Management
, vol.131
, Issue.7
, pp. 753-764
-
-
Chua, D.K.H.1
Shen, L.J.2
-
5
-
-
2342445477
-
DSM versus CPM: Issues for planning design and construction activities
-
", Honolulu, ASCE.
-
Fayez, M., Axelsson, P., Oloufa, A., and Hosni, Y. (2003). " DSM versus CPM: Issues for planning design and construction activities. " Proc., Construction Research Congress, Honolulu, ASCE.
-
(2003)
Proc., Construction Research Congress
-
-
Fayez, M.1
Axelsson, P.2
Oloufa, A.3
Hosni, Y.4
-
6
-
-
33745292984
-
Survey of the construction industry relative to the use of CPM scheduling for construction projects
-
DOI 10.1061/(ASCE)0733-9364(2006)132:7(697), 012607QCO
-
Galloway, P. D. (2006). " Survey of the construction industry relative to the use of CPM scheduling for construction projects. " J. Constr. Eng. Manage. JCEMD4 0733-9364, 132 (7), 697-711. 10.1061/(ASCE)0733- 9364(2006)132:7(697) (Pubitemid 43932176)
-
(2006)
Journal of Construction Engineering and Management
, vol.132
, Issue.7
, pp. 697-711
-
-
Galloway, P.D.1
-
8
-
-
33751371489
-
Simplified project management for construction practitioners
-
Hegazy, T. (2006). " Simplified project management for construction practitioners. " Cost Engineering J., AACE Int., 48 (11), 20-28. (Pubitemid 44813160)
-
(2006)
Cost Engineering (Morgantown, West Virginia)
, vol.48
, Issue.11
, pp. 20-28
-
-
Hegazy, T.1
-
9
-
-
47749097935
-
Delay analysis under multiple baseline updates
-
JCEMD4 0733-9364, 10.1061/(ASCE)0733-9364(2008)134:8(575)
-
Hegazy, T., and Menesi, W. (2008). " Delay analysis under multiple baseline updates. " J. Constr. Eng. Manage. JCEMD4 0733-9364, 134 (8), 575-582. 10.1061/(ASCE)0733-9364(2008)134:8(575)
-
(2008)
J. Constr. Eng. Manage.
, vol.134
, Issue.8
, pp. 575-582
-
-
Hegazy, T.1
Menesi, W.2
-
10
-
-
0023440167
-
Expert system for construction planning
-
" JCCEE5 0887-3801, 10.1061/(ASCE)0887-3801(1987)1:4(253)
-
Hendrickson, C., Zozaya-Gorostiza, C., Rehak, D., Baracco-Miller, E., and Lim, P. (1987). " Expert system for construction planning. " J. Comput. Civ. Eng. JCCEE5 0887-3801, 1 (4), 253-269. 10.1061/(ASCE)0887- 3801(1987)1:4(253)
-
(1987)
J. Comput. Civ. Eng.
, vol.1
, Issue.4
, pp. 253-269
-
-
Hendrickson, C.1
Zozaya-Gorostiza, C.2
Rehak, D.3
Baracco-Miller, E.4
Lim, P.5
-
11
-
-
11944262936
-
Enhanced PDM-Concepts and benefits
-
Herold, S. C. (2004). " Enhanced PDM-Concepts and benefits. " AACE Int. Trans., PS.09.1-PS.09.8.
-
(2004)
AACE Int. Trans.
-
-
Herold, S.C.1
-
12
-
-
33846268790
-
Schedule analysis under the effect of resource allocation
-
DOI 10.1061/(ASCE)0733-9364(2007)133:2(131)
-
Ibbs, W., and Nguyen, L. D. (2007). " Schedule analysis under the effect of resource allocation. " J. Constr. Eng. Manage. JCEMD4 0733-9364, 133 (2), 131-138. 10.1061/(ASCE)0733-9364(2007)133:2(131) (Pubitemid 46121722)
-
(2007)
Journal of Construction Engineering and Management
, vol.133
, Issue.2
, pp. 131-138
-
-
Ibbs, W.1
Nguyen, L.D.2
-
14
-
-
14544287822
-
Critical path method with multiple calendars
-
DOI 10.1061/(ASCE)0733-9364(2005)131:3(330)
-
Kim, K., and de la Garza, J. M. (2005). " Critical path method with multiple calendars. " J. Constr. Eng. Manage. JCEMD4 0733-9364, 131 (3), 330-342. 10.1061/(ASCE)0733-9364(2005)131:3(330) (Pubitemid 40303941)
-
(2005)
Journal of Construction Engineering and Management
, vol.131
, Issue.3
, pp. 330-342
-
-
Kim, K.1
De La Garza, J.M.2
-
15
-
-
14544304866
-
Critics can't find the logic in many of today's CPM schedules; Users want software with flexibility, but is it true CPM?
