메뉴 건너뛰기




Volumn 64, Issue , 2012, Pages 454-465

Assessing the value of retrofitting cement plants for carbon capture: A case study of a cement plant in Guangdong, China

Author keywords

Cement; China; CO2 capture; Economics; Finance; Optimisation; Retrofit

Indexed keywords

ANTHROPOGENIC GREENHOUSE GAS EMISSIONS; CARBON CAPTURE AND STORAGE; CARBON MARKETS; CARBON PRICE; CASH FLOW ANALYSIS; CEMENT MANUFACTURING; CEMENT MANUFACTURING PROCESS; CEMENT PRODUCTION; CHINA; CLIMATE POLICY; COAL-FIRED POWER PLANT; COMBINED HEAT AND POWER UNITS; DISCOUNT RATES; DRY PROCESS; ECONOMIC VIABILITY; ESTIMATED COSTS; GUANGDONG PROVINCE; HEAT AND POWER; LONG LIFETIME; MONTE CARLO SIMULATION; OPTIMISATIONS; OPTION VALUE; POST-COMBUSTION CARBON CAPTURES; REAL OPTION MODELS; RETROFIT;

EID: 84869451684     PISSN: 01968904     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.enconman.2012.04.012     Document Type: Conference Paper
Times cited : (35)

References (45)
  • 2
    • 33646686068 scopus 로고    scopus 로고
    • IPCC (Intergovernmental Panel on Climate Change) UK: Cambridge University Press
    • IPCC (Intergovernmental Panel on Climate Change). Carbon dioxide capture and storage. UK: Cambridge University Press; 2005.
    • (2005) Carbon Dioxide Capture and Storage
  • 4
    • 84870651398 scopus 로고    scopus 로고
    • NBSC (National Bureau of Statistics of China) [retrieved 20.11.11]
    • NBSC (National Bureau of Statistics of China). National statistics database; 2011 [in Chinese]. < http://219.235.129.58/welcome.do > [retrieved 20.11.11].
    • National Statistics Database; 2011 [In Chinese]
  • 6
    • 70349534599 scopus 로고    scopus 로고
    • NETL (US Department of Energy National Energy Technology Laboratory) retrieved 09.01.11
    • NETL (US Department of Energy National Energy Technology Laboratory). Carbon dioxide capture from existing coal-fired power plants. DOE/NETL-401/110907; 2007. < http://www.netl.doe.gov/energy-analyses/pubs/ CO2%20Retrofit%20From%20Existing%20Plants%20Revised%20November%202007.pdf > [retrieved 09.01.11].
    • (2007) Carbon Dioxide Capture from Existing Coal-fired Power Plants. DOE/NETL-401/110907
  • 7
    • 84870629628 scopus 로고    scopus 로고
    • IEA GHG (International Energy Agency Greenhouse Gas R&D Programme) Cheltenham, UK
    • IEA GHG (International Energy Agency Greenhouse Gas R&D Programme). CO2 capture in the cement industry. Report no. 2008/3, Cheltenham, UK.
    • CO2 Capture in the Cement Industry. Report No. 2008/3
  • 10
    • 81755175044 scopus 로고    scopus 로고
    • Vienna, Austria: United Nations Industrial Development Organization
    • Mott MacDonald. Sectoral assessment: cement. Vienna, Austria: United Nations Industrial Development Organization; 2010.
    • (2010) Sectoral Assessment: Cement
    • MacDonald, M.1
  • 14
    • 78650967383 scopus 로고    scopus 로고
    • Comparison of MEA capture cost for low CO2 emissions sources in Australia
    • M. Ho, G. Allinson, and D. Wiley Comparison of MEA capture cost for low CO2 emissions sources in Australia Int J Greenhouse Gas Control 5 2011 49 60
    • (2011) Int J Greenhouse Gas Control , vol.5 , pp. 49-60
    • Ho, M.1    Allinson, G.2    Wiley, D.3
  • 15
    • 81755179407 scopus 로고    scopus 로고
    • Comparative assessment of CO2 capture technologies for carbon-intensive industrial processes
    • T. Kuramochi, A. Ramírez, W. Turkenburg, and A. Faaij Comparative assessment of CO2 capture technologies for carbon-intensive industrial processes Prog Energy Combust Sci 38 2012 87 112
    • (2012) Prog Energy Combust Sci , vol.38 , pp. 87-112
    • Kuramochi, T.1    Ramírez, A.2    Turkenburg, W.3    Faaij, A.4
  • 16
    • 84870651241 scopus 로고    scopus 로고
    • IEA (International Energy Agency) and UNIDO (United Nations Industrial Development Organisation) retrieved 03/Feb/2012
    • IEA (International Energy Agency) and UNIDO (United Nations Industrial Development Organisation). Technology roadmap: carbon capture and storage in industrial applications; 2009. < http://www.iea.org/papers/roadmaps/ccs- industry.pdf > [retrieved 03/Feb/2012].
