메뉴 건너뛰기




Volumn 64, Issue 2, 2013, Pages 293-311

Increasing the total net revenue for single machine order acceptance and scheduling problems using an artificial bee colony algorithm

Author keywords

Artificial bee colony algorithm; Order acceptance and scheduling problem; Sequence dependent setup times; Single machine

Indexed keywords

BENCHMARKING; DATA STORAGE EQUIPMENT; ECONOMICS; OPTIMIZATION; SCHEDULING;

EID: 84871996244     PISSN: 01605682     EISSN: 14769360     Source Type: Journal    
DOI: 10.1057/jors.2012.47     Document Type: Article
Times cited : (52)

References (34)
  • 1
    • 0031189321 scopus 로고    scopus 로고
    • Finite-capacity scheduling-based planning for revenue-based capacity management
    • PII S0377221796000215
    • Akkan C (1997). Finite-capacity scheduling-based planning for revenue-based capacity management. European Journal of Operational Research 100(1): 170-179. (Pubitemid 127414917)
    • (1997) European Journal of Operational Research , vol.100 , Issue.1 , pp. 170-179
    • Akkan, C.1
  • 2
    • 80053346127 scopus 로고    scopus 로고
    • A tabu search algorithm for order acceptance and scheduling
    • Cesaret B, Oǧuz C and Sibel SF (2012). A tabu search algorithm for order acceptance and scheduling. Computers & Operations Research 39(6): 1197-1205.
    • (2012) Computers & Operations Research , vol.39 , Issue.6 , pp. 1197-1205
    • Cesaret, B.1    Oǧuz, C.2    Sibel, S.F.3
  • 3
    • 2942640054 scopus 로고    scopus 로고
    • Order selection and scheduling with leadtime flexibility
    • Charnsirisakskul K, Griffin PM and Keskinocak P (2004). Order selection and scheduling with leadtime flexibility. IIE Transactions 36(7): 697-707.
    • (2004) IIE Transactions , vol.36 , Issue.7 , pp. 697-707
    • Charnsirisakskul, K.1    Griffin, P.M.2    Keskinocak, P.3
  • 4
    • 28044434431 scopus 로고    scopus 로고
    • Pricing and scheduling decisions with leadtime flexibility
    • DOI 10.1016/j.ejor.2004.07.062, PII S0377221704005752
    • Charnsirisakskul K, Griffin PM and Keskinocak P (2006). Pricing and scheduling decisions with leadtime flexibility. European Journal of Operational Research 171(1): 153-169. (Pubitemid 41690033)
    • (2006) European Journal of Operational Research , vol.171 , Issue.1 , pp. 153-169
    • Charnsirisakskul, K.1    Griffin, P.M.2    Keskinocak, P.3
  • 5
    • 41149149606 scopus 로고    scopus 로고
    • Hybrid evolutionary algorithm with marriage of genetic algorithm and extremal optimization for production scheduling
    • Chen YW, Lu YZ and Yang GK (2008). Hybrid evolutionary algorithm with marriage of genetic algorithm and extremal optimization for production scheduling. International Journal of Advanced Manufacturing Technology 36(9): 959-968.
    • (2008) International Journal of Advanced Manufacturing Technology , vol.36 , Issue.9 , pp. 959-968
    • Chen, Y.W.1    Lu, Y.Z.2    Yang, G.K.3
  • 9
    • 0031075465 scopus 로고    scopus 로고
    • Job selection in a heavily loaded shop
    • Ghosh JB (1997). Job selection in a heavily loaded shop. Computers & Operations Research 24(2): 141-145.
    • (1997) Computers & Operations Research , vol.24 , Issue.2 , pp. 141-145
    • Ghosh, J.B.1
  • 10
    • 62549112638 scopus 로고    scopus 로고
    • Single machine scheduling and due date assignment with positionally dependent processing times
    • Gordon VS and Strusevich VA (2009). Single machine scheduling and due date assignment with positionally dependent processing times. European Journal of Operational Research 198(1): 57-62.
    • (2009) European Journal of Operational Research , vol.198 , Issue.1 , pp. 57-62
    • Gordon, V.S.1    Strusevich, V.A.2
  • 12
    • 36549033388 scopus 로고    scopus 로고
    • Dynamic order acceptance and capacity planning on a single bottleneck resource
    • DOI 10.1002/nav.20259
    • Herbots J, Herroelen W and Leus R (2007). Dynamic order acceptance and capacity planning on a single bottleneck resource. Naval Research Logistics 54(8): 874-889. (Pubitemid 350189030)
    • (2007) Naval Research Logistics , vol.54 , Issue.8 , pp. 874-889
    • Herbots, J.1    Herroelen, W.2    Leus, R.3
  • 13
    • 67349287577 scopus 로고    scopus 로고
    • Structural inverse analysis by hybrid simplex artificial bee colony algorithms
    • Kang F, Li J and Xu Q (2009). Structural inverse analysis by hybrid simplex artificial bee colony algorithms. Computers & Structures 87(13): 861-870.
    • (2009) Computers & Structures , vol.87 , Issue.13 , pp. 861-870
    • Kang, F.1    Li, J.2    Xu, Q.3
  • 15
    • 67349273050 scopus 로고    scopus 로고
    • A comparative study of artificial bee colony algorithm
    • Karaboga D and Akay B (2009). A comparative study of artificial bee colony algorithm. Applied Mathematics and Computation 214(1): 108-132.
    • (2009) Applied Mathematics and Computation , vol.214 , Issue.1 , pp. 108-132
    • Karaboga, D.1    Akay, B.2
  • 16
    • 67651121862 scopus 로고    scopus 로고
    • Neural networks training by artificial bee colony algorithm on pattern classification
    • Karaboga D and Ozturk C (2009). Neural networks training by artificial bee colony algorithm on pattern classification. Neural Network World 19(10): 279-292.
    • (2009) Neural Network World , vol.19 , Issue.10 , pp. 279-292
    • Karaboga, D.1    Ozturk, C.2
  • 17
    • 77957901422 scopus 로고    scopus 로고
    • A novel clustering approach: Artificial bee colony (ABC) algorithm
    • Karaboga D and Ozturk C (2011). A novel clustering approach: Artificial bee colony (ABC) algorithm. Applied Soft Computing 11(1): 652-657.
    • (2011) Applied Soft Computing , vol.11 , Issue.1 , pp. 652-657
    • Karaboga, D.1    Ozturk, C.2
  • 19
    • 37349027573 scopus 로고    scopus 로고
    • Single machine scheduling with outsourcing allowed
    • DOI 10.1016/j.ijpe.2007.02.036, PII S0925527307001053
    • Lee IS and Sung CS (2008). Single machine scheduling with outsourcing allowed. International Journal of Production Economics 111(2): 623-634. (Pubitemid 350299157)
    • (2008) International Journal of Production Economics , vol.111 , Issue.2 , pp. 623-634
    • Lee, I.S.1    Sung, C.S.2
  • 20
    • 0036643151 scopus 로고    scopus 로고
    • Multi-period job selection: Planning work loads to maximize profit
    • DOI 10.1016/S0305-0548(00)00105-2, PII S0305054800001052
    • Lewis HF and Slotnick SA (2002). Multi-period job selection: Planning work loads to maximize profit. Computers & Operations Research 29(8): 1081-1098. (Pubitemid 34196082)
    • (2002) Computers and Operations Research , vol.29 , Issue.8 , pp. 1081-1098
    • Lewis, H.F.1    Slotnick, S.A.2
  • 21
    • 78049427549 scopus 로고    scopus 로고
    • Exact algorithms for a generalization of the order acceptance and scheduling problem in a single-machine environment
    • Nobibon FT and Leus R (2011). Exact algorithms for a generalization of the order acceptance and scheduling problem in a single-machine environment. Computers & Operations Research 38(1): 367-378.
    • (2011) Computers & Operations Research , vol.38 , Issue.1 , pp. 367-378
    • Nobibon, F.T.1    Leus, R.2
  • 25
    • 56549109952 scopus 로고    scopus 로고
    • Order acceptance using genetic algorithms
    • Rom WO and Slotnick SA (2009). Order acceptance using genetic algorithms. Computers & Operations Research 36(6): 1758-1767.
    • (2009) Computers & Operations Research , vol.36 , Issue.6 , pp. 1758-1767
    • Rom, W.O.1    Slotnick, S.A.2
  • 26
    • 33750841084 scopus 로고    scopus 로고
    • A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problem
    • DOI 10.1016/j.ejor.2005.12.009, PII S0377221705008507
    • Ruiz R and Stü tzle T (2007). A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problem. European Journal Operational Research 177(3): 2033-2049. (Pubitemid 44712036)
