-
1
-
-
0027554652
-
Designing for the environment
-
S. Ashley Designing for the environment Mechanical Engineering 115 3 1993 52-55
-
(1993)
Mechanical Engineering
, vol.115
, Issue.3
, pp. 52-55
-
-
Ashley, S.1
-
2
-
-
0012651208
-
An annotated essay: Environmental affairs
-
R.Y. Bergstrom An annotated essay: Environmental affairs Production 105 4 1993 36-41
-
(1993)
Production
, vol.105
, Issue.4
, pp. 36-41
-
-
Bergstrom, R.Y.1
-
8
-
-
0017538789
-
Optimal disposal policies for a single-item inventory system with returns
-
D.P. Heyman Optimal disposal policies for a single-item inventory system with returns Naval Research Logistics Quarterly 24 1997 385-405
-
(1997)
Naval Research Logistics Quarterly
, vol.24
, pp. 385-405
-
-
Heyman, D.P.1
-
9
-
-
0011728867
-
Modeling period review control for a stochastic product recovery problem with remanufacturing and procurement leadtimes
-
Working paper 2/96. Faculty of Economics and Management, University of Magdeburg, Germany
-
Inderfurth K. 1996 Modeling period review control for a stochastic product recovery problem with remanufacturing and procurement leadtimes. Working paper 2/96. Faculty of Economics and Management, University of Magdeburg, Germany
-
(1996)
-
-
Inderfurth, K.1
-
10
-
-
0000683467
-
Simple optimal replenishment and disposal policies for a product recovery system with leadtimes
-
K. Inderfurth Simple optimal replenishment and disposal policies for a product recovery system with leadtimes OR Spektrum 19 1997 111-122
-
(1997)
OR Spektrum
, vol.19
, pp. 111-122
-
-
Inderfurth, K.1
-
11
-
-
0024944968
-
Purchasing policy of new containers considering the random returns of previously issued containers
-
P. Kelly E.A. Silver Purchasing policy of new containers considering the random returns of previously issued containers IIE Transactions 21 1989 349-354
-
(1989)
IIE Transactions
, vol.21
, pp. 349-354
-
-
Kelly, P.1
Silver, E.A.2
-
12
-
-
0037449040
-
A new approach for controlling a hybrid stochastic manufacturing/ remanufacturing system with inventories and different leadtimes
-
G.P. Kiesmuller A new approach for controlling a hybrid stochastic manufacturing/remanufacturing system with inventories and different leadtimes European Journal of Operational Research 147 2003 62-71
-
(2003)
European Journal of Operational Research
, vol.147
, pp. 62-71
-
-
Kiesmuller, G.P.1
-
17
-
-
0038536215
-
Weighted optimization for multiobjective full-information control problems
-
S. Rangan K. Poola Weighted optimization for multiobjective full-information control problems Systems and Control Letters 31 1997 207-213
-
(1997)
Systems and Control Letters
, vol.31
, pp. 207-213
-
-
Rangan, S.1
Poola, K.2
-
18
-
-
0030572943
-
The EOQ repair and waste disposal model with variable setup numbers
-
K. Richter The EOQ repair and waste disposal model with variable setup numbers European Journal of Operational Research 95 1996a 313-324
-
(1996)
European Journal of Operational Research
, vol.95
, pp. 313-324
-
-
Richter, K.1
-
19
-
-
0030206702
-
The extended EOQ repair and waste disposal model
-
K. Richter The extended EOQ repair and waste disposal model International Journal of Production Economics 45 1-3 1996b 443-448
-
(1996)
International Journal of Production Economics
, vol.45
, Issue.1-3
, pp. 443-448
-
-
Richter, K.1
-
21
-
-
0000591102
-
A deterministic inventory model for repairable items
-
D.A. Schrady A deterministic inventory model for repairable items Naval Research Logistics Quarterly 14 1967 391-398
-
(1967)
Naval Research Logistics Quarterly
, vol.14
, pp. 391-398
-
-
Schrady, D.A.1
-
22
-
-
0017948545
-
Optimal solution structure for a repairable inventory problem
-
V.P. Simpson Optimal solution structure for a repairable inventory problem Operations Research 26 2 1978 270-281
-
(1978)
Operations Research
, vol.26
, Issue.2
, pp. 270-281
-
-
Simpson, V.P.1
-
24
-
-
0031251420
-
Production planning and inventory control with remanufacturing and disposal
-
E. van der Laan M. Salomon Production planning and inventory control with remanufacturing and disposal European Journal of Operational Research 102 2 1997 264-278
-
(1997)
European Journal of Operational Research
, vol.102
, Issue.2
, pp. 264-278
-
-
van der Laan, E.1
Salomon, M.2
-
25
-
-
0345253867
-
An investigation of lead-time effects in manufacturing/remanufacturing system under simple PUSH and PULL control strategies
-
E. van der Laan M. Salomon An investigation of lead-time effects in manufacturing/remanufacturing system under simple PUSH and PULL control strategies European Journal of Operational Research 115 1 1999 195-214
-
(1999)
European Journal of Operational Research
, vol.115
, Issue.1
, pp. 195-214
-
-
van der Laan, E.1
Salomon, M.2
-
28
-
-
84939004610
-
Optimality and non-scalar-valued performance criteria
-
L. Zadeh Optimality and non-scalar-valued performance criteria IEEE Transactions on Automatic Control 8 1 1963 59-60
-
(1963)
IEEE Transactions on Automatic Control
, vol.8
, Issue.1
, pp. 59-60
-
-
Zadeh, L.1
|