|
Volumn 226, Issue 3, 2012, Pages 274-282
|
Monte Carlo simulation of railway track geometry deterioration and restoration
|
Author keywords
high speed railways; maintenance; simulation; tamping
|
Indexed keywords
AGEING PROCESS;
BEST FIT;
CRITICAL ISSUES;
GEOMETRICAL CHARACTERISTICS;
GREY-BOX MODELS;
HIGH - SPEED RAILWAYS;
ITERATIVE TECHNIQUE;
LARGE AMOUNTS;
LEVENBERG-MARQUARDT ALGORITHM;
LOCAL MINIMUMS;
MAINTENANCE ACTIVITY;
MAINTENANCE PROCESS;
MAINTENANCE STRATEGIES;
MONTE CARLO SIMULATION;
NONLINEAR FUNCTIONS;
PARAMETER VALUES;
PLANNING AND SCHEDULING;
RAILWAY INFRASTRUCTURE;
RAILWAY OPERATORS;
RAILWAY TRACK;
SIGNAL MEASUREMENT;
SIMULATION;
STATISTICAL DESCRIPTIONS;
STATISTICAL MODELS;
SUM OF SQUARES;
SYSTEM IDENTIFICATION METHODS;
TAMPING;
TECHNICAL RESOURCES;
DETERIORATION;
FUNCTIONS;
MAINTENANCE;
MONTE CARLO METHODS;
RAILROAD ENGINEERING;
RAILROAD TRACKS;
RAILROAD TRANSPORTATION;
COMPUTER SIMULATION;
|
EID: 84873917541
PISSN: 1748006X
EISSN: 17480078
Source Type: Journal
DOI: 10.1177/1748006X11418422 Document Type: Article |
Times cited : (72)
|
References (20)
|