1
-
-
85044160449
-
Critical path planning and scheduling
-
Proceedings of the Eastern Joint Computer Conference Boston MA
-
Kelley J.E. Jr Walker M.R. Critical path planning and scheduling. In Proceedings of the Eastern Joint Computer Conference, Boston MA, 1959, pp. 160–173.
-
(1959)
, pp. 160-173
-
-
Kelley, J.E.1
Walker, M.R.2
-
2
-
-
0001620447
-
Critical path planning and scheduling: mathematical basis
-
Kelley J.E. Jr. Critical path planning and scheduling: mathematical basis. Operations Res 1961; 9: 296–320.
-
(1961)
Operations Res
, vol.9
, pp. 296-320
-
-
Kelley, J.E.1
-
3
-
-
0001501655
-
Application of technique for research and development program evaluation (PERT)
-
Malcolm D.G. Roseboom J.H. Clark C.E. Fazar W. Application of technique for research and development program evaluation (PERT). Operations Res 1959; 7: 646–669.
-
(1959)
Operations Res
, vol.7
, pp. 646-669
-
-
Malcolm, D.G.1
Roseboom, J.H.2
Clark, C.E.3
Fazar, W.4
-
4
-
-
0037349305
-
Activity time–cost tradeoffs under time and cost chance constraints
-
Laslo Z. Activity time–cost tradeoffs under time and cost chance constraints. Comput Indust Engng 2003; 44: 365–384.
-
(2003)
Comput Indust Engng
, vol.44
, pp. 365-384
-
-
Laslo, Z.1
-
5
-
-
13444274538
-
On the fallacy of averages in project risk management
-
Elmaghraby S.E. On the fallacy of averages in project risk management. Eur J Operational Res 2005; 165: 307–313.
-
(2005)
Eur J Operational Res
, vol.165
, pp. 307-313
-
-
Elmaghraby, S.E.1
-
6
-
-
0036027411
-
A review on the contribution of operational research to project management
-
Tavares L.V. A review on the contribution of operational research to project management. Eur J Operational Res 2002; 136: 1–18.
-
(2002)
Eur J Operational Res
, vol.136
, pp. 1-18
-
-
Tavares, L.V.1
-
7
-
-
0000439471
-
Optimal time–cost tradeoffs in GERT networks
-
Arisawa S. Elmaghraby S.E. Optimal time–cost tradeoffs in GERT networks. Management Sci 1972; 18: 589–599.
-
(1972)
Management Sci
, vol.18
, pp. 589-599
-
-
Arisawa, S.1
Elmaghraby, S.E.2
-
8
-
-
0016950488
-
Bayesian point estimation and the PERT scheduling of stochastic activities
-
Britney R.R. Bayesian point estimation and the PERT scheduling of stochastic activities. Management Sci 1976; 22: 938–948.
-
(1976)
Management Sci
, vol.22
, pp. 938-948
-
-
Britney, R.R.1
-
10
-
-
0002099673
-
Judgment estimates of the moments of PERT type distributions
-
Moder J.J. Rodgers E.G. Judgment estimates of the moments of PERT type distributions. Management Sci 1968; 15: 76–83.
-
(1968)
Management Sci
, vol.15
, pp. 76-83
-
-
Moder, J.J.1
Rodgers, E.G.2
-
11
-
-
0010360181
-
Subjective time estimates in critical path planning – a preliminary analysis
-
King W.R. Wilson T.A. Subjective time estimates in critical path planning – a preliminary analysis. Management Sci 1967; 13: 307–320.
-
(1967)
Management Sci
, vol.13
, pp. 307-320
-
-
King, W.R.1
Wilson, T.A.2
-
12
-
-
84876035974
-
Subjective estimates and scheduling decisions
-
Abernathy W.J. Subjective estimates and scheduling decisions. Management Sci 1971; 18: 80–88.
-
(1971)
Management Sci
, vol.18
, pp. 80-88
-
-
Abernathy, W.J.1
-
15
-
-
0001287631
-
Expected critical path lengths in PERT networks
-
Fulkerson D.R. Expected critical path lengths in PERT networks. Operations Res 1962; 10: 808–817.
-
(1962)
Operations Res
, vol.10
, pp. 808-817
-
-
Fulkerson, D.R.1
-
16
-
-
0005350580
-
Critical path analysis via chance constrained and stochastic programming
-
Charnes A. Cooper W.W. Thompson G.L. Critical path analysis via chance constrained and stochastic programming. Operations Res 1964; 12: 460–470.
-
(1964)
Operations Res
, vol.12
, pp. 460-470
-
-
Charnes, A.1
Cooper, W.W.2
Thompson, G.L.3
-
17
-
-
0003107787
-
Distribution of the time through a directed acyclic network
-
Martin J.J. Distribution of the time through a directed acyclic network. Operations Res 1965; 13: 46–66.
-
(1965)
Operations Res
, vol.13
, pp. 46-66
-
-
Martin, J.J.1
-
18
-
-
0000788322
-
On the expected duration of PERT type networks
-
Elmaghraby S.E. On the expected duration of PERT type networks. Management Sci 1967; 13: 299–306.
