-
1
-
-
0035410522
-
Modelling practical lot-sizing problems as mixed-integer programs
-
Belvaux, G. and Wolsey, L. A., Modelling practical lot-sizing problems as mixed-integer programs. Manag. Sci., 2001, 47, 993-1007.
-
(2001)
Manag. Sci.
, vol.47
, pp. 993-1007
-
-
Belvaux, G.1
Wolsey, L.A.2
-
2
-
-
27844444249
-
-
Dash Optimization: Blisworth
-
Dash Optimization, Xpress-Optimizer Reference Manual, 2002 (Dash Optimization: Blisworth).
-
(2002)
Xpress-Optimizer Reference Manual
-
-
-
3
-
-
33745996298
-
Proportional lotsizing and scheduling
-
Drexl, A. and Haase, K., Proportional lotsizing and scheduling. Int. J. Prod. Econ., 1995, 40, 73-87.
-
(1995)
Int. J. Prod. Econ.
, vol.40
, pp. 73-87
-
-
Drexl, A.1
Haase, K.2
-
4
-
-
0035351896
-
Ending inventory valuation in multiperiod production scheduling
-
Fisher, M., Ramdas, K. and Zheng, Y.-S., Ending inventory valuation in multiperiod production scheduling. Manag. Sci., 2001, 47, 679-692.
-
(2001)
Manag. Sci.
, vol.47
, pp. 679-692
-
-
Fisher, M.1
Ramdas, K.2
Zheng, Y.-S.3
-
5
-
-
0025384312
-
The discrete lot-sizing and scheduling problem
-
Fleischmann, B., The discrete lot-sizing and scheduling problem. Eur. J. Oper. Res., 1990, 44, 337-348.
-
(1990)
Eur. J. Oper. Res.
, vol.44
, pp. 337-348
-
-
Fleischmann, B.1
-
6
-
-
0037092994
-
A novel event-driven formulation for short-term scheduling of multipurpose continuous processes
-
Giannelos, N. F. and Georgiadis, M. C., A novel event-driven formulation for short-term scheduling of multipurpose continuous processes. Ind. Eng. Chem. Res., 2002, 41, 2431-2439.
-
(2002)
Ind. Eng. Chem. Res.
, vol.41
, pp. 2431-2439
-
-
Giannelos, N.F.1
Georgiadis, M.C.2
-
7
-
-
0029341661
-
A framework for modelling set-up carryover in the capacitated lotsizing problem
-
Gopalakrishnan, M., Miller, D. M. and Schmidt, C. P., A framework for modelling set-up carryover in the capacitated lotsizing problem. Int. J. Prod. Res., 1995, 33, 1973-1988.
-
(1995)
Int. J. Prod. Res.
, vol.33
, pp. 1973-1988
-
-
Gopalakrishnan, M.1
Miller, D.M.2
Schmidt, C.P.3
-
9
-
-
0026873943
-
A comparison of two lot sizing-sequencing heuristics for the process industry
-
Heuts, R. M. J., Seidel, H. P. and Selen, W. J., A comparison of two lot sizing-sequencing heuristics for the process industry. Eur. J. Oper. Res., 1992, 59, 413-424.
-
(1992)
Eur. J. Oper. Res.
, vol.59
, pp. 413-424
-
-
Heuts, R.M.J.1
Seidel, H.P.2
Selen, W.J.3
-
10
-
-
0035851992
-
A bi-index continuous-time mixed-integer linear programming model for single-stage batch scheduling with parallel units
-
Hui, C.-W. and Gupta, A., A bi-index continuous-time mixed-integer linear programming model for single-stage batch scheduling with parallel units. Ind. Eng. Chem. Res., 2001, 40, 5960-5967.
-
(2001)
Ind. Eng. Chem. Res.
, vol.40
, pp. 5960-5967
-
-
Hui, C.-W.1
Gupta, A.2
-
11
-
-
0032877613
-
Effective continuous-time formulation for short-term scheduling. 3. Multiple intermediate due dates
-
Ierapetritou, M. G., Mené, T. S. and Floudas, C. A., Effective continuous-time formulation for short-term scheduling. 3. Multiple intermediate due dates. Ind. Eng. Chem. Res., 1999, 38, 3446-3461.
-
(1999)
Ind. Eng. Chem. Res.
, vol.38
, pp. 3446-3461
-
-
Ierapetritou, M.G.1
Mené, T.S.2
Floudas, C.A.3
-
12
-
-
0442264226
-
Planning and scheduling in the process industry
-
Kallrath, J., Planning and scheduling in the process industry. OR Spect., 2002, 24, 219-250.
