PERT-type projects: Time–cost tradeoffs under uncertainty

Author keywords

Monte Carlo simulations; PERT statistical approach; stochastic time cost tradeoffs; time chance constraint

Indexed keywords

ALTERNATIVE PROCEDURES; CHANCE CONSTRAINT; EXTERNAL UNCERTAINTIES; MONTE CARLO SIMULATIONS; PROJECT COMPLETION TIME; STATISTICAL APPROACH; STOCHASTIC PROCEDURE; TIME-COST TRADEOFF;

EID: 84876060147     PISSN: 00375497     EISSN: 17413133     Source Type: Journal    
DOI: 10.1177/0037549711428341     Document Type: Article
Times cited : (10)

References (51)
  • 1
    • 85044160449 scopus 로고
    • Critical path planning and scheduling
    • Proceedings of the Eastern Joint Computer Conference Boston MA
    • Kelley J.E. Jr Walker M.R. Critical path planning and scheduling. In Proceedings of the Eastern Joint Computer Conference, Boston MA, 1959, pp. 160–173.
    • (1959) , pp. 160-173
    • Kelley, J.E.1    Walker, M.R.2
  • 2
    • 0001620447 scopus 로고
    • Critical path planning and scheduling: mathematical basis
    • Kelley J.E. Jr. Critical path planning and scheduling: mathematical basis. Operations Res 1961; 9: 296–320.
    • (1961) Operations Res , vol.9 , pp. 296-320
    • Kelley, J.E.1
  • 3
    • 0001501655 scopus 로고
    • Application of technique for research and development program evaluation (PERT)
    • Malcolm D.G. Roseboom J.H. Clark C.E. Fazar W. Application of technique for research and development program evaluation (PERT). Operations Res 1959; 7: 646–669.
    • (1959) Operations Res , vol.7 , pp. 646-669
    • Malcolm, D.G.1    Roseboom, J.H.2    Clark, C.E.3    Fazar, W.4
  • 4
    • 0037349305 scopus 로고    scopus 로고
    • Activity time–cost tradeoffs under time and cost chance constraints
    • Laslo Z. Activity time–cost tradeoffs under time and cost chance constraints. Comput Indust Engng 2003; 44: 365–384.
    • (2003) Comput Indust Engng , vol.44 , pp. 365-384
    • Laslo, Z.1
  • 5
    • 13444274538 scopus 로고    scopus 로고
    • On the fallacy of averages in project risk management
    • Elmaghraby S.E. On the fallacy of averages in project risk management. Eur J Operational Res 2005; 165: 307–313.
    • (2005) Eur J Operational Res , vol.165 , pp. 307-313
    • Elmaghraby, S.E.1
  • 6
    • 0036027411 scopus 로고    scopus 로고
    • A review on the contribution of operational research to project management
    • Tavares L.V. A review on the contribution of operational research to project management. Eur J Operational Res 2002; 136: 1–18.
    • (2002) Eur J Operational Res , vol.136 , pp. 1-18
    • Tavares, L.V.1
  • 7
    • 0000439471 scopus 로고
    • Optimal time–cost tradeoffs in GERT networks
    • Arisawa S. Elmaghraby S.E. Optimal time–cost tradeoffs in GERT networks. Management Sci 1972; 18: 589–599.
    • (1972) Management Sci , vol.18 , pp. 589-599
    • Arisawa, S.1    Elmaghraby, S.E.2
  • 8
    • 0016950488 scopus 로고
    • Bayesian point estimation and the PERT scheduling of stochastic activities
    • Britney R.R. Bayesian point estimation and the PERT scheduling of stochastic activities. Management Sci 1976; 22: 938–948.
    • (1976) Management Sci , vol.22 , pp. 938-948
    • Britney, R.R.1
  • 10
    • 0002099673 scopus 로고
    • Judgment estimates of the moments of PERT type distributions
    • Moder J.J. Rodgers E.G. Judgment estimates of the moments of PERT type distributions. Management Sci 1968; 15: 76–83.
    • (1968) Management Sci , vol.15 , pp. 76-83
    • Moder, J.J.1    Rodgers, E.G.2
  • 11
    • 0010360181 scopus 로고
    • Subjective time estimates in critical path planning – a preliminary analysis
    • King W.R. Wilson T.A. Subjective time estimates in critical path planning – a preliminary analysis. Management Sci 1967; 13: 307–320.
