메뉴 건너뛰기




Volumn 25, Issue 8, 2012, Pages 1738-1751

A multi-agent system for distributed multi-project scheduling: An auction-based negotiation approach

Author keywords

Auction based negotiation; Distributed multi project scheduling; Heuristic algorithms; Multi agent system

Indexed keywords

AUCTION-BASED NEGOTIATION; DECENTRALIZED ALGORITHMS; DISTRIBUTED MULTIAGENT SYSTEMS; EXACT METHODS; GLOBAL RESOURCES; MULTI AGENT SYSTEM (MAS); MULTI-PROJECT SCHEDULING; MULTI-UNIT COMBINATORIAL AUCTIONS; MULTIPLE PROJECTS; PLANNING HORIZONS; PROBLEM INSTANCES; PROGRAMMING RELAXATIONS; PROJECT DELAYS; RESOURCE CONFLICT; SHARED RESOURCES; WINNER DETERMINATION PROBLEM;

EID: 84868324475     PISSN: 09521976     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.engappai.2011.12.003     Document Type: Article
Times cited : (121)

References (41)
  • 1
    • 34547765812 scopus 로고    scopus 로고
    • Multi-plant production scheduling in SMEs
    • E. Alvarez Multi-plant production scheduling in SMEs Robot. Comput. Integrated Manuf. 23 6 2007 608 613
    • (2007) Robot. Comput. Integrated Manuf. , vol.23 , Issue.6 , pp. 608-613
    • Alvarez, E.1
  • 3
    • 0031621768 scopus 로고    scopus 로고
    • A survey of factory control algorithms which can be implemented in a multi-agent heterarchy: Dispatching, scheduling, and pull
    • A.D. Baker A survey of factory control algorithms which can be implemented in a multi-agent heterarchy: dispatching, scheduling, and pull J. Manuf. Syst. 17 4 1998 297 320
    • (1998) J. Manuf. Syst. , vol.17 , Issue.4 , pp. 297-320
    • Baker, A.D.1
  • 6
    • 33846864716 scopus 로고    scopus 로고
    • A market-based multi-agent system model for decentralized multi-project scheduling
    • G. Confessor, S. Giordani, and S. Rismondo A market-based multi-agent system model for decentralized multi-project scheduling Ann. Oper. Res. 150 2007 115 135
    • (2007) Ann. Oper. Res. , vol.150 , pp. 115-135
    • Confessor, G.1    Giordani, S.2    Rismondo, S.3
  • 7
    • 12344281731 scopus 로고    scopus 로고
    • Supply chain coordination by means of automated negotiations
    • IEEE Computer Society, Washington, DC, USA CD-ROM
    • Fink, A.; 2004. Supply chain coordination by means of automated negotiations. In: Proceedings of the 37th Hawaii International Conference on System Sciences. IEEE Computer Society, Washington, DC, USA, pp. CD-ROM, p. 10.
    • (2004) Proceedings of the 37th Hawaii International Conference on System Sciences , pp. 10
    • Fink, A.1
  • 8
    • 40849142091 scopus 로고    scopus 로고
    • A genetic algorithm for the resource constrained multi-project scheduling problem
    • J.F. Gonçalves, J.J. Mendes, and M.G.C. Resende A genetic algorithm for the resource constrained multi-project scheduling problem Eur. J. Oper. Res. 189 3 2008 1171 1190
    • (2008) Eur. J. Oper. Res. , vol.189 , Issue.3 , pp. 1171-1190
    • Gonçalves, J.F.1    Mendes, J.J.2    Resende, M.G.C.3
  • 9
    • 77953872113 scopus 로고    scopus 로고
    • A multi-agent system for the decentralized resource-constrained multi-project scheduling
    • J. Homberger A multi-agent system for the decentralized resource-constrained multi-project scheduling Int. Trans. Oper. Res. 14 6 2007 565 589
    • (2007) Int. Trans. Oper. Res. , vol.14 , Issue.6 , pp. 565-589
    • Homberger, J.1
  • 12
    • 79551682617 scopus 로고    scopus 로고
    • Evaluating a new communication protocol for real-time distributed control
    • J. Jason, Robert Scarlett, and W. Brennan Evaluating a new communication protocol for real-time distributed control Robot. Comput. Integrated Manuf. 27 3 2011 627 635
    • (2011) Robot. Comput. Integrated Manuf. , vol.27 , Issue.3 , pp. 627-635
    • Jason, J.1    Scarlett, R.2    Brennan, W.3
  • 16
    • 0033894478 scopus 로고    scopus 로고
    • Agent-based project scheduling
    • G. Knotts, M. Dror, and B.C. Hartman Agent-based project scheduling IIE Trans. 32 2000 387 401
