메뉴 건너뛰기




Volumn 51, Issue 5, 2013, Pages 1603-1617

Performance evaluation for a footwear manufacturing system with multiple production lines and different station failure rates

Author keywords

Decision making; Different failure rates; Footwear manufacturing; Multiple production lines; System reliability

Indexed keywords

CAPABILITY ANALYSIS; FAILURE RATE; MANUFACTURING NETWORKS; PERFORMANCE EVALUATION; PERFORMANCE INDICATORS; PRODUCTION LINE; PRODUCTION STRATEGY; SIMPLE ALGORITHM; SYSTEM RELIABILITY; SYSTEM STATE;

EID: 84871198164     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2012.718451     Document Type: Article
Times cited : (28)

References (25)
  • 1
    • 0029322978 scopus 로고
    • A note on state-space decomposition methods for analyzing stochastic flow networks
    • Alexopoulos, C., 1995. A note on state-space decomposition methods for analyzing stochastic flow networks. IEEE Transactions on Reliability, 44 (2), 354-357.
    • (1995) IEEE Transactions on Reliability , vol.44 , Issue.2 , pp. 354-357
    • Alexopoulos, C.1
  • 2
    • 0022200335 scopus 로고
    • Reliability evaluation of multistate systems with multistate components
    • Aven, T., 1985. Reliability evaluation of multistate systems with multistate components. IEEE Transactions on Reliability, 34 (5), 473-479.
    • (1985) IEEE Transactions on Reliability , vol.34 , Issue.5 , pp. 473-479
    • Aven, T.1
  • 3
    • 33747026665 scopus 로고    scopus 로고
    • Optimizing a production system with rework and equal sised batch shipments
    • Buscher, U. and Lindner, G., 2007. Optimizing a production system with rework and equal sised batch shipments. Computers and Operations Research, 34 (2), 515-535.
    • (2007) Computers and Operations Research , vol.34 , Issue.2 , pp. 515-535
    • Buscher, U.1    Lindner, G.2
  • 4
    • 0035277173 scopus 로고    scopus 로고
    • The maximal profit flow model in designing multiple-production-line system with obtainable resource capacity
    • Chen, M.S. and Lan, C.H., 2001. The maximal profit flow model in designing multiple-production-line system with obtainable resource capacity. International Journal of Production Economics, 70 (2), 175-184.
    • (2001) International Journal of Production Economics , vol.70 , Issue.2 , pp. 175-184
    • Chen, M.S.1    Lan, C.H.2
  • 6
    • 0021787852 scopus 로고
    • Reliability bounds for multistate systems with multistate components
    • Hudson, J.C. and Kapur, K.C., 1985. Reliability bounds for multistate systems with multistate components. Operations Research, 33 (1), 153-160.
    • (1985) Operations Research , vol.33 , Issue.1 , pp. 153-160
    • Hudson, J.C.1    Kapur, K.C.2
  • 7
    • 33845574588 scopus 로고    scopus 로고
    • The design of multiple production lines under deadline constraint
    • Lan, C.H., 2007. The design of multiple production lines under deadline constraint. International Journal of Production Economics, 106 (1), 191-203.
    • (2007) International Journal of Production Economics , vol.106 , Issue.1 , pp. 191-203
    • Lan, C.H.1
  • 8
    • 0027555709 scopus 로고
    • A network flow approach to solve clustering problems in group technology
    • Lee, H. and Garcia-Diaz, A., 1993. A network flow approach to solve clustering problems in group technology. International Journal of Production Research, 31 (3), 603-612.
    • (1993) International Journal of Production Research , vol.31 , Issue.3 , pp. 603-612
    • Lee, H.1    Garcia-Diaz, A.2
  • 9
    • 0030125981 scopus 로고    scopus 로고
    • Network flow procedures for the analysis of cellular manufacturing systems
    • Lee, H. and Garcia-Diaz, A., 1996. Network flow procedures for the analysis of cellular manufacturing systems. IIE Transactions, 28 (4), 333-345.
    • (1996) IIE Transactions , vol.28 , Issue.4 , pp. 333-345
    • Lee, H.1    Garcia-Diaz, A.2
  • 10
    • 70449659140 scopus 로고    scopus 로고
    • A stochastic dynamic programming based model for uncertain production planning of re-manufacturing system
    • Li, C., et al., 2009. A stochastic dynamic programming based model for uncertain production planning of re-manufacturing system. International Journal of Production Research, 47 (13), 3657-3668.
    • (2009) International Journal of Production Research , vol.47 , Issue.13 , pp. 3657-3668
    • Li, C.1
  • 11
    • 4544344650 scopus 로고    scopus 로고
    • Reliability of a stochastic-flow network with unreliable branches & nodes under budget constraints
    • Lin, Y.K., 2004. Reliability of a stochastic-flow network with unreliable branches & nodes under budget constraints. IEEE Transactions on Reliability, 53 (3), 381-387.
    • (2004) IEEE Transactions on Reliability , vol.53 , Issue.3 , pp. 381-387
    • Lin, Y.K.1
  • 12
    • 54449083627 scopus 로고    scopus 로고
    • Two-commodity reliability evaluation of a stochastic-flow network with varying capacity weight in terms of minimal paths