    • (1967) Management Sci , vol.13 , pp. 307-320
    • King, W.R.1    Wilson, T.A.2
  • 12
    • 84876035974 scopus 로고
    • Subjective estimates and scheduling decisions
    • Abernathy W.J. Subjective estimates and scheduling decisions. Management Sci 1971; 18: 80–88.
    • (1971) Management Sci , vol.18 , pp. 80-88
    • Abernathy, W.J.1
  • 15
    • 0001287631 scopus 로고
    • Expected critical path lengths in PERT networks
    • Fulkerson D.R. Expected critical path lengths in PERT networks. Operations Res 1962; 10: 808–817.
    • (1962) Operations Res , vol.10 , pp. 808-817
    • Fulkerson, D.R.1
  • 16
    • 0005350580 scopus 로고
    • Critical path analysis via chance constrained and stochastic programming
    • Charnes A. Cooper W.W. Thompson G.L. Critical path analysis via chance constrained and stochastic programming. Operations Res 1964; 12: 460–470.
    • (1964) Operations Res , vol.12 , pp. 460-470
    • Charnes, A.1    Cooper, W.W.2    Thompson, G.L.3
  • 17
    • 0003107787 scopus 로고
    • Distribution of the time through a directed acyclic network
    • Martin J.J. Distribution of the time through a directed acyclic network. Operations Res 1965; 13: 46–66.
    • (1965) Operations Res , vol.13 , pp. 46-66
    • Martin, J.J.1
  • 18
    • 0000788322 scopus 로고
    • On the expected duration of PERT type networks
    • Elmaghraby S.E. On the expected duration of PERT type networks. Management Sci 1967; 13: 299–306.
    • (1967) Management Sci , vol.13 , pp. 299-306
    • Elmaghraby, S.E.1
  • 19
    • 0001082875 scopus 로고
    • Expected completion time in PERT networks
    • Robillard P. Trahan M. Expected completion time in PERT networks. Operations Res 1976; 24: 177–182.
    • (1976) Operations Res , vol.24 , pp. 177-182
    • Robillard, P.1    Trahan, M.2
  • 20
    • 0022099676 scopus 로고
    • Approximating the distribution function in stochastic networks
    • Dodin B. Approximating the distribution function in stochastic networks. Operations Res 1985; 33: 862–881.
    • (1985) Operations Res , vol.33 , pp. 862-881
    • Dodin, B.1
  • 21
    • 0034559444 scopus 로고    scopus 로고
    • On criticality and sensitivity in activity networks
    • Elmaghraby S.E. On criticality and sensitivity in activity networks. Eur J Operational Res 2000; 127: 220–238.
    • (2000) Eur J Operational Res , vol.127 , pp. 220-238
    • Elmaghraby, S.E.1
  • 22
    • 0033891504 scopus 로고    scopus 로고
    • Project duration in stochastic networks by the PERT-path technique
    • Pontrandolfo P. Project duration in stochastic networks by the PERT-path technique. Int J Project Management 2000; 18: 215–222.
    • (2000) Int J Project Management , vol.18 , pp. 215-222
    • Pontrandolfo, P.1
  • 23
    • 0034326162 scopus 로고    scopus 로고
    • The exact overall time distribution of a project with uncertain task durations
    • Schmit C.W. Grossmann I.E. The exact overall time distribution of a project with uncertain task durations. Eur J Operational Res 2000; 126: 614–636.
    • (2000) Eur J Operational Res , vol.126 , pp. 614-636
    • Schmit, C.W.1    Grossmann, I.E.2
  • 24
    • 0347069898 scopus 로고    scopus 로고
    • Computing bounds on project duration distributions for stochastic PERT networks
    • Iida T. Computing bounds on project duration distributions for stochastic PERT networks. Naval Res Logistics 2000; 47: 559–580.
    • (2000) Naval Res Logistics , vol.47 , pp. 559-580
    • Iida, T.1
  • 25
    • 0035480326 scopus 로고    scopus 로고
    • The prediction and control of project duration: a recursive model
    • Hardie N. The prediction and control of project duration: a recursive model. Int J Project Management 2001; 19: 401–409.