-
ENREAU 0013-807X.
-
Korman, R., and Daniels, S. H. (2003). " Critics can't find the logic in many of today's CPM schedules; users want software with flexibility, but is it true CPM? " Eng. News-Rec. ENREAU 0013-807X, 250 (20), 30-33.
-
(2003)
Eng. News-Rec.
, vol.250
, Issue.20
, pp. 30-33
-
-
Korman, R.1
Daniels, S.H.2
-
16
-
-
33749581556
-
CPM not working well on small projects
-
Kuhn, A. J. (2006). " CPM not working well on small projects. " AACE Int. Trans., PS.21.1-PS.21.3.
-
(2006)
AACE Int. Trans.
-
-
Kuhn, A.J.1
-
17
-
-
0035279805
-
Project management in construction: Software use and research directions
-
DOI 10.1061/(ASCE)0733-9364(2001)127:2(101)
-
Liberatore, M. J., Pollack-Johnson, B., and Smith, C. A. (2001). " Project management in construction: Software use and research directions. " J. Constr. Eng. Manage., 127 (2), 101-107. 10.1061/(ASCE)0733-9364(2001)127: 2(101) 0733-9364 (Pubitemid 32297257)
-
(2001)
Journal of Construction Engineering and Management
, vol.127
, Issue.2
, pp. 101-107
-
-
Liberatore, M.J.1
Pollack-Johnson, B.2
Smith, C.A.3
-
18
-
-
31844431514
-
A continuously changing as-planned baseline?
-
CDR.08, 2005 AACE International Transactions - AACE International 49th Annual Meeting
-
Livengood, J., and Anderson, M. (2006). " A continuously changing as-planned baseline? " AACE Int. Trans., CDR 08.1-CDR08.8. (Pubitemid 43182349)
-
(2005)
AACE International Transactions
, pp. 1-8
-
-
Livengood, J.C.1
Anderson, M.I.2
-
20
-
-
37249001774
-
Critical path scheduling under resource calendar constraints
-
DOI 10.1061/(ASCE)0733-9364(2008)134:1(25)
-
Lu, M., and Lam, H. -C. (2008). " Critical path scheduling under resource calendar constraints. " J. Constr. Eng. Manage. JCEMD4 0733-9364, 134 (1), 25-31. 10.1061/(ASCE)0733-9364(2008)134:1(25) (Pubitemid 350265375)
-
(2008)
Journal of Construction Engineering and Management
, vol.134
, Issue.1
, pp. 25-31
-
-
Lu, M.1
Lam, H.-C.2
-
21
-
-
69149102940
-
Transform schemes applied on non-finish-to-start logical relationships in project network diagrams
-
JCEMD4 0733-9364, 10.1061/(ASCE)CO.1943-7862.0000062
-
Lu, M., and Lam, H. -C. (2009). " Transform schemes applied on non-finish-to-start logical relationships in project network diagrams. " J. Constr. Eng. Manage. JCEMD4 0733-9364, 135 (9), 863-873. 10.1061/(ASCE)CO.1943- 7862.0000062
-
(2009)
J. Constr. Eng. Manage.
, vol.135
, Issue.9
, pp. 863-873
-
-
Lu, M.1
Lam, H.-C.2
-
22
-
-
63049137187
-
Five needed enhancements to the CPM for construction projects
-
CSCE, Canada.
-
Menesi, W., and Hegazy, T. (2008). " Five needed enhancements to the CPM for construction projects. " Proc., 2008 Annual Canadian Society of Civil Engineers (CSCE) Conf., CSCE, Canada.
-
(2008)
Proc., 2008 Annual Canadian Society of Civil Engineers (CSCE) Conf.
-
-
Menesi, W.1
Hegazy, T.2
-
23
-
-
0028255498
-
Geometric-based reasoning system for project planning
-
JCCEE5 0887-3801, 10.1061/(ASCE)0887-3801(1994)8:1(52)
-
Morad, A. A., and Beliveau, Y. J. (1994). " Geometric-based reasoning system for project planning. " J. Comput. Civ. Eng. JCCEE5 0887-3801, 8 (1), 52-71. 10.1061/(ASCE)0887-3801(1994)8:1(52)
-
(1994)
J. Comput. Civ. Eng.
, vol.8
, Issue.1
, pp. 52-71
-
-
Morad, A.A.1
Beliveau, Y.J.2
-
25
-
-
33749548302
-
Construction CPM scheduling-precision without accuracy
-
Ostrowski, V. M. (2006). " Construction CPM scheduling-precision without accuracy. " AACE Int. Trans., CDR.S03.1-CDR.S03.4.
