Site-level facilities layout using genetic algorithms
-
H. Li, P.E.D. Love, Site-lever facilities layout using genetic algorithms, Journal of Com-puting in Civil Engineering 12 (4) (1998) 227-231. (Pubitemid 128497199)
-
(1998)
Journal of Computing in Civil Engineering
, vol.12
, Issue.4
, pp. 227-231
-
-
Li, H.1
Love, P.E.D.2
-
2
-
-
0033880829
-
Genetic search for solving construction site-level unequal-area facility layout problems
-
DOI 10.1016/S0926-5805(99)00006-0
-
H. Li, P.E.D. Love, Genetic search for solving construction site-level unequal-area facility layout problems, Automation in Construction 9 (2) (2000) 217-226. (Pubitemid 30541681)
-
(2000)
Automation in construction
, vol.9
, Issue.2
, pp. 217-226
-
-
Li, H.1
Love, P.E.D.2
-
3
-
-
0036028136
-
Site pre-cast yard layout arrangement through genetic algorithms
-
S.O. Cheung, T.K.L. Tong, C.M. Tam, Site pre-cast yard layout arrangement through genetic algorithms, Automation in Construction 11 (1) (2002) 35-46.
-
(2002)
Automation in Construction
, vol.11
, Issue.1
, pp. 35-46
-
-
Cheung, S.O.1
Tong, T.K.L.2
Tam, C.M.3
-
4
-
-
15744404885
-
Application of the entropy technique and genetic algorithms to construction site layout planning of medium-size projects
-
DOI 10.1080/0144619042000202834
-
K.C. Lam, C.M. Tang, W.C. Lee, Application of the entropy technique and genetic algorithms to construction site layout planning of medium-size projects, Construction Management and Economics 23 (2) (2005) 127-145. (Pubitemid 40413035)
-
(2005)
Construction Management and Economics
, vol.23
, Issue.2
, pp. 127-145
-
-
Lam, K.C.1
Tang, C.M.2
Lee, W.C.3
-
5
-
-
34248344222
-
The application of the ant colony optimization algorithm to the construction site layout planning problem
-
DOI 10.1080/01446190600972870, PII 778091851
-
K.C. Lam, X. Ning, T. Ng, The application of the ant colony optimization algorithm to the construction site layout planning problem, Construction Management and Economics 25 (4) (2007) 359-374. (Pubitemid 46730776)
-
(2007)
Construction Management and Economics
, vol.25
, Issue.4
, pp. 359-374
-
-
Lam, K.-C.1
Ning, X.2
Ng, T.3
-
6
-
-
45749148242
-
Optimal construction site layout considering safety and environmental aspects
-
H.M. Sanad, M.A. Ammar, M.E. Ibrahim, Optimal construction site layout considering safety and environmental aspects, Journal of Construction Engineering and Management 134 (7) (2008) 536-544.
-
(2008)
Journal of Construction Engineering and Management
, vol.134
, Issue.7
, pp. 536-544
-
-
Sanad, H.M.1
Ammar, M.A.2
Ibrahim, M.E.3
-
7
-
-
13944281386
-
Dynamic layout of construction temporary facilities considering safety
-
DOI 10.1061/(ASCE)0733-9364(2004)130:4(534)
-
E. Elbeltagi, T. Hegazy, A. Eldosouky, Dynamic layoutofconstruction temporary facilities considering safety, Journal of Construction Engineering and Management 130 (4) (2004) 534-541. (Pubitemid 40265350)
-
(2004)
Journal of Construction Engineering and Management
, vol.130
, Issue.4
, pp. 534-541
-
-
Elbeltagi, E.1
Hegazy, T.2
Eldosouky, A.3
-
10
-
-
0029344681
-
Construction-site layout using annealed neural network
-
I.C. Yeh, Construction-site layout using annealed neural network, Journal of Computing in Civil Engineering 9 (3) (1995) 201-208.
-
(1995)
Journal of Computing in Civil Engineering
, vol.9
, Issue.3
, pp. 201-208
-
-
Yeh, I.C.1
-
11
-
-
0035501643
-
Schedule-dependent evolution of site layout planning
-
DOI 10.1080/01446190110066713
-
E. Elbeltagi, T. Hagazy, A.H. Hosny, A. Eldosouky, Schedule-dependent evolution of site layout planning, Construction Management and Economics 19 (7) (2001) 689-697. (Pubitemid 32914379)
-
(2001)
Construction Management and Economics
, vol.19
, Issue.7
, pp. 689-697
-
-
Elbeltagi, E.1
Hegazy, T.2
Hosny, A.H.3
Eldosouky, A.4
-
12
-
-
0003177289
-
Location and layout planning
-
W. Domschke, G. Krispin, Location and layout planning, OR Spectrum 19 (3) (1997) 181-194.
-
(1997)
OR Spectrum
, vol.19
, Issue.3
, pp. 181-194
-
-
Domschke, W.1
Krispin, G.2
-
13
-
-
57349154143
-
An introduction to ant colony optimization
-
Universite Libre de Bruxelles, Brussels
-
M. Dorigo, K. Socha, An Introduction to Ant Colony Optimization, Technical Report IRIDIA/2006-010, Universite Libre de Bruxelles, Brussels, 1994.
-
(1994)
Technical Report IRIDIA/2006-010
-
-
Dorigo, M.1
Socha, K.2
-
14
-
-
0004180566
-
The ant system applied to the quadratic assignment problem
-
Universite Libre de Bruxelles, Brussels
-
V. Maniezzo, A. Colorni, M. Dorigo, The Ant System Applied to the Quadratic Assignment Problem, Technical Report IRIDIA/94-28, Universite Libre de Bruxelles, Brussels, 1994.
-
(1994)
Technical Report IRIDIA/94-28
-
-
Maniezzo, V.1
Colorni, A.2
Dorigo, M.3
-
15
-
-
84878356631
-
Site layout of temporary construction facilities using ant colony optimization
-
Los Angeles
-
S.A. Samdani, L. Bhakal, A.K. Singh, Site layout of temporary construction facilities using ant colony optimization, Proc., 4th Int. Engineering and Construction Conf., ASCE Los Angeles Section, Los Angeles, 2006, pp. 1-10.
-
(2006)
Proc., 4th Int. Engineering and Construction Conf., ASCE Los Angeles Section
, pp. 1-10
-
-
Samdani, S.A.1
Bhakal, L.2
Singh, A.K.3
-
16
-
-
69949094700
-
Dynamic construction site layout using ant colony optimization
-
Transportation Research Board, Washington DC, United States
-
Y. AbdelRazig, M. El-Gafy, A. Ghanem, Dynamic construction site layout using ant colony optimization, Transportation Research Board 85th Annual Meeting, Transportation Research Board, Washington DC, United States, 2006, pp. 1-11.
-
(2006)
Transportation Research Board 85th Annual Meeting
, pp. 1-11
-
-
AbdelRazig, Y.1
El-Gafy, M.2
Ghanem, A.3
-
18
-
-
15744382924
-
One ant colony algorithm for solving multi-objective optimization problems
-
Y.D. Zhang, S.B. Huang, One ant colony algorithm for solving multi-objective optimization problems, Control and Decision 20 (2) (2005) 170-176.
-
(2005)
Control and Decision
, vol.20
, Issue.2
, pp. 170-176
-
-
Zhang, Y.D.1
Huang, S.B.2
|