    • (2001) Int J Project Management , vol.19 , pp. 401-409
    • Hardie, N.1
  • 26
    • 34249865056 scopus 로고    scopus 로고
    • A new approximation algorithm for obtaining the probability distribution function for project completion time
    • Yao M.J. Chu W.M. A new approximation algorithm for obtaining the probability distribution function for project completion time. Comput Math Appl 2007; 54: 282–295.
    • (2007) Comput Math Appl , vol.54 , pp. 282-295
    • Yao, M.J.1    Chu, W.M.2
  • 27
    • 35349009933 scopus 로고    scopus 로고
    • Lower bound for the mean project completion time in dynamic PERT networks
    • Azaron A. Fatemi-Ghomi SMT. Lower bound for the mean project completion time in dynamic PERT networks. Eur J Operational Res 2008; 186: 120–127.
    • (2008) Eur J Operational Res , vol.186 , pp. 120-127
    • Azaron, A.1    Fatemi-Ghomi, S.M.T.2
  • 31
    • 0028517058 scopus 로고
    • A stochastic model to control project duration and expenditure
    • Tavares L.V. A stochastic model to control project duration and expenditure. Eur J Operational Res 1994; 78: 262–266.
    • (1994) Eur J Operational Res , vol.78 , pp. 262-266
    • Tavares, L.V.1
  • 32
    • 7444231051 scopus 로고    scopus 로고
    • Project risk management: lessons learned from software development environment
    • Kwak Y.H. Stoddard J.J. Project risk management: lessons learned from software development environment. Technovation 2004; 24: 915–920.
    • (2004) Technovation , vol.24 , pp. 915-920
    • Kwak, Y.H.1    Stoddard, J.J.2
  • 33
    • 36849065885 scopus 로고    scopus 로고
    • Minimizing project completion time with execution set method
    • Laslo Z. Keren B. Ilani H. Minimizing project completion time with execution set method. Eur J Operational Res 2008; 187: 1513–1519.
    • (2008) Eur J Operational Res , vol.187 , pp. 1513-1519
    • Laslo, Z.1    Keren, B.2    Ilani, H.3
  • 34
    • 84993684138 scopus 로고    scopus 로고
    • A lower bound for project completion time attained by detailing project tasks and redistributing workloads
    • Laslo Z. Ilani H. Keren B. A lower bound for project completion time attained by detailing project tasks and redistributing workloads. J Appl Quantitative Meth 2009; 4: 345–358.
    • (2009) J Appl Quantitative Meth , vol.4 , pp. 345-358
    • Laslo, Z.1    Ilani, H.2    Keren, B.3
  • 35
    • 19244376018 scopus 로고
    • A simple CPM time–cost tradeoff algorithm
    • Siemens N. A simple CPM time–cost tradeoff algorithm. Management Sci 1971; 17: 354–363.
    • (1971) Management Sci , vol.17 , pp. 354-363
    • Siemens, N.1
  • 36
    • 0027642129 scopus 로고
    • A two-level decision-making model for controlling stochastic projects
    • Golenko-Ginzburg D. A two-level decision-making model for controlling stochastic projects. Int J Production Econ 1993; 32: 117–127.
    • (1993) Int J Production Econ , vol.32 , pp. 117-127
    • Golenko-Ginzburg, D.1
  • 37
    • 33846896858 scopus 로고    scopus 로고
    • Minimal budget for activities chain with chance constrained lead-time
    • Laslo Z. Gurevich G. Minimal budget for activities chain with chance constrained lead-time. Int J Production Econ 2007; 107: 164–172.
    • (2007) Int J Production Econ , vol.107 , pp. 164-172
    • Laslo, Z.1    Gurevich, G.2
  • 38
    • 3743050163 scopus 로고    scopus 로고
    • Large-scale project management is risk management
    • Charette N. Large-scale project management is risk management. IEEE Software 1996; 13: 110–117.
    • (1996) IEEE Software , vol.13 , pp. 110-117
    • Charette, N.1
  • 39
    • 0029256275 scopus 로고
    • Manage risk in product and process development and avoid unpleasant surprises
    • Coppendale J. Manage risk in product and process development and avoid unpleasant surprises. Engng Management J 1995; 5: 35–38.