-
(1967)
Management Sci
, vol.13
, pp. 299-306
-
-
Elmaghraby, S.E.1
-
19
-
-
0001082875
-
Expected completion time in PERT networks
-
Robillard P. Trahan M. Expected completion time in PERT networks. Operations Res 1976; 24: 177–182.
-
(1976)
Operations Res
, vol.24
, pp. 177-182
-
-
Robillard, P.1
Trahan, M.2
-
20
-
-
0022099676
-
Approximating the distribution function in stochastic networks
-
Dodin B. Approximating the distribution function in stochastic networks. Operations Res 1985; 33: 862–881.
-
(1985)
Operations Res
, vol.33
, pp. 862-881
-
-
Dodin, B.1
-
21
-
-
0034559444
-
On criticality and sensitivity in activity networks
-
Elmaghraby S.E. On criticality and sensitivity in activity networks. Eur J Operational Res 2000; 127: 220–238.
-
(2000)
Eur J Operational Res
, vol.127
, pp. 220-238
-
-
Elmaghraby, S.E.1
-
22
-
-
0033891504
-
Project duration in stochastic networks by the PERT-path technique
-
Pontrandolfo P. Project duration in stochastic networks by the PERT-path technique. Int J Project Management 2000; 18: 215–222.
-
(2000)
Int J Project Management
, vol.18
, pp. 215-222
-
-
Pontrandolfo, P.1
-
23
-
-
0034326162
-
The exact overall time distribution of a project with uncertain task durations
-
Schmit C.W. Grossmann I.E. The exact overall time distribution of a project with uncertain task durations. Eur J Operational Res 2000; 126: 614–636.
-
(2000)
Eur J Operational Res
, vol.126
, pp. 614-636
-
-
Schmit, C.W.1
Grossmann, I.E.2
-
24
-
-
0347069898
-
Computing bounds on project duration distributions for stochastic PERT networks
-
Iida T. Computing bounds on project duration distributions for stochastic PERT networks. Naval Res Logistics 2000; 47: 559–580.
-
(2000)
Naval Res Logistics
, vol.47
, pp. 559-580
-
-
Iida, T.1
-
25
-
-
0035480326
-
The prediction and control of project duration: a recursive model
-
Hardie N. The prediction and control of project duration: a recursive model. Int J Project Management 2001; 19: 401–409.
-
(2001)
Int J Project Management
, vol.19
, pp. 401-409
-
-
Hardie, N.1
-
26
-
-
34249865056
-
A new approximation algorithm for obtaining the probability distribution function for project completion time
-
Yao M.J. Chu W.M. A new approximation algorithm for obtaining the probability distribution function for project completion time. Comput Math Appl 2007; 54: 282–295.
-
(2007)
Comput Math Appl
, vol.54
, pp. 282-295
-
-
Yao, M.J.1
Chu, W.M.2
-
27
-
-
35349009933
-
Lower bound for the mean project completion time in dynamic PERT networks
-
Azaron A. Fatemi-Ghomi SMT. Lower bound for the mean project completion time in dynamic PERT networks. Eur J Operational Res 2008; 186: 120–127.
-
(2008)
Eur J Operational Res
, vol.186
, pp. 120-127
-
-
Azaron, A.1
Fatemi-Ghomi, S.M.T.2
-
31
-
-
0028517058
-
A stochastic model to control project duration and expenditure
-
Tavares L.V. A stochastic model to control project duration and expenditure. Eur J Operational Res 1994; 78: 262–266.
-
(1994)
Eur J Operational Res
, vol.78
, pp. 262-266
-
-
Tavares, L.V.1
-
32
-
-
7444231051
-
Project risk management: lessons learned from software development environment
-
Kwak Y.H. Stoddard J.J. Project risk management: lessons learned from software development environment. Technovation 2004; 24: 915–920.
-
(2004)
Technovation
, vol.24
, pp. 915-920
-
-
Kwak, Y.H.1
Stoddard, J.J.2
-
33
-
-
36849065885
-
Minimizing project completion time with execution set method
-
Laslo Z. Keren B. Ilani H. Minimizing project completion time with execution set method. Eur J Operational Res 2008; 187: 1513–1519.
-
(2008)
Eur J Operational Res
, vol.187
, pp. 1513-1519
-
-
Laslo, Z.1
Keren, B.2
Ilani, H.3
-
34
-
-
84993684138
-
A lower bound for project completion time attained by detailing project tasks and redistributing workloads
-
Laslo Z. Ilani H. Keren B. A lower bound for project completion time attained by detailing project tasks and redistributing workloads. J Appl Quantitative Meth 2009; 4: 345–358.
-
(2009)
J Appl Quantitative Meth
, vol.4
, pp. 345-358
-
-
Laslo, Z.1
Ilani, H.2
Keren, B.3
-
35
-
-
19244376018
-
A simple CPM time–cost tradeoff algorithm
-
Siemens N. A simple CPM time–cost tradeoff algorithm. Management Sci 1971; 17: 354–363.