    • Lin, Y.K., 2009a. Two-commodity reliability evaluation of a stochastic-flow network with varying capacity weight in terms of minimal paths. Computers and Operations Research, 36 (4), 1050-1063.
    • (2009) Computers and Operations Research , vol.36 , Issue.4 , pp. 1050-1063
    • Lin, Y.K.1
  • 13
    • 63149163603 scopus 로고    scopus 로고
    • System reliability evaluation for a multistate supply chain network with failure nodes by using minimal paths
    • Lin, Y.K., 2009b. System reliability evaluation for a multistate supply chain network with failure nodes by using minimal paths. IEEE Transactions on Reliability, 58 (1), 34-40.
    • (2009) IEEE Transactions on Reliability , vol.58 , Issue.1 , pp. 34-40
    • Lin, Y.K.1
  • 14
    • 79959935062 scopus 로고    scopus 로고
    • Maintenance reliability estimation for a cloud computing network with nodes failure
    • Lin, Y.K. and Chang, P.C., 2011a. Maintenance reliability estimation for a cloud computing network with nodes failure. Expert Systems with Applications, 38 (11), 14185-14189.
    • (2011) Expert Systems with Applications , vol.38 , Issue.11 , pp. 14185-14189
    • Lin, Y.K.1    Chang, P.C.2
  • 16
    • 84855691471 scopus 로고    scopus 로고
    • Evaluation of system reliability for a cloud computing system with imperfect nodes
    • Lin, Y.K. and Chang, P.C., 2012a. Evaluation of system reliability for a cloud computing system with imperfect nodes. Systems Engineering, 15 (1), 83-94.
    • (2012) Systems Engineering , vol.15 , Issue.1 , pp. 83-94
    • Lin, Y.K.1    Chang, P.C.2
  • 17
    • 84868557870 scopus 로고    scopus 로고
    • System reliability of a manufacturing network with reworking action and different failure rates
    • DOI: 10.1080/00207543.2011.638939
    • Lin, Y.K. and Chang, P.C., 2012b. System reliability of a manufacturing network with reworking action and different failure rates. International Journal of Production Research, DOI: 10.1080/00207543.2011.638939.
    • (2012) International Journal of Production Research
    • Lin, Y.K.1    Chang, P.C.2
  • 18
    • 33746978678 scopus 로고    scopus 로고
    • A generic stochastic model for supply-and-return network design
    • Listes, O., 2007. A generic stochastic model for supply-and-return network design. Computers and Operations Research, 34 (2), 417-442.
    • (2007) Computers and Operations Research , vol.34 , Issue.2 , pp. 417-442
    • Listes, O.1
  • 19
    • 39449091905 scopus 로고    scopus 로고
    • A manufacturing network design model based on processor and worker capabilities
    • Paquet, M., Martel, A., and Montreuil, B., 2008. A manufacturing network design model based on processor and worker capabilities. International Journal of Production Research, 46 (7), 2009-2030.
    • (2008) International Journal of Production Research , vol.46 , Issue.7 , pp. 2009-2030
    • Paquet, M.1    Martel, A.2    Montreuil, B.3
  • 20
    • 34548410463 scopus 로고    scopus 로고
    • A decision-making model for waste management in the footwear industry
    • Staikos, T. and Rahimifard, S., 2007. A decision-making model for waste management in the footwear industry. International Journal of Production Research, 45 (18-19), 4403-4422.
    • (2007) International Journal of Production Research , vol.45 , Issue.18-19 , pp. 4403-4422
    • Staikos, T.1    Rahimifard, S.2
  • 22
    • 44649150151 scopus 로고    scopus 로고
    • Multi-product economic lot scheduling problem with separate production lines for manufacturing and remanufacturing
    • Teunter, R., Kaparis, K., and and Tang, O., 2008. Multi-product economic lot scheduling problem with separate production lines for manufacturing and remanufacturing. European Journal of Operational Research, 191 (3), 1241-1253.
    • (2008) European Journal of Operational Research , vol.191 , Issue.3 , pp. 1241-1253
    • Teunter, R.1    Kaparis, K.2    Tang, O.3
  • 23
    • 0022137745 scopus 로고
    • On multistate system analysis
    • Xue, J., 1985. On multistate system analysis. IEEE Transactions on Reliability, 34 (4), 329-337.
    • (1985) IEEE Transactions on Reliability , vol.34 , Issue.4 , pp. 329-337
    • Xue, J.1
  • 24
    • 0026133455 scopus 로고
    • Fast algorithm for computing the reliability of communication network
    • Yarlagadda, R. and Hershey, J., 1991. Fast algorithm for computing the reliability of communication network. International Journal of Electronics, 70 (3), 549-564.
    • (1991) International Journal of Electronics , vol.70 , Issue.3 , pp. 549-564
    • Yarlagadda, R.1    Hershey, J.2
  • 25
    • 34249946495 scopus 로고    scopus 로고
    • An efficient method for reliability evaluation of multistate networks given all minimal path vectors
    • Zuo, M.J., Tian, Z., and Huang, H.Z., 2007. An efficient method for reliability evaluation of multistate networks given all minimal path vectors. IIE Transactions, 39 (8), 811-817.
    • (2007) IIE Transactions , vol.39 , Issue.8 , pp. 811-817
    • Zuo, M.J.1    Tian, Z.2    Huang, H.Z.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.