메뉴 건너뛰기




Volumn 106, Issue 1, 2007, Pages 191-203

The design of multiple production lines under deadline constraint

Author keywords

Available machines; Order quantity; Production deadline; Progressive approach

Indexed keywords

COMBINATORIAL MATHEMATICS; MATHEMATICAL MODELS; PROBLEM SOLVING; PRODUCT DESIGN; SENSITIVITY ANALYSIS;

EID: 33845574588     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2006.05.012     Document Type: Article
Times cited : (27)

References (17)
  • 1
    • 0035508473 scopus 로고    scopus 로고
    • Minimizing holding and ordering costs subject to a bound on backorders is as easy as solving a single backorder cost model
    • Boyaci T., and Gallego G. Minimizing holding and ordering costs subject to a bound on backorders is as easy as solving a single backorder cost model. Operations Research Letters 29 (2001) 187-192
    • (2001) Operations Research Letters , vol.29 , pp. 187-192
    • Boyaci, T.1    Gallego, G.2
  • 2
    • 0035277173 scopus 로고    scopus 로고
    • The maximal profit flow model in designing multiple-production-line system with obtainable resource capacity
    • Chen M.S., and Lan C.H. The maximal profit flow model in designing multiple-production-line system with obtainable resource capacity. International Journal of Production Economics 70 2 (2001) 176-184
    • (2001) International Journal of Production Economics , vol.70 , Issue.2 , pp. 176-184
    • Chen, M.S.1    Lan, C.H.2
  • 3
    • 24744449915 scopus 로고    scopus 로고
    • Achieving optimal design of the production line with obtainable resource capacity
    • Chen M.S., and Lan C.H. Achieving optimal design of the production line with obtainable resource capacity. Yugoslavia Journal of Operations Research 12 2 (2002) 203-214
    • (2002) Yugoslavia Journal of Operations Research , vol.12 , Issue.2 , pp. 203-214
    • Chen, M.S.1    Lan, C.H.2
  • 4
    • 0028445470 scopus 로고
    • Parallel-machine scheduling problems with earliness and tardiness penalties
    • Cheng T.C.E., and Chen Z.L. Parallel-machine scheduling problems with earliness and tardiness penalties. Journal of the Operational Research Society 45 (1994) 685-695
    • (1994) Journal of the Operational Research Society , vol.45 , pp. 685-695
    • Cheng, T.C.E.1    Chen, Z.L.2
  • 5
    • 0024303531 scopus 로고
    • Survey of scheduling research involving due date determination decisions
    • Cheng T.C.E., and Gupta M.C. Survey of scheduling research involving due date determination decisions. European Journal of Operational Research 38 (1989) 156-166
    • (1989) European Journal of Operational Research , vol.38 , pp. 156-166
    • Cheng, T.C.E.1    Gupta, M.C.2
  • 6
    • 0033742891 scopus 로고    scopus 로고
    • Variation in production schedules-implications for both the company and its suppliers
    • Griffiths J., and Margetts D. Variation in production schedules-implications for both the company and its suppliers. Journal of Materials Processing Technology 103 1 (2000) 155-159
    • (2000) Journal of Materials Processing Technology , vol.103 , Issue.1 , pp. 155-159
    • Griffiths, J.1    Margetts, D.2
  • 7
    • 18244422888 scopus 로고    scopus 로고
    • Optimal (r, Q) inventory policies with Possion demands and lost sales: Discounted and undiscounted cases
    • Johansen S.G., and Thorstenson A. Optimal (r, Q) inventory policies with Possion demands and lost sales: Discounted and undiscounted cases. International Journal of Production Economics 46-47 (1996) 359-371
    • (1996) International Journal of Production Economics , vol.46-47 , pp. 359-371
    • Johansen, S.G.1    Thorstenson, A.2
  • 8
    • 0023362311 scopus 로고
    • A linear programming approach to capacity estimation of automated production lines with finite buffers
    • Johri P.K. A linear programming approach to capacity estimation of automated production lines with finite buffers. International Journal of Production Research 25 6 (1987) 851-866
    • (1987) International Journal of Production Research , vol.25 , Issue.6 , pp. 851-866
    • Johri, P.K.1
  • 9
    • 0031162742 scopus 로고    scopus 로고
    • Automated production line design with flexible unreliable machines for profit maximization
    • Kalir A., and Arzi Y. Automated production line design with flexible unreliable machines for profit maximization. International Journal of Production Research 35 6 (1997) 1651-1664
    • (1997) International Journal of Production Research , vol.35 , Issue.6 , pp. 1651-1664
    • Kalir, A.1    Arzi, Y.2
  • 10
    • 0032046750 scopus 로고    scopus 로고
    • Optimal design of flexible production lines with unreliable machines and infinite buffers
    • Kalir A., and Arzi Y. Optimal design of flexible production lines with unreliable machines and infinite buffers. IIE Transactions 30 (1998) 391-399
    • (1998) IIE Transactions , vol.30 , pp. 391-399
    • Kalir, A.1    Arzi, Y.2
  • 11
    • 0033728696 scopus 로고    scopus 로고
    • Evaluation and comparison of production schedules
    • Kempf K., Uzsoy R., Smith S., and Gary K. Evaluation and comparison of production schedules. Computers in Industry 42 2-3 (2000) 203-220
    • (2000) Computers in Industry , vol.42 , Issue.2-3 , pp. 203-220
    • Kempf, K.1    Uzsoy, R.2    Smith, S.3    Gary, K.4
  • 12
    • 0037206185 scopus 로고    scopus 로고
    • A polynomial algorithm for lot-size scheduling of two type tasks
    • Kovalyov M.Y., Pattloch M., and Schmidt G. A polynomial algorithm for lot-size scheduling of two type tasks. Information Processing Letters 83 4 (2002) 229-235
    • (2002) Information Processing Letters , vol.83 , Issue.4 , pp. 229-235
    • Kovalyov, M.Y.1    Pattloch, M.2    Schmidt, G.3
  • 13
    • 0000505456 scopus 로고    scopus 로고
    • On a comparison of objective function in optimal design of flexible production line with the unreliable machines
    • Lan T.S., and Lan C.H. On a comparison of objective function in optimal design of flexible production line with the unreliable machines. Journal of Information & Optimization Sciences 21 2 (2000) 221-231
    • (2000) Journal of Information & Optimization Sciences , vol.21 , Issue.2 , pp. 221-231
    • Lan, T.S.1    Lan, C.H.2
  • 14
    • 10444270256 scopus 로고    scopus 로고
    • The impact of setup costs, commonality, and capacity on schedule stability: An exploratory study
    • Meixell M.J. The impact of setup costs, commonality, and capacity on schedule stability: An exploratory study. International Journal of Production Economics 95 (2005) 95-107
    • (2005) International Journal of Production Economics , vol.95 , pp. 95-107
    • Meixell, M.J.1
  • 15
    • 33749498993 scopus 로고
    • Common due-date assignment to minimize total penalty for the one machine scheduling problem
    • Panwalker S.S., Smith M.L., and Seidman A. Common due-date assignment to minimize total penalty for the one machine scheduling problem. Operations Research 41 (1994) 33-46
    • (1994) Operations Research , vol.41 , pp. 33-46
    • Panwalker, S.S.1    Smith, M.L.2    Seidman, A.3
  • 16
    • 0031145351 scopus 로고    scopus 로고
    • Manufacturing setup cost reduction under variable lead times and finite opportunities for investment
    • Sarker B.R., and Coates E.R. Manufacturing setup cost reduction under variable lead times and finite opportunities for investment. International Journal of Production Economics 49 3 (1997) 237-247
    • (1997) International Journal of Production Economics , vol.49 , Issue.3 , pp. 237-247
    • Sarker, B.R.1    Coates, E.R.2
  • 17
    • 0027640712 scopus 로고
    • A line-balance-based capacity planning procedure for series-type robotic assembly line
    • Tzai D.M., and Yao M.J. A line-balance-based capacity planning procedure for series-type robotic assembly line. International Journal of Production Research 31 8 (1993) 1901-1920
    • (1993) International Journal of Production Research , vol.31 , Issue.8 , pp. 1901-1920
    • Tzai, D.M.1    Yao, M.J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.