-
1
-
-
34547765812
-
Multi-plant production scheduling in SMEs
-
E. Alvarez Multi-plant production scheduling in SMEs Robot. Comput. Integrated Manuf. 23 6 2007 608 613
-
(2007)
Robot. Comput. Integrated Manuf.
, vol.23
, Issue.6
, pp. 608-613
-
-
Alvarez, E.1
-
3
-
-
0031621768
-
A survey of factory control algorithms which can be implemented in a multi-agent heterarchy: Dispatching, scheduling, and pull
-
A.D. Baker A survey of factory control algorithms which can be implemented in a multi-agent heterarchy: dispatching, scheduling, and pull J. Manuf. Syst. 17 4 1998 297 320
-
(1998)
J. Manuf. Syst.
, vol.17
, Issue.4
, pp. 297-320
-
-
Baker, A.D.1
-
6
-
-
33846864716
-
A market-based multi-agent system model for decentralized multi-project scheduling
-
G. Confessor, S. Giordani, and S. Rismondo A market-based multi-agent system model for decentralized multi-project scheduling Ann. Oper. Res. 150 2007 115 135
-
(2007)
Ann. Oper. Res.
, vol.150
, pp. 115-135
-
-
Confessor, G.1
Giordani, S.2
Rismondo, S.3
-
7
-
-
12344281731
-
Supply chain coordination by means of automated negotiations
-
IEEE Computer Society, Washington, DC, USA CD-ROM
-
Fink, A.; 2004. Supply chain coordination by means of automated negotiations. In: Proceedings of the 37th Hawaii International Conference on System Sciences. IEEE Computer Society, Washington, DC, USA, pp. CD-ROM, p. 10.
-
(2004)
Proceedings of the 37th Hawaii International Conference on System Sciences
, pp. 10
-
-
Fink, A.1
-
8
-
-
40849142091
-
A genetic algorithm for the resource constrained multi-project scheduling problem
-
J.F. Gonçalves, J.J. Mendes, and M.G.C. Resende A genetic algorithm for the resource constrained multi-project scheduling problem Eur. J. Oper. Res. 189 3 2008 1171 1190
-
(2008)
Eur. J. Oper. