-
1
-
-
34248581339
-
Characterizing the performance of process flexibility structures
-
Aksin OZ, Karaesmen F (2007) Characterizing the performance of process flexibility structures. Oper. Res. Lett. 35(4):477-484.
-
(2007)
Oper. Res. Lett.
, vol.35
, Issue.4
, pp. 477-484
-
-
Aksin, O.Z.1
Karaesmen, F.2
-
2
-
-
77955599325
-
Optimal flexibility configurations in newsvendor networks: Going beyond chaining and pairing
-
Bassamboo A, Randhawa RS, Van Mieghem JA (2010) Optimal flexibility configurations in newsvendor networks: Going beyond chaining and pairing. Management Sci. 56(8):1285-1303.
-
(2010)
Management Sci.
, vol.56
, Issue.8
, pp. 1285-1303
-
-
Bassamboo, A.1
Randhawa, R.S.2
Van Mieghem, J.A.3
-
3
-
-
14944376633
-
Managing flexible capacity in a make-to-order environment
-
Bish EK, Muriel A, Biller S (2005) Managing flexible capacity in a make-to-order environment. Management Sci. 51(2):167-180.
-
(2005)
Management Sci.
, vol.51
, Issue.2
, pp. 167-180
-
-
Bish, E.K.1
Muriel, A.2
Biller, S.3
-
4
-
-
73449122050
-
Chrysler gains edge by giving new flexibility to its factories
-
April 11
-
Boudette NE (2006) Chrysler gains edge by giving new flexibility to its factories. Wall Street J. (April 11).
-
(2006)
Wall Street J
-
-
Boudette, N.E.1
-
5
-
-
73449118940
-
Flexibility in manufacturing and services: Achievements, insights, and challenges
-
Buzacott J, Mandelbaum M (2008) Flexibility in manufacturing and services: Achievements, insights, and challenges. Flexible Services and Manufacturing J. 20(1):13-58.
-
(2008)
Flexible Services and Manufacturing J.
, vol.20
, Issue.1
, pp. 13-58
-
-
Buzacott, J.1
Mandelbaum, M.2
-
6
-
-
73449092850
-
Process flexibility: Design, evaluation, and applications
-
Chou M, Teo C-P, Zheng H (2008) Process flexibility: Design, evaluation, and applications. Flexible Services and Manufacturing J. 20(1):59-94.
-
(2008)
Flexible Services and Manufacturing J.
, vol.20
, Issue.1
, pp. 59-94
-
-
Chou, M.1
Teo, C.-P.2
Zheng, H.3
-
7
-
-
81455154857
-
Processs flexibility revisited: The graph expander and its applications
-
Chou M, Teo C-P, Zheng H (2011) Processs flexibility revisited: The graph expander and its applications. Oper. Res. 59(5):1090-1105.
-
(2011)
Oper. Res.
, vol.59
, Issue.5
, pp. 1090-1105
-
-
Chou, M.1
Teo, C.-P.2
Zheng, H.3
-
8
-
-
77955550723
-
On range and response: Dimensions of process flexibility
-
Chou MC, Chua GA, Teo C-P (2010a) On range and response: Dimensions of process flexibility. Eur. J. Oper. Res. 207(2):711-724.
-
(2010)
Eur. J. Oper. Res.
, vol.207
, Issue.2
, pp. 711-724
-
-
Chou, M.C.1
Chua, G.A.2
Teo, C.-P.3
-
9
-
-
77249176647
-
Design for process flexibility: Efficiency of the long chain and sparse structure
-
Chou MC, Chua GA, Teo C-P, Zheng H (2010b) Design for process flexibility: Efficiency of the long chain and sparse structure. Oper. Res. 58(1):43-58.
-
(2010)
Oper. Res.
, vol.58
, Issue.1
, pp. 43-58
-
-
Chou, M.C.1
Chua, G.A.2
Teo, C.-P.3
Zheng, H.4
-
10
-
-
0019590008
-
Substitutes and complements in network flow problems
-
Gale D, Politof T (1981) Substitutes and complements in network flow problems. Discrete Appl. Math. 3(3):175-186.
-
(1981)
Discrete Appl. Math.
, vol.3
, Issue.3
, pp. 175-186
-
-
Gale, D.1
Politof, T.2
-
11
-
-
0022113563
-
Substitutes, complements, and ripples in network flows
-
Granot F, Veinott AF Jr (1985) Substitutes, complements, and ripples in network flows. Math. Oper. Res. 10(3):471-497.
-
(1985)
Math. Oper. Res.
, vol.10
, Issue.3
, pp. 471-497
-
-
Granot, F.1
Veinott, Jr.A.F.2
-
13
-
-
0042266799
-
Process flexibility in supply chains
-
Graves SC, Tomlin BT (2003) Process flexibility in supply chains. Management Sci. 49(7):907-919.
-
(2003)
Management Sci.
, vol.49
, Issue.7
, pp. 907-919
-
-
Graves, S.C.1
Tomlin, B.T.2
-
15
-
-
3843105812
-
Modeling and analysis of flexible queueing systems
-
Gurumurthi S, Benjaafar S (2004) Modeling and analysis of flexible queueing systems. Naval Res. Logist. 51(5):755-782.
-
(2004)
Naval Res. Logist.
, vol.51
, Issue.5
, pp. 755-782
-
-
Gurumurthi, S.1
Benjaafar, S.2
-
16
-
-
1242309349
-
Benefits of skill chaining in serial production lines with cross-trained workers
-
Hopp WJ, Tekin E, Van Oyen MP (2004) Benefits of skill chaining in serial production lines with cross-trained workers. Management Sci. 50(1):83-98.
-
(2004)
Management Sci.
, vol.50
, Issue.1
, pp. 83-98
-
-
Hopp, W.J.1
Tekin, E.2
Van Oyen, M.P.3
-
17
-
-
14944368645
-
Structural flexibility: A new perspective on the design of manufacturing and service operations
-
Iravani SM, Van Oyen MP, Sims KT (2005) Structural flexibility: A new perspective on the design of manufacturing and service operations. Management Sci. 51(2):151-166.
-
(2005)
Management Sci.
, vol.51
, Issue.2
, pp. 151-166
-
-
Iravani, S.M.1
Van Oyen, M.P.2
Sims, K.T.3
-
18
-
-
0029290411
-
Principles on the benefits of manufacturing process flexibility
-
Jordan WC, Graves SC (1995) Principles on the benefits of manufacturing process flexibility. Management Sci. 41(4):577-594.
-
(1995)
Management Sci.
, vol.41
, Issue.4
, pp. 577-594
-
-
Jordan, W.C.1
Graves, S.C.2
-
19
-
-
79951856919
-
Stochastic programming approach to process flexibility design
-
Mak H-Y, Shen Z-J (2009) Stochastic programming approach to process flexibility design. Flexible Services and Manufacturing J. 21(3):75-91.
-
(2009)
Flexible Services and Manufacturing J.
, vol.21
, Issue.3
, pp. 75-91
-
-
Mak, H.-Y.1
Shen, Z.-J.2
-
24
-
-
34250487811
-
Gaussian elimination is not optimal
-
Strassen V (1969) Gaussian elimination is not optimal. Numerische Mathematik 13(4):354-356.
-
(1969)
Numerische Mathematik
, vol.13
, Issue.4
, pp. 354-356
-
-
Strassen, V.1
-
25
-
-
28244455337
-
A staffing algorithm for call centers with skill-based routing
-
Wallace RB, Whitt W (2005) A staffing algorithm for call centers with skill-based routing. Manufacturing Service Oper. Management 7(4):276-294.
-
(2005)
Manufacturing Service Oper. Management
, vol.7
, Issue.4
, pp. 276-294
-
-
Wallace, R.B.1
Whitt, W.2
|