    • (2009) Technology Roadmap: Carbon Capture and Storage in Industrial Applications
  • 20
    • 84861595787 scopus 로고    scopus 로고
    • CO2 capture modelling for pulverised coal-fired power plants: A case study of an existing 1GW ultra-supercritical power plant in Shandong, China
    • J. Li, and X. Liang CO2 capture modelling for pulverised coal-fired power plants: A case study of an existing 1GW ultra-supercritical power plant in Shandong, China Sep Purif Technol 94 2011 138 145
    • (2011) Sep Purif Technol , vol.94 , pp. 138-145
    • Li, J.1    Liang, X.2
  • 22
    • 0038373217 scopus 로고    scopus 로고
    • Techno-economic study of CO2 capture from an existing coal-fired power plant: MEA scrubbing vs. O2/CO2 recycle combustion
    • D. Singh, E. Croiset, P.L. Douglas, and M.A. Douglas Techno-economic study of CO2 capture from an existing coal-fired power plant: MEA scrubbing vs. O2/CO2 recycle combustion Energy Convers Manage 44 2003 3073 3091
    • (2003) Energy Convers Manage , vol.44 , pp. 3073-3091
    • Singh, D.1    Croiset, E.2    Douglas, P.L.3    Douglas, M.A.4
  • 23
    • 75849130352 scopus 로고    scopus 로고
    • Retrofitting of municipal coal fired heating plant with integrated biomass gasification gas turbine based cogeneration block
    • J. Kalina Retrofitting of municipal coal fired heating plant with integrated biomass gasification gas turbine based cogeneration block Energy Convers Manage 51 5 2010 1085 1092
    • (2010) Energy Convers Manage , vol.51 , Issue.5 , pp. 1085-1092
    • Kalina, J.1
  • 24
    • 84855948509 scopus 로고    scopus 로고
    • Stakeholder views on financing carbon capture and storage projects in China
    • D. Reiner, and X. Liang Stakeholder views on financing carbon capture and storage projects in China Environ Sci Technol 46 2 2012 643 651
    • (2012) Environ Sci Technol , vol.46 , Issue.2 , pp. 643-651
    • Reiner, D.1    Liang, X.2
  • 25
    • 77953175882 scopus 로고    scopus 로고
    • Uncertainty modelling of CCS investment strategy in China's power sector
    • W. Zhou, B. Zhu, S. Fuss, J. Szolgayova, M. Oberstiner, and W. Fei Uncertainty modelling of CCS investment strategy in China's power sector Appl Energy 87 7 2010 2392 2400
    • (2010) Appl Energy , vol.87 , Issue.7 , pp. 2392-2400
    • Zhou, W.1    Zhu, B.2    Fuss, S.3    Szolgayova, J.4    Oberstiner, M.5    Fei, W.6
  • 26
    • 43549121230 scopus 로고    scopus 로고
    • Evaluating the power investment options with uncertainty in climate policy
    • M. Yang, W. Blyth, R. Bradley, D. Bunn, C. Clarke, and T. Wilson Evaluating the power investment options with uncertainty in climate policy Energy Econ 30 2008 1933 1950
    • (2008) Energy Econ , vol.30 , pp. 1933-1950
    • Yang, M.1    Blyth, W.2    Bradley, R.3    Bunn, D.4    Clarke, C.5    Wilson, T.6
  • 27
    • 80052261171 scopus 로고    scopus 로고
    • A real options-based CCS investment evaluation model: Case study of China's power generation sector
    • L. Zhu, and Y. Fan A real options-based CCS investment evaluation model: case study of China's power generation sector Appl Energy 88 12 2011 4320 4333
    • (2011) Appl Energy , vol.88 , Issue.12 , pp. 4320-4333
    • Zhu, L.1    Fan, Y.2
  • 28
    • 84869398544 scopus 로고    scopus 로고
    • CDM & JI Monitor 25 January. [retrieved 05.02.12].
    • Point Carbon; 2012. CDM & JI Monitor 25 January. < http://www.pointcarbon.com/news/cdmjien/1.1729094 > [retrieved 05.02.12].
    • (2012) Point Carbon
  • 30
    • 80053447602 scopus 로고    scopus 로고
    • Getting ready for carbon capture and storage through a 'CCS Ready Hub': A case study of Shenzhen City in Guangdong Province, China
    • J. Li, X. Liang, and T. Cockerill Getting ready for carbon capture and storage through a 'CCS Ready Hub': a case study of Shenzhen City in Guangdong Province, China Energy 36 2011 5916 5924
    • (2011) Energy , vol.36 , pp. 5916-5924
    • Li, J.1    Liang, X.2    Cockerill, T.3
  • 31
    • 84870640881 scopus 로고    scopus 로고
