메뉴 건너뛰기




Volumn 20, Issue 1-2, 2008, Pages 59-94

Process flexibility: Design, evaluation, and applications

Author keywords

Manufacturing: process flexibility; Network: maximum flow; Optimization: stochasitic programming

Indexed keywords

AUTOMOBILE MANUFACTURERS; CROSS TRAINING; FLEXIBLE PROCESS; FLEXIBLE PRODUCTION SYSTEMS; FLEXIBLE SYSTEM; IMPLEMENTATION COST; IN-PROCESS; MAXIMUM FLOWS; OPERATIONAL COSTS; PROCESS FLEXIBILITY; SERVICE COMPANIES; SERVICE INDUSTRIES; SERVICE SYSTEMS;

EID: 73449092850     PISSN: 19366582     EISSN: 19366590     Source Type: Journal    
DOI: 10.1007/s10696-008-9053-9     Document Type: Article
Times cited : (64)

References (43)
  • 1
    • 34248581339 scopus 로고    scopus 로고
    • Characterizing the performance of process flexibility structures
    • DOI 10.1016/j.orl.2006.10.002, PII S0167637706001179
    • OZ Aksin F Karaesmen 2007 Characterizing the performance of process flexibility structures Oper Res Lett 35 4 477 484 05206741 10.1016/j.orl.2006. 10.002 2333319 (Pubitemid 46755924)
    • (2007) Operations Research Letters , vol.35 , Issue.4 , pp. 477-484
    • Aksin, O.Z.1    Karaesmen, F.2
  • 3
    • 38549084246 scopus 로고    scopus 로고
    • Two-stage robust network flow and design under demand uncertainty
    • DOI 10.1287/opre.1070.0428
    • A Atamturk MH Zhang 2007 Two-stage robust network flow and design under demand uncertainty Oper Res 55 4 662 673 10.1287/opre.1070.0428 2349029 (Pubitemid 351159548)
    • (2007) Operations Research , vol.55 , Issue.4 , pp. 662-673
    • Atamturk, A.1    Zhang, M.2
  • 6
    • 0036565412 scopus 로고    scopus 로고
    • Modeling and analysis of congestion in the design of facility layouts
    • 10.1287/mnsc.48.5.679.7800
    • S Benjafaar 2002 Modeling and analysis of congestion in the design of facility layouts Management Science 48 5 679 704 10.1287/mnsc.48.5.679.7800
    • (2002) Management Science , vol.48 , Issue.5 , pp. 679-704
    • Benjafaar, S.1
  • 7
    • 12344303525 scopus 로고    scopus 로고
    • Optimal investment strategies for flexible resources, considering pricing and correlated demands
    • DOI 10.1287/opre.1040.0138
    • E Bish Q Wang 2004 Optimal investment strategies for flexible resources, considering pricing and correlated demands Operations Research 52 6 954 964 1165.91428 10.1287/opre.1040.0138 2104949 (Pubitemid 40122354)
    • (2004) Operations Research , vol.52 , Issue.6 , pp. 954-964
    • Bish, E.K.1    Wang, Q.2
  • 8
    • 14944376633 scopus 로고    scopus 로고
    • Managing flexible capacity in a make-to-order environment
    • DOI 10.1287/mnsc.1040.0322
    • E Bish A Muriel S Biller 2005 Managing flexible capacity in a make-to-order environment Management Science 51 167 180 10.1287/mnsc.1040.0322 (Pubitemid 40360160)
    • (2005) Management Science , vol.51 , Issue.2 , pp. 167-180
    • Bish, E.K.1    Muriel, A.2    Biller, S.3
  • 9
    • 73449122050 scopus 로고    scopus 로고
    • Chrysler gains edge by giving new flexibility to its factories
    • April 11
    • Boudette N (2006) Chrysler gains edge by giving new flexibility to its factories. Wall Str J, April 11
    • (2006) Wall Str J
    • Boudette, N.1
  • 11
    • 0032389620 scopus 로고    scopus 로고
    • Staffing a multiskilled workforce with varying levels of productivity: An analysis of cross-training policies
    • M Brusco T Johns 1998 Staffing a multiskilled workforce with varying levels of productivity: an analysis of cross-training policies Decision Science 29 2 499 515 10.1111/j.1540-5915.1998.tb01586.x (Pubitemid 128343733)
    • (1998) Decision Sciences , vol.29 , Issue.2 , pp. 499-515
    • Brusco, M.J.1    Johns, T.R.2
  • 15
    • 0028424243 scopus 로고
    • Flow shop scheduling with resource flexibility
    • 0809.90076 10.1287/opre.42.3.504
    • RL Daniels JB Mazzola 1994 Flow shop scheduling with resource flexibility Operations Research 42 3 504 522 0809.90076 10.1287/opre.42.3.504
    • (1994) Operations Research , vol.42 , Issue.3 , pp. 504-522
    • Daniels, R.L.1    Mazzola, J.B.2
  • 16
    • 0001691215 scopus 로고    scopus 로고
    • Scheduling parallel manufacturing cells with resource flexibility
    • 0880.90060 10.1287/mnsc.42.9.1260
    • RL Daniels BJ Hoopes JB Mazzola 1996 Scheduling parallel manufacturing cells with resource flexibility Management Science 42 9 1260 1276 0880.90060 10.1287/mnsc.42.9.1260
    • (1996) Management Science , vol.42 , Issue.9 , pp. 1260-1276
    • Daniels, R.L.1    Hoopes, B.J.2    Mazzola, J.B.3
  • 17
    • 2942562347 scopus 로고    scopus 로고
    • Flow shop scheduling with partial resource flexibility
    • 10.1287/mnsc.1040.0209
    • RL Daniels JB Mazzola D Shi 2004 Flow shop scheduling with partial resource flexibility Management Science 50 5 658 669 10.1287/mnsc.1040.0209
    • (2004) Management Science , vol.50 , Issue.5 , pp. 658-669
    • Daniels, R.L.1    Mazzola, J.B.2    Shi, D.3
  • 18
  • 19
    • 0001599465 scopus 로고
    • Optimal investment in product-flexible manufacturing capacity
    • 0699.90044 10.1287/mnsc.36.4.449 1047603
    • CH Fine RM Freund 1990 Optimal investment in product-flexible manufacturing capacity Management Science 36 4 449 466 0699.90044 10.1287/mnsc.36.4.449 1047603
    • (1990) Management Science , vol.36 , Issue.4 , pp. 449-466
    • Fine, C.H.1    Freund, R.M.2
  • 20
    • 25144440971 scopus 로고    scopus 로고
    • Revenue management of flexible products
    • DOI 10.1287/msom.1040.0054
    • G Gallego R Phillips 2004 Revenue management of flexible products Manufacturing & Service Operations Management 6 4 321 337 10.1287/msom.1040.0054 (Pubitemid 41342331)
    • (2004) Manufacturing and Service Operations Management , vol.6 , Issue.4 , pp. 321-337
    • Gallego, G.1    Phillips, R.2
  • 22
    • 0042266799 scopus 로고    scopus 로고
    • Process flexibility in supply chain
    • 10.1287/mnsc.49.7.907.16381
    • SC Graves BT Tomlin 2003 Process flexibility in supply chain Management Science 49 7 907 919 10.1287/mnsc.49.7.907.16381
    • (2003) Management Science , vol.49 , Issue.7 , pp. 907-919
    • Graves, S.C.1    Tomlin, B.T.2
  • 23
    • 3843105812 scopus 로고    scopus 로고
    • Modeling and analysis of flexible queuing systems
    • 1054.90017 10.1002/nav.20020 2071833
    • S Gurumurthi S Benjaafar 2004 Modeling and analysis of flexible queuing systems Naval Research Logistics 51 755 782 1054.90017 10.1002/nav.20020 2071833
    • (2004) Naval Research Logistics , vol.51 , pp. 755-782
    • Gurumurthi, S.1    Benjaafar, S.2
  • 24
    • 1242309349 scopus 로고    scopus 로고
    • Benefits of skill chaining in production lines with cross-trained workers
    • 10.1287/mnsc.1030.0166
    • WJ Hopp E Tekin MP Van Oyen 2004 Benefits of skill chaining in production lines with cross-trained workers Management Science 50 1 83 98 10.1287/mnsc.1030.0166
    • (2004) Management Science , vol.50 , Issue.1 , pp. 83-98
    • Hopp, W.J.1    Tekin, E.2    Van Oyen, M.P.3
  • 25
    • 14944368645 scopus 로고    scopus 로고
    • Structural flexibility: A new perspective on the design of manufacturing and service operations
    • DOI 10.1287/mnsc.1040.0333
    • SM Iravani MP Van Oyen KT Sims 2005 Structural flexibility: a new perspective on the design of manufacturing and service operations Management Science 51 2 151 166 10.1287/mnsc.1040.0333 (Pubitemid 40360159)
    • (2005) Management Science , vol.51 , Issue.2 , pp. 151-166
    • Iravani, S.M.1    Van Oyen, M.P.2    Sims, K.T.3
  • 26
    • 0029290411 scopus 로고
    • Principles on the benefits of manufacturing process flexibility
    • 0836.90087 10.1287/mnsc.41.4.577
    • WC Jordan SC Graves 1995 Principles on the benefits of manufacturing process flexibility Management Science 41 4 577 594 0836.90087 10.1287/mnsc.41.4.577
    • (1995) Management Science , vol.41 , Issue.4 , pp. 577-594
    • Jordan, W.C.1    Graves, S.C.2
  • 27
    • 0037325865 scopus 로고    scopus 로고
    • Resequencing and feature assignment on an automated assembly line
    • 10.1109/TRA.2002.807556
    • M Lahmar H Ergan S Benjaafar 2003 Resequencing and feature assignment on an automated assembly line IEEE Transactions on Robotics and Automation 19 1 89 102 10.1109/TRA.2002.807556
