메뉴 건너뛰기




Volumn 24, Issue 2, 1997, Pages 141-145

Job selection in a heavily loaded shop

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; APPROXIMATION THEORY; COMPUTATIONAL COMPLEXITY; JOB ANALYSIS; OPTIMIZATION; POLYNOMIALS;

EID: 0031075465     PISSN: 03050548     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0305-0548(96)00045-7     Document Type: Article
Times cited : (90)

References (8)
  • 1
    • 0030084767 scopus 로고    scopus 로고
    • Selecting jobs for a heavily loaded shop with lateness penalties
    • Slotnick, S.A. and Morton, T.E., Selecting jobs for a heavily loaded shop with lateness penalties. Computers Ops Res., 1996, 23, 131-140.
    • (1996) Computers Ops Res. , vol.23 , pp. 131-140
    • Slotnick, S.A.1    Morton, T.E.2
  • 2
    • 0024905875 scopus 로고
    • A short term production planning and scheduling model
    • Pourbabai, B., A short term production planning and scheduling model. Engng Costs Product. Econ., 1989, 18, 159-167.
    • (1989) Engng Costs Product. Econ. , vol.18 , pp. 159-167
    • Pourbabai, B.1
  • 3
    • 0008548699 scopus 로고
    • Optimal selection of orders in a just-in-time manufacturing environment: A loading model for a computer integrated manufacturing system
    • Pourbabai, B., Optimal selection of orders in a just-in-time manufacturing environment: a loading model for a computer integrated manufacturing system. Int. J. Comput. Integrated Manufact., 1992, 5, 38-44.
    • (1992) Int. J. Comput. Integrated Manufact. , vol.5 , pp. 38-44
    • Pourbabai, B.1
  • 4
    • 0008588398 scopus 로고
    • Subcontracting when there are setups, deadline and tooling costs
    • eds W. T. Scherer and D. E. Brown
    • D. L. Woodruff, Subcontracting when there are setups, deadline and tooling costs.Proceedings of Intelligent Scheduling Systems Symposium, eds W. T. Scherer and D. E. Brown, pp. 337-353, 1992.
    • (1992) Proceedings of Intelligent Scheduling Systems Symposium , pp. 337-353
    • Woodruff, D.L.1
  • 5
    • 0026880663 scopus 로고
    • Order acceptance strategies in a production-to-order environment with setup times and due-dates
    • Wester, F.A.W., Wijngaard, J. and Zijm, W.H.M., Order acceptance strategies in a production-to-order environment with setup times and due-dates. Int. J. Product. Res., 1992, 30, 1313-1326.
    • (1992) Int. J. Product. Res. , vol.30 , pp. 1313-1326
    • Wester, F.A.W.1    Wijngaard, J.2    Zijm, W.H.M.3
  • 6
    • 0027906667 scopus 로고
    • Job selection and sequencing on a single machine in a random environment
    • De, P., Ghosh, J.B. and Wells, C.E., Job selection and sequencing on a single machine in a random environment. Eur. J. Opl Res., 1993, 70, 425-431.
    • (1993) Eur. J. Opl Res. , vol.70 , pp. 425-431
    • De, P.1    Ghosh, J.B.2    Wells, C.E.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.