    • (1995) Engng Management J , vol.5 , pp. 35-38
    • Coppendale, J.1
  • 40
    • 0030165699 scopus 로고    scopus 로고
    • A review of existing models for project planning and estimation and the need for a new approach
    • Chatzoglou P.D. Macaulay L.A. A review of existing models for project planning and estimation and the need for a new approach. Int J Project Management 1996; 14: 173–183.
    • (1996) Int J Project Management , vol.14 , pp. 173-183
    • Chatzoglou, P.D.1    Macaulay, L.A.2
  • 41
    • 0000181338 scopus 로고
    • A network flow computation for project cost curves
    • Fulkerson D.R. A network flow computation for project cost curves. Management Sci 1961; 7: 167–178.
    • (1961) Management Sci , vol.7 , pp. 167-178
    • Fulkerson, D.R.1
  • 42
    • 0024063984 scopus 로고
    • On the distribution of activity time in PERT
    • Golenko-Ginzburg D. On the distribution of activity time in PERT. J Operational Res Soc 1988; 39: 767–771.
    • (1988) J Operational Res Soc , vol.39 , pp. 767-771
    • Golenko-Ginzburg, D.1
  • 43
    • 84985793992 scopus 로고
    • On the generality of the PERT average time formula
    • Troutt M.D. On the generality of the PERT average time formula. Decision Sci 1989; 20: 410–412.
    • (1989) Decision Sci , vol.20 , pp. 410-412
    • Troutt, M.D.1
  • 44
    • 84989485361 scopus 로고
    • Assessing the extremes of probability distributions by the fractile method
    • Selvidge J.E. Assessing the extremes of probability distributions by the fractile method. Decision Sci 1980; 11: 493–502.
    • (1980) Decision Sci , vol.11 , pp. 493-502
    • Selvidge, J.E.1
  • 45
    • 0030108497 scopus 로고    scopus 로고
    • A simple and logical alternative for making PERT time estimates
    • Lau A.H.L. Lau H.S. Zhang Y. A simple and logical alternative for making PERT time estimates. IIE Transactions 1996; 28: 183–192.
    • (1996) IIE Transactions , vol.28 , pp. 183-192
    • Lau, A.H.L.1    Lau, H.S.2    Zhang, Y.3
  • 46
    • 0000738834 scopus 로고
    • Monte Carlo methods and the PERT problem
    • Van Slyke R.M. Monte Carlo methods and the PERT problem. Operations Res 1963; 11: 839–860.
    • (1963) Operations Res , vol.11 , pp. 839-860
    • Van Slyke, R.M.1
  • 47
    • 0018738242 scopus 로고
    • The use of cutest in Monte Carlo analysis of stochastic networks
    • Sigal C.E. Pritsker A.B. Solberg J.J. The use of cutest in Monte Carlo analysis of stochastic networks. Math Comput Sim 1979; 21: 379–384.
    • (1979) Math Comput Sim , vol.21 , pp. 379-384
    • Sigal, C.E.1    Pritsker, A.B.2    Solberg, J.J.3
  • 48
    • 0021469459 scopus 로고
    • Determining the K most critical path in PERT networks
    • Dodin B. Determining the K most critical path in PERT networks. Operations Res 1984; 32: 859-877.
    • (1984) Operations Res , vol.32 , pp. 859-877
    • Dodin, B.1
  • 49
    • 0026854670 scopus 로고
    • Criticality in stochastic networks
    • Williams T.M. Criticality in stochastic networks. J Operational Res Soc 1992; 43: 353–357.
    • (1992) J Operational Res Soc , vol.43 , pp. 353-357
    • Williams, T.M.1
  • 51
    • 0030788844 scopus 로고    scopus 로고
    • A project scheduling problem library: OR software – ORSEP Operations Research Software Exchange Program
    • Kolisch R. Sprecher A. A project scheduling problem library: OR software – ORSEP Operations Research Software Exchange Program. Eur J Operational Res 1997; 96: 203–216.
    • (1997) Eur J Operational Res , vol.96 , pp. 203-216
    • Kolisch, R.1    Sprecher, A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.