메뉴 건너뛰기




Volumn 66, Issue 1-4, 2013, Pages 59-69

Mathematical models for productivity and availability of automated lines

Author keywords

Automated lines; Productivity; Reliability

Indexed keywords

ANALYTICAL EQUATIONS; AUTOMATED LINES; COMPLEX DESIGNS; INDUSTRIAL MACHINES; PRODUCTIVITY RATE; QUALITY OF PRODUCT; TECHNOLOGICAL PARAMETERS;

EID: 84875416376     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-012-4305-y     Document Type: Article
Times cited : (16)

References (21)
  • 8
    • 0026971804 scopus 로고
    • Reliability and exploitation of waste-water treatment plants using diagnostic methods
    • 10.1080/00207239208710734
    • Drakato P et al (1992) Reliability and exploitation of waste-water treatment plants using diagnostic methods. Int J Env Stud 40(4):267-280
    • (1992) Int J Env Stud , vol.40 , Issue.4 , pp. 267-280
    • Drakato, P.1
  • 9
    • 33947230616 scopus 로고    scopus 로고
    • Failure models and throughput rate of transfer lines
    • 1128.90314 10.1080/00207540600677716
    • Mourani I et al (2007) Failure models and throughput rate of transfer lines. Int J Prod Res 45(8):1835-1859
    • (2007) Int J Prod Res , vol.45 , Issue.8 , pp. 1835-1859
    • Mourani, I.1
  • 10
    • 3242718694 scopus 로고    scopus 로고
    • Productivity of parallel production lines with unreliable machines and material handling
    • Freiheit T, Koren Y, Hu SJ (2004) Productivity of parallel production lines with unreliable machines and material handling. IEEE Trans 1(1):98-103
    • (2004) IEEE Trans , vol.1 , Issue.1 , pp. 98-103
    • Freiheit, T.1    Koren, Y.2    Hu, S.J.3
  • 11
    • 84861581537 scopus 로고    scopus 로고
    • Integrated quality production logistics and maintenance analysis of multi-stage asynchronous manufacturing systems with degrading machines
    • 10.1016/j.cirp.2012.03.072
    • Colledany M, Tolio T (2012) Integrated quality production logistics and maintenance analysis of multi-stage asynchronous manufacturing systems with degrading machines. CIRP Annals 61(1):455-458
    • (2012) CIRP Annals , vol.61 , Issue.1 , pp. 455-458
    • Colledany, M.1    Tolio, T.2
  • 12
    • 32044469640 scopus 로고    scopus 로고
    • Performance and evaluation of manufacturing systems
    • 10.1016/S0007-8506(07)60023-7
    • Hon KKB (2005) Performance and evaluation of manufacturing systems. CIRP Annals 54(2):675-690
    • (2005) CIRP Annals , vol.54 , Issue.2 , pp. 675-690
    • Hon, K.K.B.1
  • 13
    • 31444433147 scopus 로고    scopus 로고
    • Scalable reconfigurable equipment design principles
    • 10.1080/00268970500183042
    • Spicer P, Yip-Hoi D, Koren Y (2005) Scalable reconfigurable equipment design principles. Int J Prod Res 43(22):4839-4852
    • (2005) Int J Prod Res , vol.43 , Issue.22 , pp. 4839-4852
    • Spicer, P.1    Yip-Hoi, D.2    Koren, Y.3
  • 14
    • 33947699441 scopus 로고    scopus 로고
    • A GA-PCA approach for power sector performance ranking based on machine productivity
    • 2316742 1128.90364 10.1016/j.amc.2006.07.138
    • Ebrahimipour V et al (2007) A GA-PCA approach for power sector performance ranking based on machine productivity. App Math Comput 186(2):1205-1215
    • (2007) App Math Comput , vol.186 , Issue.2 , pp. 1205-1215
    • Ebrahimipour, V.1
  • 15
    • 33750036713 scopus 로고    scopus 로고
    • Availability assessment of multi-state manufacturing systems using universal generating function
    • 10.1016/S0007-8506(07)60455-7
    • Youseff AMA, Mohib A, ElMaraghy HA (2006) Availability assessment of multi-state manufacturing systems using universal generating function. CIRP Annals 55(1):445-448
    • (2006) CIRP Annals , vol.55 , Issue.1 , pp. 445-448
    • Youseff, A.M.A.1    Mohib, A.2    Elmaraghy, H.A.3
  • 16
    • 0037255897 scopus 로고    scopus 로고
    • Case study: Influences on the availability of machine tools
    • Rzepka B et al (2003) Case study: influences on the availability of machine tools. Proc Ann Reliab Maint Symp:593-599
    • (2003) Proc Ann Reliab Maint Symp , pp. 593-599
    • Rzepka, B.1
  • 17
    • 0242269802 scopus 로고    scopus 로고
    • Manufacturing productivity improvement using effectiveness metrics and simulation analysis
    • 1038.90514 10.1080/0020754021000042391
    • Huang SH et al (2003) Manufacturing productivity improvement using effectiveness metrics and simulation analysis. Int J Prod Res 41(3):513-527
    • (2003) Int J Prod Res , vol.41 , Issue.3 , pp. 513-527
    • Huang, S.H.1
  • 18
    • 57049184706 scopus 로고    scopus 로고
    • Productivity rate of rotor-type automated lines and optimization of their structure
    • 10.1243/09544054JEM986
    • Usubamatov R et al (2008) Productivity rate of rotor-type automated lines and optimization of their structure. Proc IMechE Part B J Eng Manuf 222:1561-1566
    • (2008) Proc IMechE Part B J Eng Manuf , vol.222 , pp. 1561-1566
    • Usubamatov, R.1
  • 19
    • 84860583141 scopus 로고    scopus 로고
    • Productivity and optimization of section-based automated lines of parallel-serial structure with embedded buffers
    • doi: 10.1007/s00170-012-4204-2
    • Usubamatov R et al (2012) Productivity and optimization of section-based automated lines of parallel-serial structure with embedded buffers. Int J Adv Man Technol. doi: 10.1007/s00170-012-4204-2
    • (2012) Int J Adv Man Technol.
    • Usubamatov, R.1
  • 20
    • 78651588246 scopus 로고    scopus 로고
    • Optimization of structure of section-based automated lines
    • Usubamatov R, Abdulmuin Z (2009) Optimization of structure of section-based automated lines. World Acad Sci Eng Technol 38:1231-1234
    • (2009) World Acad Sci Eng Technol , vol.38 , pp. 1231-1234
    • Usubamatov, R.1    Abdulmuin, Z.2
  • 21
    • 67650952358 scopus 로고    scopus 로고
    • Productivity. Theory and measurement in business
    • Espoo, Finland:1/10-10/10
    • Saari S (2006) Productivity. Theory and measurement in business. Eur Prod Conf, Espoo, Finland:1/10-10/10
    • (2006) Eur Prod Conf
    • Saari, S.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.