-
(1971)
Management Sci
, vol.17
, pp. 354-363
-
-
Siemens, N.1
-
36
-
-
0027642129
-
A two-level decision-making model for controlling stochastic projects
-
Golenko-Ginzburg D. A two-level decision-making model for controlling stochastic projects. Int J Production Econ 1993; 32: 117–127.
-
(1993)
Int J Production Econ
, vol.32
, pp. 117-127
-
-
Golenko-Ginzburg, D.1
-
37
-
-
33846896858
-
Minimal budget for activities chain with chance constrained lead-time
-
Laslo Z. Gurevich G. Minimal budget for activities chain with chance constrained lead-time. Int J Production Econ 2007; 107: 164–172.
-
(2007)
Int J Production Econ
, vol.107
, pp. 164-172
-
-
Laslo, Z.1
Gurevich, G.2
-
38
-
-
3743050163
-
Large-scale project management is risk management
-
Charette N. Large-scale project management is risk management. IEEE Software 1996; 13: 110–117.
-
(1996)
IEEE Software
, vol.13
, pp. 110-117
-
-
Charette, N.1
-
39
-
-
0029256275
-
Manage risk in product and process development and avoid unpleasant surprises
-
Coppendale J. Manage risk in product and process development and avoid unpleasant surprises. Engng Management J 1995; 5: 35–38.
-
(1995)
Engng Management J
, vol.5
, pp. 35-38
-
-
Coppendale, J.1
-
40
-
-
0030165699
-
A review of existing models for project planning and estimation and the need for a new approach
-
Chatzoglou P.D. Macaulay L.A. A review of existing models for project planning and estimation and the need for a new approach. Int J Project Management 1996; 14: 173–183.
-
(1996)
Int J Project Management
, vol.14
, pp. 173-183
-
-
Chatzoglou, P.D.1
Macaulay, L.A.2
-
41
-
-
0000181338
-
A network flow computation for project cost curves
-
Fulkerson D.R. A network flow computation for project cost curves. Management Sci 1961; 7: 167–178.
-
(1961)
Management Sci
, vol.7
, pp. 167-178
-
-
Fulkerson, D.R.1
-
42
-
-
0024063984
-
On the distribution of activity time in PERT
-
Golenko-Ginzburg D. On the distribution of activity time in PERT. J Operational Res Soc 1988; 39: 767–771.
-
(1988)
J Operational Res Soc
, vol.39
, pp. 767-771
-
-
Golenko-Ginzburg, D.1
-
43
-
-
84985793992
-
On the generality of the PERT average time formula
-
Troutt M.D. On the generality of the PERT average time formula. Decision Sci 1989; 20: 410–412.
-
(1989)
Decision Sci
, vol.20
, pp. 410-412
-
-
Troutt, M.D.1
-
44
-
-
84989485361
-
Assessing the extremes of probability distributions by the fractile method
-
Selvidge J.E. Assessing the extremes of probability distributions by the fractile method. Decision Sci 1980; 11: 493–502.
-
(1980)
Decision Sci
, vol.11
, pp. 493-502
-
-
Selvidge, J.E.1
-
45
-
-
0030108497
-
A simple and logical alternative for making PERT time estimates
-
Lau A.H.L. Lau H.S. Zhang Y. A simple and logical alternative for making PERT time estimates. IIE Transactions 1996; 28: 183–192.
-
(1996)
IIE Transactions
, vol.28
, pp. 183-192
-
-
Lau, A.H.L.1
Lau, H.S.2
Zhang, Y.3
-
46
-
-
0000738834
-
Monte Carlo methods and the PERT problem
-
Van Slyke R.M. Monte Carlo methods and the PERT problem. Operations Res 1963; 11: 839–860.
-
(1963)
Operations Res
, vol.11
, pp. 839-860
-
-
Van Slyke, R.M.1
-
47
-
-
0018738242
-
The use of cutest in Monte Carlo analysis of stochastic networks
-
Sigal C.E. Pritsker A.B. Solberg J.J. The use of cutest in Monte Carlo analysis of stochastic networks. Math Comput Sim 1979; 21: 379–384.
-
(1979)
Math Comput Sim
, vol.21
, pp. 379-384
-
-
Sigal, C.E.1
Pritsker, A.B.2
Solberg, J.J.3
-
48
-
-
0021469459
-
Determining the K most critical path in PERT networks
-
Dodin B. Determining the K most critical path in PERT networks. Operations Res 1984; 32: 859-877.
-
(1984)
Operations Res
, vol.32
, pp. 859-877
-
-
Dodin, B.1
-
49
-
-
0026854670
-
Criticality in stochastic networks
-
Williams T.M. Criticality in stochastic networks. J Operational Res Soc 1992; 43: 353–357.
-
(1992)
J Operational Res Soc
, vol.43
, pp. 353-357
-
-
Williams, T.M.1
-
51
-
-
0030788844
-
A project scheduling problem library: OR software – ORSEP Operations Research Software Exchange Program
-
Kolisch R. Sprecher A. A project scheduling problem library: OR software – ORSEP Operations Research Software Exchange Program. Eur J Operational Res 1997; 96: 203–216.
-
(1997)
Eur J Operational Res
, vol.96
, pp. 203-216
-
-
Kolisch, R.1
Sprecher, A.2
|