메뉴 건너뛰기




Volumn 24, Issue , 2012, Pages 130-137

Email-based system for documenting construction as-built details

Author keywords

As built; Computer application; Construction management; Email; Progress tracking; Project control

Indexed keywords

AS-BUILT; BI-DIRECTIONAL COMMUNICATION; COMMUNICATION TOOLS; CONSTRUCTION MANAGEMENT; CORRECTIVE ACTIONS; DATA COLLECTION; ERROR PRONES; MANUAL PROCESS; PROJECT CONTROL; PROJECT PARTICIPANTS; PROTOTYPE SYSTEM; REQUESTS FOR INFORMATION; SCHEDULING APPLICATION;

EID: 84860296261     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2012.02.014     Document Type: Article
Times cited : (25)

References (33)
  • 1
    • 34948868259 scopus 로고    scopus 로고
    • Dynamic mobile RFID-based supply chain control and management system in construction
    • L.-C. Wang, Y.-C. Lin, and P.H. Lin Dynamic mobile RFID-based supply chain control and management system in construction Advanced Engineering Informatics 21 2007 377 390
    • (2007) Advanced Engineering Informatics , vol.21 , pp. 377-390
    • Wang, L.-C.1    Lin, Y.-C.2    Lin, P.H.3
  • 5
    • 33845966046 scopus 로고    scopus 로고
    • Research in automated measurement of project performance indicators
    • R. Navon Research in automated measurement of project performance indicators Journal of Automation in Construction 16 2 2007 176 188
    • (2007) Journal of Automation in Construction , vol.16 , Issue.2 , pp. 176-188
    • Navon, R.1
  • 8
    • 33847222202 scopus 로고    scopus 로고
    • Assessing research issues in automated project performance control
    • APPC
    • R. Navon, and R. Sacks Assessing research issues in automated project performance control APPC Journal of Automation in Construction 16 2007 474 484
    • (2007) Journal of Automation in Construction , vol.16 , pp. 474-484
    • Navon, R.1    Sacks, R.2
  • 10
    • 33845708588 scopus 로고    scopus 로고
    • Is detailed progress monitoring possible without designated manual data collection?
    • R. Navon, and I. Haskaya Is detailed progress monitoring possible without designated manual data collection? Construction Management and Economics 24 12 2006 1225 1229
    • (2006) Construction Management and Economics , vol.24 , Issue.12 , pp. 1225-1229
    • Navon, R.1    Haskaya, I.2
  • 13
    • 33846846204 scopus 로고    scopus 로고
    • Integrating wireless and speech technologies for synchronous on-site data collection
    • M.-K. Tsai, J.-B. Yang, and C.-Y. Lin Integrating wireless and speech technologies for synchronous on-site data collection Journal of Automation in Construction 16 2007 378 391
    • (2007) Journal of Automation in Construction , vol.16 , pp. 378-391
    • Tsai, M.-K.1    Yang, J.-B.2    Lin, C.-Y.3
  • 14
    • 67449110716 scopus 로고    scopus 로고
    • Improving communication barriers for on-site information flow: An exploratory study
    • M.-K. Tsai Improving communication barriers for on-site information flow: an exploratory study Journal of Advanced Engineering Informatics 23 2009 323 331
    • (2009) Journal of Advanced Engineering Informatics , vol.23 , pp. 323-331
    • Tsai, M.-K.1
  • 15
    • 84860288459 scopus 로고    scopus 로고
    • Influential factors of Voip adoption of top 500 export- import enterprises in Taiwan
    • C. Liao, and P. Tseng Influential factors of Voip adoption of top 500 export- import enterprises in Taiwan Journal of Contemporary Management Research 6 1 2010 11 28
    • (2010) Journal of Contemporary Management Research , vol.6 , Issue.1 , pp. 11-28
    • Liao, C.1    Tseng, P.2
  • 18
    • 1642587217 scopus 로고    scopus 로고
    • PPMS: A web-based construction project performance monitoring
    • S.O. Cheung, H.C.H. Suen, and K.K.W. Cheung PPMS: a web-based construction project performance monitoring System 13 3 2004 361 376
    • (2004) System , vol.13 , Issue.3 , pp. 361-376
    • Cheung, S.O.1    Suen, H.C.H.2    Cheung, K.K.W.3
  • 24
    • 29144515805 scopus 로고    scopus 로고
    • Automating the task of tracking the delivery and receipt of fabricated pipe spools in industrial project
    • J. Song, C. Haas, C. Caldas, E. Ergen, and B. Akinci Automating the task of tracking the delivery and receipt of fabricated pipe spools in industrial project Journal of Automation in Construction 15 2006 166 177
    • (2006) Journal of Automation in Construction , vol.15 , pp. 166-177
    • Song, J.1    Haas, C.2    Caldas, C.3    Ergen, E.4    Akinci, B.5
  • 25
    • 63049131361 scopus 로고    scopus 로고
    • Performance of automated project progress tracking with 3d data fusion
    • Québec, Canada.
    • F. Bosche, C.T. Haas, and P. Murray Performance of automated project progress tracking with 3d data fusion CSCE Annual Conference 2008 Québec, Canada.
    • (2008) CSCE Annual Conference
    • Bosche, F.1    Haas, C.T.2    Murray, P.3
  • 32
    • 0003498981 scopus 로고    scopus 로고
    • Of Transportation And Infrastructure M. Accessed online on November, 29 at Ministry of Transportation and Infrastructure British Columbia, CA
    • Ministry of Transportation and Infrastructure Standard Specifications for Highway Construction Accessed online on November, 29 at 2012 Ministry of Transportation and Infrastructure British Columbia, CA http://www.th.gov.bc.ca/ publications/const-maint/contract-serv/standard-specs/Volume-1-SS2012.pdf
    • (2012) Standard Specifications for Highway Construction


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.