    • (2007) European Journal of Operational Research , vol.177 , Issue.3 , pp. 2033-2049
    • Ruiz, R.1    Stutzle, T.2
  • 27
    • 58549117667 scopus 로고    scopus 로고
    • An artificial bee colony algorithm for the leafconstrained minimum spanning tree problem
    • Singh A (2009). An artificial bee colony algorithm for the leafconstrained minimum spanning tree problem. Applied Soft Computing 9(2): 631-652.
    • (2009) Applied Soft Computing , vol.9 , Issue.2 , pp. 631-652
    • Singh, A.1
  • 28
    • 79952701341 scopus 로고    scopus 로고
    • Order acceptance and scheduling: A taxonomy and review
    • Slotnick SA (2011). Order acceptance and scheduling: A taxonomy and review. European Journal of Operational Research 212(1): 1-11.
    • (2011) European Journal of Operational Research , vol.212 , Issue.1 , pp. 1-11
    • Slotnick, S.A.1
  • 29
    • 33847678988 scopus 로고    scopus 로고
    • Order acceptance with weighted tardiness
    • DOI 10.1016/j.cor.2005.11.012, PII S030505480500359X
    • Slotnick SA and Morton TE (2007). Order acceptance with weighted tardiness. Computers & Operations Research 34(10): 3029-3042. (Pubitemid 46356735)
    • (2007) Computers and Operations Research , vol.34 , Issue.10 , pp. 3029-3042
    • Slotnick, S.A.1    Morton, T.E.2
  • 30
    • 0025700113 scopus 로고
    • Selection and scheduling of textile orders with due dates
    • DOI 10.1016/0377-2217(90)90309-Y
    • Stern HI and Avivi Z (1990). The selection and scheduling of textile orders with due dates. European Journal of Operational Research 44(1): 11-16. (Pubitemid 20638473)
    • (1990) European Journal of Operational Research , vol.44 , Issue.1 , pp. 11-16
    • Stern Helman, I.1    Avivi Zion2
  • 31
    • 77956061119 scopus 로고    scopus 로고
    • Artificial bee colony (ABC) optimized edge potential function (EPF) approach to target recognition for low-altitude aircraft
    • Xu C and Duan H (2010). Artificial bee colony (ABC) optimized edge potential function (EPF) approach to target recognition for low-altitude aircraft. Pattern Recognition Letters 31(13): 1759-1772.
    • (2010) Pattern Recognition Letters , vol.31 , Issue.13 , pp. 1759-1772
    • Xu, C.1    Duan, H.2
  • 32
    • 79952698596 scopus 로고    scopus 로고
    • Heuristic approaches for solving single resource scheduling problems with job-selection flexibility
    • University of Florida
    • Yang B and Geunes J (2003). Heuristic approaches for solving single resource scheduling problems with job-selection flexibility. Technical Report, Department of Industrial and Systems Engineering, University of Florida
    • (2003) Technical Report, Department of Industrial and Systems Engineering
    • Yang, B.1    Geunes, J.2
  • 33
    • 34648825437 scopus 로고    scopus 로고
    • A single resource scheduling problem with job-selection flexibility, tardiness costs and controllable processing times
    • DOI 10.1016/j.cie.2007.02.005, PII S0360835207000800
    • Yang B and Geunes J (2007). A single resource scheduling problem with job-selection flexibility, tardiness costs and controllable processing times. Computers & Industrial Engineering 53(3): 420-432. (Pubitemid 47464779)
    • (2007) Computers and Industrial Engineering , vol.53 , Issue.3 , pp. 420-432
    • Yang, B.1    Geunes, J.2
  • 34
    • 84860805447 scopus 로고    scopus 로고
    • Unrelated parallel machine scheduling with sequence- And machine-dependent setup times and due date constraints. International Journal of Innovative Computing
    • Ying KC and Lin SW (2012). Unrelated parallel machine scheduling with sequence- And machine-dependent setup times and due date constraints. International Journal of Innovative Computing, Information and Control 8(5): 3279-3297.
    • (2012) Information and Control , vol.8 , Issue.5 , pp. 3279-3297
    • Ying, K.C.1    Lin, S.W.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.