    • (2000) IIE Trans. , vol.32 , pp. 387-401
    • Knotts, G.1    Dror, M.2    Hartman, B.C.3
  • 17
    • 0030121479 scopus 로고    scopus 로고
    • Serial and parallel resource-constrained project scheduling methods revisited: Theory and practice
    • R. Kolisch Serial and parallel resource-constrained project scheduling methods revisited: theory and practice Eur. J. Oper. Res. 90 2 1996 320 333
    • (1996) Eur. J. Oper. Res. , vol.90 , Issue.2 , pp. 320-333
    • Kolisch, R.1
  • 18
    • 0030788844 scopus 로고    scopus 로고
    • PSPLIB - A project scheduling library
    • R. Kolisch, and A. Sprecher PSPLIB - a project scheduling library Eur. J. Oper. Res. 96 1 1996 205 216
    • (1996) Eur. J. Oper. Res. , vol.96 , Issue.1 , pp. 205-216
    • Kolisch, R.1    Sprecher, A.2
  • 19
    • 0020087944 scopus 로고
    • Multi-project scheduling: Categorization of heuristic rules performance
    • I.S. Kurtulus, and E.W. Davis Multi-project scheduling: categorization of heuristic rules performance Manage. Sci. 28 2 1982 161 172
    • (1982) Manage. Sci. , vol.28 , Issue.2 , pp. 161-172
    • Kurtulus, I.S.1    Davis, E.W.2
  • 20
    • 0033184840 scopus 로고    scopus 로고
    • On combinatorial auction and Lagrangean relaxation for distributed resource scheduling
    • E. Kutanoglu, and S.D. Wu On combinatorial auction and Lagrangean relaxation for distributed resource scheduling IIE Trans. 31 9 1999 813 826
    • (1999) IIE Trans. , vol.31 , Issue.9 , pp. 813-826
    • Kutanoglu, E.1    Wu, S.D.2
  • 21
    • 30844461556 scopus 로고    scopus 로고
    • Distributed project scheduling with information sharing in supply chains: Part i - An agent-based negotiation model
    • S.K. Lau, G.Q. Huang, K.L. Mak, and L. Liang Distributed project scheduling with information sharing in supply chains: part I - an agent-based negotiation model Int. J. Prod. Res. 43 22 2005 4813 4838
    • (2005) Int. J. Prod. Res. , vol.43 , Issue.22 , pp. 4813-4838
    • Lau, S.K.1    Huang, G.Q.2    Mak, K.L.3    Liang, L.4
  • 22
    • 30844447704 scopus 로고    scopus 로고
    • Distributed project scheduling with information sharing in supply chains: Part II - Theoretical analysis and computational study
    • S.K. Lau, G.Q. Huang, K.L. Mak, and L. Liang Distributed project scheduling with information sharing in supply chains: part II - theoretical analysis and computational study Int. J. Prod. Res. 43 23 2005 4899 4927
    • (2005) Int. J. Prod. Res. , vol.43 , Issue.23 , pp. 4899-4927
    • Lau, S.K.1    Huang, G.Q.2    Mak, K.L.3    Liang, L.4
  • 24
    • 0141885117 scopus 로고    scopus 로고
    • Multiagent based dynamic resource scheduling for distributed multiple projects using a market mechanism
    • Y.-H. Lee, S.R.T. Kumara, and K. Chatterjee Multiagent based dynamic resource scheduling for distributed multiple projects using a market mechanism J. Intell. Manuf. 14 5 2003 471 484
    • (2003) J. Intell. Manuf. , vol.14 , Issue.5 , pp. 471-484
    • Lee, Y.-H.1    Kumara, S.R.T.2    Chatterjee, K.3
  • 25
    • 70149094122 scopus 로고    scopus 로고
    • Agent-based distributed manufacturing control: A state-of-The-art survey
    • P. Leitao Agent-based distributed manufacturing control: a state-of-the-art survey Eng. Appl. Artif. Intell. 22 7 2009 979 991
    • (2009) Eng. Appl. Artif. Intell. , vol.22 , Issue.7 , pp. 979-991
    • Leitao, P.1
  • 26
    • 0035599853 scopus 로고    scopus 로고
    • Analysis of scheduling schemes and heuristic rule performance in resource- constrained multiproject scheduling
    • A. Lova, and P. Tormos Analysis of scheduling schemes and heuristic rule performance in resource- constrained multiproject scheduling Ann. Oper. Res. 102 1-4 2001 263 286
    • (2001) Ann. Oper. Res. , vol.102 , Issue.14 , pp. 263-286
    • Lova, A.1    Tormos, P.2
  • 28
    • 59249095499 scopus 로고    scopus 로고