    • (2003) IEEE Transactions on Robotics and Automation , vol.19 , Issue.1 , pp. 89-102
    • Lahmar, M.1    Ergan, H.2    Benjaafar, S.3
  • 31
    • 73449135913 scopus 로고
    • Innovative approaches to urban transportation planning
    • 10.2307/974799
    • ES Olcott 1973 Innovative approaches to urban transportation planning Public Administration Review 33 3 215 224 10.2307/974799
    • (1973) Public Administration Review , vol.33 , Issue.3 , pp. 215-224
    • Olcott, E.S.1
  • 32
    • 0034345302 scopus 로고    scopus 로고
    • Defendens imperium romanum: A classical problem in military strategy.
    • 1039.90038 10.2307/2589113 1786232
    • CS Revelle KE Rosing 2000 Defendens imperium romanum: a classical problem in military strategy. The American Mathematical Monthly 107 7 585 594 1039.90038 10.2307/2589113 1786232
    • (2000) The American Mathematical Monthly , vol.107 , Issue.7 , pp. 585-594
    • Revelle, C.S.1    Rosing, K.E.2
  • 33
    • 0025403717 scopus 로고
    • Optimal and approximate policies in multiperiod, multilocation inventory models with transshipments
    • Robinson LW (1990) Optimal and approximate policies in multiperiod, multilocation inventory models with transshipments. Oper Res 38(2):278-295
    • (1990) Oper Res , vol.38 , Issue.2 , pp. 278-295
    • Robinson, L.W.1
  • 34
    • 23444458006 scopus 로고    scopus 로고
    • What is an expander?
    • 1161.05341 2072849
    • P Sarnak 2004 What is an expander? Notices of the AMS 51 7 762 763 1161.05341 2072849
    • (2004) Notices of the AMS , vol.51 , Issue.7 , pp. 762-763
    • Sarnak, P.1
  • 36
    • 0141975224 scopus 로고    scopus 로고
    • A survey of manufacturing flexibility: Implications for e-business
    • D Shi RL Daniels 2003 A survey of manufacturing flexibility: implications for e-business IBM Systems Journal 42 3 414 427
    • (2003) IBM Systems Journal , vol.42 , Issue.3 , pp. 414-427
    • Shi, D.1    Daniels, R.L.2
  • 37
    • 0020718128 scopus 로고
    • Formulation and solution of nonlinear integer production planning problems for flexible manufacturing systems
    • 0517.90035 10.1287/mnsc.29.3.273
    • KE Stecke 1983 Formulation and solution of nonlinear integer production planning problems for flexible manufacturing systems Management Science 29 3 273 288 0517.90035 10.1287/mnsc.29.3.273
    • (1983) Management Science , vol.29 , Issue.3 , pp. 273-288
    • Stecke, K.E.1
  • 39
    • 0000932719 scopus 로고
    • Pooling in two-location inventory systems with non-negligible replenishment lead times
    • 0761.90031 10.1287/mnsc.38.8.1067
    • G Tagaras M Cohen 1992 Pooling in two-location inventory systems with non-negligible replenishment lead times Management Science 38 8 1067 1083 0761.90031 10.1287/mnsc.38.8.1067
    • (1992) Management Science , vol.38 , Issue.8 , pp. 1067-1083
    • Tagaras, G.1    Cohen, M.2
  • 40
    • 73449115816 scopus 로고    scopus 로고
    • Flexible manufacturing in the North American automobile industry. Working Paper.
    • Van Biesebroeck J (2004) Flexible manufacturing in the North American automobile industry. Working Paper.
    • (2004)
    • Van Biesebroeck, J.1
  • 41
    • 0032136536 scopus 로고    scopus 로고
    • Investment strategies for flexible resources
    • 0989.91534 10.1287/mnsc.44.8.1071
    • JA Van Mieghem 1998 Investment strategies for flexible resources Management Science 44 8 1071 1078 0989.91534 10.1287/mnsc.44.8.1071
    • (1998) Management Science , vol.44 , Issue.8 , pp. 1071-1078
    • Van Mieghem, J.A.1
  • 42
    • 28244455337 scopus 로고    scopus 로고
    • A staffing algorithm for call centers with skill-based routing
    • 10.1287/msom.1050.0086
    • W Whitt RB Wallace 2005 A staffing algorithm for call centers with skill-based routing Manufactur Service Oper Manage 7 276 294 10.1287/msom.1050.0086
    • (2005) Manufactur Service Oper Manage , vol.7 , pp. 276-294
    • Whitt, W.1    Wallace, R.B.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.