메뉴 건너뛰기




Volumn 65, Issue 5-8, 2013, Pages 651-655

Productivity and optimization of section-based automated lines of parallel-serial structure with embedded buffers

Author keywords

Automated line; Optimisation; Productivity; Sections

Indexed keywords

AUTOMATION; PRODUCTIVITY;

EID: 84860583141     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-012-4204-2     Document Type: Article
Times cited : (10)

References (16)
  • 1
    • 0034288452 scopus 로고    scopus 로고
    • Design and operation of manufacturing systems. The control-point policy
    • Gershwin SB (2000) Design and operation of manufacturing systems. The control-point policy. IIE Trans 32(2): 891-906
    • (2000) IIE Trans , vol.32 , Issue.2 , pp. 891-906
    • Gershwin, S.B.1
  • 2
    • 33746409720 scopus 로고    scopus 로고
    • Quantitative analysis of a transfer production line with Andon
    • Li J, Blumenfeld DE (2006) Quantitative analysis of a transfer production line with Andon. IIE Trans 38(10): 837-846
    • (2006) IIE Trans , vol.38 , Issue.10 , pp. 837-846
    • Li, J.1    Blumenfeld, D.E.2
  • 3
    • 33745005949 scopus 로고    scopus 로고
    • Analysis of serial production lines: Characterisation study and a new heuristic procedure for optimal buffer allocation
    • Sabuncuoglu I, Erel E, Gocgun Y (2006) Analysis of serial production lines: characterisation study and a new heuristic procedure for optimal buffer allocation. Int J Prod Res 44(13): 2499-2523
    • (2006) Int J Prod Res , vol.44 , Issue.13 , pp. 2499-2523
    • Sabuncuoglu, I.1    Erel, E.2    Gocgun, Y.3
  • 4
    • 24744449915 scopus 로고    scopus 로고
    • Achieving optimal design of the production line with obtainable resource capacity
    • Chen M-S, Lan C-H (2002) Achieving optimal design of the production line with obtainable resource capacity. Yugoslav J Oper Res 12: 203-214
    • (2002) Yugoslav J Oper Res , vol.12 , pp. 203-214
    • Chen, M.-S.1    Lan, C.-H.2
  • 5
    • 2442651807 scopus 로고    scopus 로고
    • Productivity of synchronized serial production lines with flexible reserve capacity
    • Freiheit T, Shpitalni M, Hu SJ, Koren Y (2004) Productivity of synchronized serial production lines with flexible reserve capacity. Int J Prod Res 42(10): 2009-2027
    • (2004) Int J Prod Res , vol.42 , Issue.10 , pp. 2009-2027
    • Freiheit, T.1    Shpitalni, M.2    Hu, S.J.3    Koren, Y.4
  • 6
    • 33947230616 scopus 로고    scopus 로고
    • Failure models and throughput rate of transfer lines
    • Mourani I, Hennequin S, Xie X (2007) Failure models and throughput rate of transfer lines. Int J Prod Res 45(8): 1835-1859
    • (2007) Int J Prod Res , vol.45 , Issue.8 , pp. 1835-1859
    • Mourani, I.1    Hennequin, S.2    Xie, X.3
  • 7
    • 0036532881 scopus 로고    scopus 로고
    • Performance analysis and optimization of cyclic production lines
    • Han M-S, Park D-J (2002) Performance analysis and optimization of cyclic production lines. IIE Trans 34(4): 411-422
    • (2002) IIE Trans , vol.34 , Issue.4 , pp. 411-422
    • Han, M.-S.1    Park, D.-J.2
  • 8
    • 0037233381 scopus 로고    scopus 로고
    • Optimal buffer allocation in production lines
    • Shi L, Men S (2003) Optimal buffer allocation in production lines. IIE Trans 35(1): 1-10
    • (2003) IIE Trans , vol.35 , Issue.1 , pp. 1-10
    • Shi, L.1    Men, S.2
  • 9
    • 33746847689 scopus 로고    scopus 로고
    • Designing unbalanced paced lines: A conceptual model and an experimental campaign
    • Caridi M, Cigolini R, Farina V (2006) Designing unbalanced paced lines: a conceptual model and an experimental campaign. Prod Plan Control 17(5): 464-479
    • (2006) Prod Plan Control , vol.17 , Issue.5 , pp. 464-479
    • Caridi, M.1    Cigolini, R.2    Farina, V.3
  • 11
    • 57049184706 scopus 로고    scopus 로고
    • Productivity rate of rotor-type automated lines and optimization of their structure
    • Usubamatov R et al (2008) Productivity rate of rotor-type automated lines and optimization of their structure. Proc IMechE B J Eng Manuf 222: 1561-1566
    • (2008) Proc IMechE B J Eng Manuf , vol.222 , pp. 1561-1566
    • Usubamatov, R.1
  • 12
    • 85040666729 scopus 로고    scopus 로고
    • Productivity of section-based automated lines
    • Usubamatov R et al (2004) Productivity of section-based automated lines. Mech Eng Res J 4: 12-20
    • (2004) Mech Eng Res J , vol.4 , pp. 12-20
    • Usubamatov, R.1
  • 13
    • 78651588246 scopus 로고    scopus 로고
    • Optimization of structure of section-based automated lines
    • Usubamatov R, Abdulmuin Z (2009) Optimization of structure of section-based automated lines. World Acad Sci Eng Technol 38: 1231-1234
    • (2009) World Acad Sci Eng Technol , vol.38 , pp. 1231-1234
    • Usubamatov, R.1    Abdulmuin, Z.2
  • 15
    • 0242270555 scopus 로고    scopus 로고
    • Practical considerations in the optimization of flow production systems
    • Tempelmeier H (2003) Practical considerations in the optimization of flow production systems. Int J Prod Res 41(1): 149-170
    • (2003) Int J Prod Res , vol.41 , Issue.1 , pp. 149-170
    • Tempelmeier, H.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.