    • Two-phase heuristics for scheduling of multiple projects
    • M.L. Mittal, and A. Kanda Two-phase heuristics for scheduling of multiple projects Int. J. Oper. Res. 4 2 2009 159 177
    • (2009) Int. J. Oper. Res. , vol.4 , Issue.2 , pp. 159-177
    • Mittal, M.L.1    Kanda, A.2
  • 29
    • 0024608832 scopus 로고
    • Multiple projects-multiple resources-constrained scheduling: Some studies
    • R.P. Mohanty, and M.K. Siddiq Multiple projects-multiple resources-constrained scheduling: some studies Int. J. Prod. Res. 27 2 1989 261 280
    • (1989) Int. J. Prod. Res. , vol.27 , Issue.2 , pp. 261-280
    • Mohanty, R.P.1    Siddiq, M.K.2
  • 30
    • 0014574409 scopus 로고
    • Multiproject scheduling with limited resources: A zero-one programming approach
    • A.A.B. Pritsker, L.J. Watters, and P.M. Wolfe Multiproject scheduling with limited resources: a zero-one programming approach Manage. Sci. 16 1 1969 93 107
    • (1969) Manage. Sci. , vol.16 , Issue.1 , pp. 93-107
    • Pritsker, A.A.B.1    Watters, L.J.2    Wolfe, P.M.3
  • 32
    • 0036467861 scopus 로고    scopus 로고
    • Algorithm for optimal winner determination in combinatorial auctions
    • T. Sandholm Algorithm for optimal winner determination in combinatorial auctions Artif. Intell. 135 2002 2002 1 54
    • (2002) Artif. Intell. , vol.135 , Issue.2002 , pp. 1-54
    • Sandholm, T.1
  • 33
    • 85133749042 scopus 로고    scopus 로고
    • An agent-based system for intelligent manufacturing: A state of the art survey
    • W. Shen, and D.H. Noorie An agent-based system for intelligent manufacturing: a state of the art survey Knowledge Inf. Syst. Int. J. 1 1999 129 156
    • (1999) Knowledge Inf. Syst. Int. J. , vol.1 , pp. 129-156
    • Shen, W.1    Noorie, D.H.2
  • 34
    • 0019180974 scopus 로고
    • The contract net protocol: High-level communication and control in a distributed problem solver
    • R.G. Smith The contract net protocol: high-level communication and control in a distributed problem solver IEEE Trans. Comput. c-29 12 1980 1104 1113
    • (1980) IEEE Trans. Comput. c-29 , vol.12 , pp. 1104-1113
    • Smith, R.G.1
  • 35
    • 77955657784 scopus 로고    scopus 로고
    • Operation allocation and part type selection in E-manufacturing: An auction based heuristic supported by agent technology
    • M.K. Tiwari, S.K. Jha, and R.B. Anand Operation allocation and part type selection in E-manufacturing: an auction based heuristic supported by agent technology Robot. Comput. Integrated Manuf. 26 4 2010 312 324
    • (2010) Robot. Comput. Integrated Manuf. , vol.26 , Issue.4 , pp. 312-324
    • Tiwari, M.K.1    Jha, S.K.2    Anand, R.B.3
  • 36
    • 70149095252 scopus 로고    scopus 로고
    • Agent-based negotiation and decision making for dynamic supply chain formation
    • M. Wang, H. Wang, D. Vogel, Kuldeep Kumar, and K.W.; Chiu Dickson Agent-based negotiation and decision making for dynamic supply chain formation Eng. Appl. Artif. Intell. 22 7 2009 1046 1055
    • (2009) Eng. Appl. Artif. Intell. , vol.22 , Issue.7 , pp. 1046-1055
    • Wang, M.1    Wang, H.2    Vogel, D.3    Kumar, K.4    Dickson, K.W.C.5
  • 40
    • 0034322761 scopus 로고    scopus 로고
    • Application of multi-agent systems in project management
    • Y. Yan, T. Kuphal, and J. Bode Application of multi-agent systems in project management Int. J. Prod. Econom. 68 2000 185 197
    • (2000) Int. J. Prod. Econom. , vol.68 , pp. 185-197
    • Yan, Y.1    Kuphal, T.2    Bode, J.3
  • 41
    • 5444268627 scopus 로고    scopus 로고
    • Bus maintenance scheduling using multi-agent systems
    • R. Zhou, B. Fox, H.P. Lee, and A.Y.C. Nee Bus maintenance scheduling using multi-agent systems Eng. Appl. Artif. Intell. 17 6 2004 623 630
    • (2004) Eng. Appl. Artif. Intell. , vol.17 , Issue.6 , pp. 623-630
    • Zhou, R.1    Fox, B.2    Lee, H.P.3    Nee, A.Y.C.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.