메뉴 건너뛰기




Volumn 52, Issue 5, 2013, Pages 2152-2167

Hybrid bilevel-lagrangean decomposition scheme for the integration of planning and scheduling of a network of batch plants

Author keywords

[No Author keywords available]

Indexed keywords

ACROSS TIME; BATCH PLANTS; BI-LEVEL DECOMPOSITION; BILEVEL; CUSTOMER DEMANDS; DECOMPOSITION SCHEME; DECOMPOSITION STRATEGY; FINISHED PRODUCTS; INDUSTRIAL PROBLEM; INDUSTRIAL TEST CASE; INTERMEDIATE PRODUCT; MULTI-PRODUCT BATCH PLANTS; MULTIPLE-TIME PERIODS; PLANNING AND SCHEDULING; PLANNING MODELS; PLANNING PROBLEM; PROBLEM INSTANCES; PROBLEM SIZE; SCHEDULING MODELS; SEQUENCE-DEPENDENT; SINGLE STAGE; TIME HORIZONS;

EID: 84873346169     PISSN: 08885885     EISSN: 15205045     Source Type: Journal    
DOI: 10.1021/ie302788g     Document Type: Article
Times cited : (31)

References (30)
  • 1
  • 18
    • 52449148785 scopus 로고    scopus 로고
    • Guignard, M. Top 2003, 11, 151-228
    • (2003) Top , vol.11 , pp. 151-228
    • Guignard, M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.