-
3
-
-
67649671342
-
Optimum track structure considering deterioration in ballasted track
-
Cape Town, South Africa
-
Sato Y. Optimum track structure considering deterioration in ballasted track. In: The 6th international heavy haul conference, Cape Town, South Africa, 1997, pp. 576-590.
-
(1997)
The 6th International Heavy Haul Conference
, pp. 576-590
-
-
Sato, Y.1
-
4
-
-
0019683766
-
Track-quality indices and track degradation models for maintenance-of-way planning
-
Hamid A, Gross A. Track-quality indices and track degradation models for maintenance-of-way planning. Transport Res Board. 1981 ; 802: 2-8
-
(1981)
Transport Res Board
, vol.802
, pp. 2-8
-
-
Hamid, A.1
Gross, A.2
-
5
-
-
0020991844
-
Development of railway track degradation models
-
Bing AJ, Gross A. Development of railway track degradation models. Transport Res Board. 1983 ; 939: 27-31
-
(1983)
Transport Res Board
, vol.939
, pp. 27-31
-
-
Bing, A.J.1
Gross, A.2
-
6
-
-
77955326110
-
Development of improved railway track degradation models
-
Sadehghi J, Askarinejad H. Development of improved railway track degradation models. Struct Infrastruct Engng. 2010 ; 6 (6). 675-688
-
(2010)
Struct Infrastruct Engng
, vol.6
, Issue.6
, pp. 675-688
-
-
Sadehghi, J.1
Askarinejad, H.2
-
7
-
-
79951664435
-
Application of maintenance management model based on Markov chain and probabilistic dynamic programming for the Iranian railways
-
Shafahi Y, Hakhamameshi R. Application of maintenance management model based on Markov chain and probabilistic dynamic programming for the Iranian railways. Scientia Iranica, Trans A: Civil Engng. 2009 ; 16 (1). 87-97
-
(2009)
Scientia Iranica, Trans A: Civil Engng
, vol.16
, Issue.1
, pp. 87-97
-
-
Shafahi, Y.1
Hakhamameshi, R.2
-
9
-
-
24644473583
-
Risk-informed optimisation of railway tracks inspection and maintenance procedures
-
Podofillini L, Zio E, Vatn J. Risk-informed optimisation of railway tracks inspection and maintenance procedures. J Reliab Engng Syst Saf. 2006 ; 91: 20-35
-
(2006)
J Reliab Engng Syst Saf
, vol.91
, pp. 20-35
-
-
Podofillini, L.1
Zio, E.2
Vatn, J.3
-
10
-
-
55149119920
-
A holistic procedure for rail maintenance in Sweden
-
Kumar S, Espling U, Kumar U. A holistic procedure for rail maintenance in Sweden. Proc IMechE, Part F: J. Rail Rapid Transit. 2008 ; 222 (4). 331-344
-
(2008)
Proc IMechE, Part F: J. Rail Rapid Transit
, vol.222
, Issue.4
, pp. 331-344
-
-
Kumar, S.1
Espling, U.2
Kumar, U.3
-
11
-
-
84873917541
-
Monte Carlo simulation of railway track geometry deterioration and restoration
-
Quiroga LM, Schnieder E. Monte Carlo simulation of railway track geometry deterioration and restoration. Proc IMechE, Part O: J Risk Reliab. 2012 ; 226 (3). 274-282
-
(2012)
Proc IMechE, Part O: J Risk Reliab
, vol.226
, Issue.3
, pp. 274-282
-
-
Quiroga, L.M.1
Schnieder, E.2
-
12
-
-
78649434398
-
A heuristic approach to railway track maintenance scheduling
-
Quiroga LM, Schnieder E. A heuristic approach to railway track maintenance scheduling. WIT Trans Built Environ. 2010 ; 114: 687-699
-
(2010)
WIT Trans Built Environ
, vol.114
, pp. 687-699
-
-
Quiroga, L.M.1
Schnieder, E.2
-
13
-
-
79953188366
-
Modelling railway track geometry deterioration
-
Guler H, Evren G, Javanovic S. Modelling railway track geometry deterioration. Proc ICE, Transport. 2011 ; 164 (2). 65-75
-
(2011)
Proc ICE, Transport
, vol.164
, Issue.2
, pp. 65-75
-
-
Guler, H.1
Evren, G.2
Javanovic, S.3
-
17
-
-
0029221209
-
Japanese studies on deterioration of ballasted track
-
Sato Y. Japanese studies on deterioration of ballasted track. Veh Syst Dyn. 1995 ; 24: 197-208
-
(1995)
Veh Syst Dyn
, vol.24
, pp. 197-208
-
-
Sato, Y.1
-
20
-
-
39749165204
-
Phased mission modelling of systems with maintenance-free operating periods using simulated Petri nets
-
Chew SP, Dunnett SJ, Andrews JD. Phased mission modelling of systems with maintenance-free operating periods using simulated Petri nets. Reliab Engng Syst Saf. 2008 ; 93 (7). 980-994
-
(2008)
Reliab Engng Syst Saf
, vol.93
, Issue.7
, pp. 980-994
-
-
Chew, S.P.1
Dunnett, S.J.2
Andrews, J.D.3
|