-
(2006)
AACE Int. Trans.
-
-
Ostrowski, V.M.1
-
26
-
-
33749543055
-
RDM-Relationship diagramming method
-
Plotnick, F. L. (2006). " RDM-Relationship diagramming method. " AACE Int. Trans., PS.08.1-PS.08.10.
-
(2006)
AACE Int. Trans.
-
-
Plotnick, F.L.1
-
27
-
-
80053666683
-
Project planning using logic diagramming method
-
Ponce de Leon, G. (2008). " Project planning using logic diagramming method. " AACE Int. Trans., PS.S05.1-PS.S05.6.
-
(2008)
AACE Int. Trans.
-
-
Ponce De Leon, G.1
-
28
-
-
33747306903
-
Petri net-based scheduling of construction projects
-
" 1028-6628, 10.1080/10286600310001633848
-
Sawhney, A., Mund, A., and Chaitavatputtiporn, T. (2003). " Petri net-based scheduling of construction projects. " Civ. Eng. Environ. Syst. 1028-6628, 20 (4), 255-271. 10.1080/10286600310001633848
-
(2003)
Civ. Eng. Environ. Syst.
, vol.20
, Issue.4
, pp. 255-271
-
-
Sawhney, A.1
Mund, A.2
Chaitavatputtiporn, T.3
-
29
-
-
21244465500
-
Effect of multiple calendars on total float and critical path
-
Scavino, N. J. (2003). " Effect of multiple calendars on total float and critical path. " Cost Engineering J., AACE Int., 45 (6), 11-15.
-
(2003)
Cost Engineering J., AACE Int.
, vol.45
, Issue.6
, pp. 11-15
-
-
Scavino, N.J.1
-
30
-
-
13944282626
-
Binary resource leveling model: Activity splitting allowed
-
DOI 10.1061/(ASCE)0733-9364(2004)130:6(887)
-
Son, J., and Mattila, K. G. (2004). " Binary resource leveling model: Activity splitting allowed. " J. Constr. Eng. Manage. JCEMD4 0733-9364, 130 (6), 887-894. 10.1061/(ASCE)0733-9364(2004)130:6(887) (Pubitemid 40265322)
-
(2004)
Journal of Construction Engineering and Management
, vol.130
, Issue.6
, pp. 887-894
-
-
Son, J.1
Mattila, K.G.2
-
31
-
-
33947424755
-
Temporal logic representation schema for intermediate function
-
DOI 10.1061/(ASCE)0733-9364(2007)133:4(277)
-
Song, Y., and Chua, D. K. H. (2007). " Temporal logic representation schema for intermediate function. " J. Constr. Eng. Manage. JCEMD4 0733-9364, 133 (4), 277-286. 10.1061/(ASCE)0733-9364(2007)133:4(277) (Pubitemid 46447963)
-
(2007)
Journal of Construction Engineering and Management
, vol.133
, Issue.4
, pp. 277-286
-
-
Song, Y.1
Chua, D.K.H.2
-
32
-
-
33748964278
-
The pitfalls of CPM scheduling on construction projects
-
Street, I. A. (2000). " The pitfalls of CPM scheduling on construction projects. " Cost Engineering J., AACE Int., 42 (8), 35-37.
-
(2000)
Cost Engineering J., AACE Int.
, vol.42
, Issue.8
, pp. 35-37
-
-
Street, I.A.1
-
33
-
-
63049104771
-
Industry crisis: Construction scheduling software
-
Wickwire, J. M., and Ockman, S. (2000). " Industry crisis: Construction scheduling software. " 2000 AACE Int. Trans., CDR.02.1-CDR.02.8.
-
(2000)
2000 AACE Int. Trans.
-
-
Wickwire, J.M.1
Ockman, S.2
-
34
-
-
0027574059
-
Model-based planning: Scaled-up construction application
-
Winstanley, G., Chacon, M. A., and Levitt, R. E. (1993). " Model-based planning: Scaled-up construction application. " J. Comput. Civ. Eng. JCCEE5 0887-3801, 7 (2), 199-217. 10.1061/(ASCE)0887-3801(1993)7:2(199) (Pubitemid 23640833)
-
(1993)
Journal of Computing in Civil Engineering
, vol.7
, Issue.2
, pp. 199-217
-
-
Winstanley Graham1
Chacon Michael, A.2
Levitt Raymond, E.3
|