-
(2002)
OR Spect.
, vol.24
, pp. 219-250
-
-
Kallrath, J.1
-
13
-
-
0007097316
-
The concept of contiguity in models based on time-indexed formulations
-
edited by F. Keil, W. Mackens and J. Werther, Springer: Berlin
-
Kallrath, J., The concept of contiguity in models based on time-indexed formulations, in Scientific Computing in Chemical Engineering II, edited by F. Keil, W. Mackens and J. Werther, pp. 330-337, 1999 (Springer: Berlin).
-
(1999)
Scientific Computing in Chemical Engineering II
, pp. 330-337
-
-
Kallrath, J.1
-
14
-
-
0027545176
-
A general algorithm for short-term scheduling of batch operations - I. MILP formulation
-
Kondili, E., Pantelides, C. C. and Sargent, R. W. H., A general algorithm for short-term scheduling of batch operations - I. MILP formulation. Comput. Chem. Eng. 1993, 17, 211-227.
-
(1993)
Comput. Chem. Eng.
, vol.17
, pp. 211-227
-
-
Kondili, E.1
Pantelides, C.C.2
Sargent, R.W.H.3
-
15
-
-
0036876519
-
BASF uses a framework for developing web-based production-planning- optimization tools
-
Lee, Y. M. and Chen, E. J., BASF uses a framework for developing web-based production-planning-optimization tools. Interfaces, 2002, 32(6), 15-24.
-
(2002)
Interfaces
, vol.32
, Issue.6
, pp. 15-24
-
-
Lee, Y.M.1
Chen, E.J.2
-
16
-
-
0036138086
-
Scheduling of single-stage and continuous processes on parallel lines with intermediate due dates
-
Lee, K.-H., Heo, S.-K., Lee, H.-K. and Lee, I.-B., Scheduling of single-stage and continuous processes on parallel lines with intermediate due dates. Ind. Eng. Chem. Res., 2002, 41, 58-66.
-
(2002)
Ind. Eng. Chem. Res.
, vol.41
, pp. 58-66
-
-
Lee, K.-H.1
Heo, S.-K.2
Lee, H.-K.3
Lee, I.-B.4
-
17
-
-
0035980317
-
A novel nonuniform discrete time formulation for short-term scheduling of batch and continuous processes
-
Lee, K.-H., Park, H. I. and Lee, I.-B., A novel nonuniform discrete time formulation for short-term scheduling of batch and continuous processes. Ind. Eng. Chem. Res., 2001, 40, 4902-4911.
-
(2001)
Ind. Eng. Chem. Res.
, vol.40
, pp. 4902-4911
-
-
Lee, K.-H.1
Park, H.I.2
Lee, I.-B.3
-
18
-
-
0028715377
-
Polyhedra for lot-sizing with Wagner-Whitin costs
-
Pochet, Y. and Wolsey, L. A., Polyhedra for lot-sizing with Wagner-Whitin costs. Math. Prog. 1994, 67, 297-323.
-
(1994)
Math. Prog.
, vol.67
, pp. 297-323
-
-
Pochet, Y.1
Wolsey, L.A.2
-
20
-
-
0033886730
-
Improved rolling schedules for the dynamic single-level lot-sizing problem
-
Stadtler, H., Improved rolling schedules for the dynamic single-level lot-sizing problem. Manag. Sci., 2000, 46, 318-326.
-
(2000)
Manag. Sci.
, vol.46
, pp. 318-326
-
-
Stadtler, H.1
-
21
-
-
0141675994
-
The capacitated lot-sizing problem with linked lot-sizes
-
Suerie, C. and Stadtler, H., The capacitated lot-sizing problem with linked lot-sizes. Manag. Sci., 2003, 49, 1039-1054.
-
(2003)
Manag. Sci.
, vol.49
, pp. 1039-1054
-
-
Suerie, C.1
Stadtler, H.2
-
22
-
-
0442268855
-
Solving planning and scheduling problems with combined integer and constraint programming
-
Timpe, C., Solving planning and scheduling problems with combined integer and constraint programming. OR Spect., 2002, 24, 431-448.
-
(2002)
OR Spect.
, vol.24
, pp. 431-448
-
-
Timpe, C.1
-
23
-
-
0000555407
-
Capacitated lotsizing with set-up times
-
Trigeiro, W. W., Thomas, L. J. and McClain, J. O., Capacitated lotsizing with set-up times. Manag. Sci., 1989, 35, 353-366.
-
(1989)
Manag. Sci.
, vol.35
, pp. 353-366
-
-
Trigeiro, W.W.1
Thomas, L.J.2
McClain, J.O.3
|