    • CCPIW (Chinese Coal Price Information Web) China In Chinese [retrieved 09.10.11]
    • CCPIW (Chinese Coal Price Information Web), Coal Price Information of Guangzhou City in Guangdong, China; 2011 [In Chinese]. < http://www. coalprice.cn/guangdong/ > [retrieved 09.10.11].
    • (2011) Coal Price Information of Guangzhou City in Guangdong
  • 32
    • 79951948365 scopus 로고    scopus 로고
    • A preliminary assessment on CO2 storage capacity in the Pearl River Mouth Basin offshore Guangdong, China
    • D. Zhou, Z. Zhao, J. Liao, and Z. Sun A preliminary assessment on CO2 storage capacity in the Pearl River Mouth Basin offshore Guangdong, China Int J Greenhouse Gas Control 5 2 2011 308 317
    • (2011) Int J Greenhouse Gas Control , vol.5 , Issue.2 , pp. 308-317
    • Zhou, D.1    Zhao, Z.2    Liao, J.3    Sun, Z.4
  • 33
    • 84857419724 scopus 로고    scopus 로고
    • MOEP (Ministry of Environment Protection in China) accessed 06.02.12
    • MOEP (Ministry of Environment Protection in China). Emission Standard of air pollutants for thermal power plants; 2011. < http://www.zhb.gov.cn/gkml/ hbb/bgth/201101/W020110120352208655288.pdf > [accessed 06.02.12].
    • (2011) Emission Standard of Air Pollutants for Thermal Power Plants
  • 36
    • 52949151158 scopus 로고    scopus 로고
    • Chemical-looping combustion of methane with CaSO4 oxygen carrier in a fixed bed reactor
    • Q. Song, R. Xiao, Z. Deng, H. Zhang, L. Shen, and J. Xiao Chemical-looping combustion of methane with CaSO4 oxygen carrier in a fixed bed reactor Energy Convers Manage 49 11 2008 3178 3187
    • (2008) Energy Convers Manage , vol.49 , Issue.11 , pp. 3178-3187
    • Song, Q.1    Xiao, R.2    Deng, Z.3    Zhang, H.4    Shen, L.5    Xiao, J.6
  • 40
    • 77956087533 scopus 로고    scopus 로고
    • Getting ready for carbon capture and storage by issuing capture options
    • X. Liang, J. Gibbins, D. Reiner, and J. Li Getting ready for carbon capture and storage by issuing capture options Environ Plan A 42 2010 1286 1307
    • (2010) Environ Plan A , vol.42 , pp. 1286-1307
    • Liang, X.1    Gibbins, J.2    Reiner, D.3    Li, J.4
  • 41
    • 67749093140 scopus 로고    scopus 로고
    • IEA GHG (International Energy Agency Greenhouse Gas R&D Programme) Cheltenham, UK retrieved 18.08.11
    • IEA GHG (International Energy Agency Greenhouse Gas R&D Programme). CO2 capture ready plants, technical study 2007/4, Cheltenham, UK. < http://www.iea.org/papers/2007/CO2-capture-ready-plants.pdf > [retrieved 18.08.11].
    • CO2 Capture Ready Plants, Technical Study 2007/4
  • 42
    • 79955413042 scopus 로고    scopus 로고
    • GCCSI (Global Carbon Capture and Storage Institute) Global Carbon Capture and Storage Institute retrieved 18.08.11
    • GCCSI (Global Carbon Capture and Storage Institute), Submission energy strategy approach paper, Appendix B. Global Carbon Capture and Storage Institute; 2010. < http://www.globalccsinstitute.com/downloads/general/2010/ Global-CCS-institute-response-to-WBG-Energy-Strategy-Approach-Paper.pdf > [retrieved 18.08.11].
    • (2010) Submission Energy Strategy Approach Paper, Appendix B
  • 44
    • 77956057463 scopus 로고    scopus 로고
    • Modeling flexible operation mechanism of CO2 Capture power plant and its effects on power-system operation
    • Q. Chen, C. Kang, and Q. Xia Modeling flexible operation mechanism of CO2 Capture power plant and its effects on power-system operation IEEE Trans Energy Convers 25 3 2010 853 861
    • (2010) IEEE Trans Energy Convers , vol.25 , Issue.3 , pp. 853-861
    • Chen, Q.1    Kang, C.2    Xia, Q.3
  • 45
    • 69149093660 scopus 로고    scopus 로고
    • Flexible operation of coal fired power plants with post-combustion capture of carbon dioxide
    • H. Chalmers, M. Lucquiaud, J. Gibbins, and M. Leach Flexible operation of coal fired power plants with post-combustion capture of carbon dioxide Environ Eng 135 2009 449 458
    • (2009) Environ Eng , vol.135 , pp. 449-458
    • Chalmers, H.1    Lucquiaud, M.2    Gibbins, J.3    Leach, M.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.