메뉴 건너뛰기




Volumn 48, Issue 13, 2009, Pages 6346-6357

An efficient mixed-integer linear programming scheduling framework for addressing sequence-dependent setup issues in batch plants

Author keywords

[No Author keywords available]

Indexed keywords

BATCH PLANTS; COMPLEX SCHEDULING; COMPUTATIONAL EFFORT; CONTINUOUS TIME; MIXED INTEGER LINEAR PROGRAMMING; SCHEDULING FRAMEWORKS; SCHEDULING PROBLEM; SEQUENCE DEPENDENT SETUPS; SEQUENCE-DEPENDENT SETUP TIME; SERVICE APPLICATIONS; SET-UP TIME;

EID: 67650844715     PISSN: 08885885     EISSN: None     Source Type: Journal    
DOI: 10.1021/ie801127t     Document Type: Article
Times cited : (53)

References (23)
  • 1
    • 33748492325 scopus 로고    scopus 로고
    • Scheduling and lot sizing with sequence- dependent setup: A literature review
    • Yang, W.; Wilhelm, W. Scheduling and lot sizing with sequence- dependent setup: A literature review. IIE Trans. 2006, 38, 987-1007.
    • (2006) IIE Trans , vol.38 , pp. 987-1007
    • Yang, W.1    Wilhelm, W.2
  • 3
    • 0033114757 scopus 로고    scopus 로고
    • A review of scheduling research involving setup considerations
    • Allahverdi, A.; Gupta, J.; Aldowaisan, T. A review of scheduling research involving setup considerations. Omega 1999, 27 (2), 219-239.
    • (1999) Omega , vol.27 , Issue.2 , pp. 219-239
    • Allahverdi, A.1    Gupta, J.2    Aldowaisan, T.3
  • 4
    • 0033078946 scopus 로고    scopus 로고
    • A review of scheduling research involving setup considerations
    • Yang, W.; Liao, C. A review of scheduling research involving setup considerations. Int. J. Syst. Sci. 1999, 30 (2), 143-155.
    • (1999) Int. J. Syst. Sci , vol.30 , Issue.2 , pp. 143-155
    • Yang, W.1    Liao, C.2
  • 5
    • 36849082395 scopus 로고    scopus 로고
    • A survey of scheduling problems with setup times or costs
    • Allahverdi, A.; Ng, C.; Cheng, T.; Kovalyov, M. A survey of scheduling problems with setup times or costs. Eur. J. Oper. Res. 2008, 187, 985-1032.
    • (2008) Eur. J. Oper. Res , vol.187 , pp. 985-1032
    • Allahverdi, A.1    Ng, C.2    Cheng, T.3    Kovalyov, M.4
  • 6
    • 0004113622 scopus 로고
    • Conway, R, Maxwell, W, Miller, L, Eds, Massachussets: Addison-Wesley: Reading, MA
    • Conway, R., Maxwell, W., Miller, L., Eds. Theory of Scheduling; Massachussets: Addison-Wesley: Reading, MA, 1967.
    • (1967) Theory of Scheduling
  • 7
    • 84952071818 scopus 로고    scopus 로고
    • Sherali, H.; Sarin, S.; Kodialam, M. Models and algorithms for a two stage production process. Prod. Plan. Control 1990, 1, 27-39.
    • Sherali, H.; Sarin, S.; Kodialam, M. Models and algorithms for a two stage production process. Prod. Plan. Control 1990, 1, 27-39.
  • 8
    • 0018444331 scopus 로고
    • A production scheduling problem in the glass container industry
    • Paul, R. A production scheduling problem in the glass container industry. Oper. Res. 1979, 27, 290-302.
    • (1979) Oper. Res , vol.27 , pp. 290-302
    • Paul, R.1
  • 9
    • 0030385077 scopus 로고    scopus 로고
    • Using metaheuristics for solving a production scheduling problem in a chemical firm
    • Fortemps, P.; Ost, C.; Pirlot, M.; Teghem, J.; Tuyttens, D. Using metaheuristics for solving a production scheduling problem in a chemical firm. Int. J. Prod. Econ. 1996, 46-47, 13-26.
    • (1996) Int. J. Prod. Econ , vol.46-47 , pp. 13-26
    • Fortemps, P.1    Ost, C.2    Pirlot, M.3    Teghem, J.4    Tuyttens, D.5
  • 10
    • 0002286606 scopus 로고
    • Sequencing production on parallel machines with two magnitudes of sequence-dependent setup cost
    • Bitran, G. R.; Gilbert, S. M. Sequencing production on parallel machines with two magnitudes of sequence-dependent setup cost. J. Manuf. Oper. Manage. 1990, 3, 24-52.
    • (1990) J. Manuf. Oper. Manage , vol.3 , pp. 24-52
    • Bitran, G.R.1    Gilbert, S.M.2
  • 11
    • 0021466086 scopus 로고
    • Scheduling in a two stage manufacturing process
    • Narasimhan, S.; Panwalkar, S. Scheduling in a two stage manufacturing process. Int. J. Prod. Res. 1984, 22, 555-564.
    • (1984) Int. J. Prod. Res , vol.22 , pp. 555-564
    • Narasimhan, S.1    Panwalkar, S.2
  • 13
    • 36849051282 scopus 로고    scopus 로고
