-
1
-
-
34948868259
-
Dynamic mobile RFID-based supply chain control and management system in construction
-
L.-C. Wang, Y.-C. Lin, and P.H. Lin Dynamic mobile RFID-based supply chain control and management system in construction Advanced Engineering Informatics 21 2007 377 390
-
(2007)
Advanced Engineering Informatics
, vol.21
, pp. 377-390
-
-
Wang, L.-C.1
Lin, Y.-C.2
Lin, P.H.3
-
5
-
-
33845966046
-
Research in automated measurement of project performance indicators
-
R. Navon Research in automated measurement of project performance indicators Journal of Automation in Construction 16 2 2007 176 188
-
(2007)
Journal of Automation in Construction
, vol.16
, Issue.2
, pp. 176-188
-
-
Navon, R.1
-
6
-
-
77956310770
-
Novel technologies for construction field data collection
-
ICCCBE Weimar, Germany
-
T. Trupp, L. Soibelman, T.M.A. Hashash, and L.Y. Liu Novel technologies for construction field data collection International Conference on Computing in Civil and Building Engineering 10 2004 ICCCBE Weimar, Germany
-
(2004)
International Conference on Computing in Civil and Building Engineering
, vol.10
-
-
Trupp, T.1
Soibelman, L.2
Hashash, T.M.A.3
Liu, L.Y.4
-
8
-
-
33847222202
-
Assessing research issues in automated project performance control
-
APPC
-
R. Navon, and R. Sacks Assessing research issues in automated project performance control APPC Journal of Automation in Construction 16 2007 474 484
-
(2007)
Journal of Automation in Construction
, vol.16
, pp. 474-484
-
-
Navon, R.1
Sacks, R.2
-
9
-
-
84860315534
-
A project progress measurement and management system
-
S. Chin, S.-W. Yoon, Y.-S. Kim, Y.-S. Jung, S.-C. Park, and M. Chung A project progress measurement and management system Proceedings of 21st International Symposium on Automation and Robotics in Construction, Jeju, S. Korea 2004
-
(2004)
Proceedings of 21st International Symposium on Automation and Robotics in Construction, Jeju, S. Korea
-
-
Chin, S.1
Yoon, S.-W.2
Kim, Y.-S.3
Jung, Y.-S.4
Park, S.-C.5
Chung, M.6
-
10
-
-
33845708588
-
Is detailed progress monitoring possible without designated manual data collection?
-
R. Navon, and I. Haskaya Is detailed progress monitoring possible without designated manual data collection? Construction Management and Economics 24 12 2006 1225 1229
-
(2006)
Construction Management and Economics
, vol.24
, Issue.12
, pp. 1225-1229
-
-
Navon, R.1
Haskaya, I.2
-
13
-
-
33846846204
-
Integrating wireless and speech technologies for synchronous on-site data collection
-
M.-K. Tsai, J.-B. Yang, and C.-Y. Lin Integrating wireless and speech technologies for synchronous on-site data collection Journal of Automation in Construction 16 2007 378 391
-
(2007)
Journal of Automation in Construction
, vol.16
, pp. 378-391
-
-
Tsai, M.-K.1
Yang, J.-B.2
Lin, C.-Y.3
-
14
-
-
67449110716
-
Improving communication barriers for on-site information flow: An exploratory study
-
M.-K. Tsai Improving communication barriers for on-site information flow: an exploratory study Journal of Advanced Engineering Informatics 23 2009 323 331
-
(2009)
Journal of Advanced Engineering Informatics
, vol.23
, pp. 323-331
-
-
Tsai, M.-K.1
-
15
-
-
84860288459
-
Influential factors of Voip adoption of top 500 export- import enterprises in Taiwan
-
C. Liao, and P. Tseng Influential factors of Voip adoption of top 500 export- import enterprises in Taiwan Journal of Contemporary Management Research 6 1 2010 11 28
-
(2010)
Journal of Contemporary Management Research
, vol.6
, Issue.1
, pp. 11-28
-
-
Liao, C.1
Tseng, P.2
-
18
-
-
1642587217
-
PPMS: A web-based construction project performance monitoring
-
S.O. Cheung, H.C.H. Suen, and K.K.W. Cheung PPMS: a web-based construction project performance monitoring System 13 3 2004 361 376
-
(2004)
System
, vol.13
, Issue.3
, pp. 361-376
-
-
Cheung, S.O.1
Suen, H.C.H.2
Cheung, K.K.W.3
-
20
-
-
61849118915
-
Applications of converged networks in construction
-
S. Ahsan, A. El-Hamalawi, D. Bouchlaghem, and S. Ahmad Applications of converged networks in construction International Journal of Product Development 7 3/4 2009 281 300
-
(2009)
International Journal of Product Development
, vol.7
, Issue.3-4
, pp. 281-300
-
-
Ahsan, S.1
El-Hamalawi, A.2
Bouchlaghem, D.3
Ahmad, S.4
-
24
-
-
29144515805
-
Automating the task of tracking the delivery and receipt of fabricated pipe spools in industrial project
-
J. Song, C. Haas, C. Caldas, E. Ergen, and B. Akinci Automating the task of tracking the delivery and receipt of fabricated pipe spools in industrial project Journal of Automation in Construction 15 2006 166 177
-
(2006)
Journal of Automation in Construction
, vol.15
, pp. 166-177
-
-
Song, J.1
Haas, C.2
Caldas, C.3
Ergen, E.4
Akinci, B.5
-
25
-
-
63049131361
-
Performance of automated project progress tracking with 3d data fusion
-
Québec, Canada.
-
F. Bosche, C.T. Haas, and P. Murray Performance of automated project progress tracking with 3d data fusion CSCE Annual Conference 2008 Québec, Canada.
-
(2008)
CSCE Annual Conference
-
-
Bosche, F.1
Haas, C.T.2
Murray, P.3
-
32
-
-
0003498981
-
-
Of Transportation And Infrastructure M. Accessed online on November, 29 at Ministry of Transportation and Infrastructure British Columbia, CA
-
Ministry of Transportation and Infrastructure Standard Specifications for Highway Construction Accessed online on November, 29 at 2012 Ministry of Transportation and Infrastructure British Columbia, CA http://www.th.gov.bc.ca/ publications/const-maint/contract-serv/standard-specs/Volume-1-SS2012.pdf
-
(2012)
Standard Specifications for Highway Construction
-
-
|