    • The significance of reducing setup times/setup costs
    • Allahverdi, A.; Soroush, H. M. The significance of reducing setup times/setup costs. Eur. J. Oper. Res. 2008, 187, 978-984.
    • (2008) Eur. J. Oper. Res , vol.187 , pp. 978-984
    • Allahverdi, A.1    Soroush, H.M.2
  • 14
    • 33748102266 scopus 로고    scopus 로고
    • Review: State-of-the-art of optimization methods for short-term scheduling of batch processes
    • Mendez, C.; Cerda, J.; Grossmann, I.; Harjunkoski, I.; Fahl, M. Review: State-of-the-art of optimization methods for short-term scheduling of batch processes. Comput. Chem. Eng. 2006, 30, 913-946.
    • (2006) Comput. Chem. Eng , vol.30 , pp. 913-946
    • Mendez, C.1    Cerda, J.2    Grossmann, I.3    Harjunkoski, I.4    Fahl, M.5
  • 15
    • 0042807254 scopus 로고    scopus 로고
    • Dynamic scheduling in multiproduct batch plants
    • Mendez, C.; Cerda, J. Dynamic scheduling in multiproduct batch plants. Comput. Chem. Eng. 2003, 27, 8-9.
    • (2003) Comput. Chem. Eng , vol.27 , pp. 8-9
    • Mendez, C.1    Cerda, J.2
  • 16
    • 67650849733 scopus 로고    scopus 로고
    • Solving two production scheduling problems with sequence-dependent set-up times
    • Class. C61, M11, L60
    • Noivo, J.; Ramalhinho-Lourenco, H. Solving two production scheduling problems with sequence-dependent set-up times. J. Econ. Lit. 1998, Class. C61, M11, L60.
    • (1998) J. Econ. Lit
    • Noivo, J.1    Ramalhinho-Lourenco, H.2
  • 17
    • 1942500440 scopus 로고    scopus 로고
    • An MILP framework for batch reactive scheduling with limited discrete resources
    • Mendez, C.; Cerda, J. An MILP framework for batch reactive scheduling with limited discrete resources. ComputChemg. 2004, 28, 1059-1068.
    • (2004) ComputChemg , vol.28 , pp. 1059-1068
    • Mendez, C.1    Cerda, J.2
  • 18
    • 57249089354 scopus 로고    scopus 로고
    • Costs for rescheduling actions: A critical issue for reducing the gap between scheduling theory and practice
    • Kopanos, G.; Capoon-Garcia, E.; Espuiia, A.; Puigjaner, L. Costs for rescheduling actions: a critical issue for reducing the gap between scheduling theory and practice. Ind. Eng. Chem. Res. 2008, 47, 8785-8795.
    • (2008) Ind. Eng. Chem. Res , vol.47 , pp. 8785-8795
    • Kopanos, G.1    Capoon-Garcia, E.2    Espuiia, A.3    Puigjaner, L.4
  • 19
    • 0001690679 scopus 로고
    • A continuous time mixed integer linear programming model for short term scheduling of multistage batch plants
    • Pinto, J.; Grossmann, I. A continuous time mixed integer linear programming model for short term scheduling of multistage batch plants. Ind. Eng. Chem. Res. 1995, 34, 3037-3051.
    • (1995) Ind. Eng. Chem. Res , vol.34 , pp. 3037-3051
    • Pinto, J.1    Grossmann, I.2
  • 20
    • 33749823078 scopus 로고    scopus 로고
    • Maximization of throughput in a multipurpose batch plant under a fixed time horizon: S-graph approach
    • Majozi, T.; Friedler, F. Maximization of throughput in a multipurpose batch plant under a fixed time horizon: S-graph approach. Ind. Eng. Chem. Res. 2006, 45, 6713-6720.
    • (2006) Ind. Eng. Chem. Res , vol.45 , pp. 6713-6720
    • Majozi, T.1    Friedler, F.2
  • 21
    • 0031140322 scopus 로고    scopus 로고
    • A mixed-integer linear programming model for short-term scheduling of single-stage multiproduct batch plants with parallel lines
    • Cerda, J.; Henning, G.; Grossmann, I. A mixed-integer linear programming model for short-term scheduling of single-stage multiproduct batch plants with parallel lines. Ind. Eng. Chem. Res. 1997, 36, 1695-1707.
    • (1997) Ind. Eng. Chem. Res , vol.36 , pp. 1695-1707
    • Cerda, J.1    Henning, G.2    Grossmann, I.3
  • 22
    • 0034307307 scopus 로고    scopus 로고
    • Optimal scheduling of batch plants satisfying multiple product orders with different due-dates
    • Mendez, C.; Henning, G.; Cerda, J. Optimal scheduling of batch plants satisfying multiple product orders with different due-dates. Comput Chem. Eng. 2000, 24, 2223-2245.
    • (2000) Comput Chem. Eng , vol.24 , pp. 2223-2245
    • Mendez, C.1    Henning, G.2    Cerda, J.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.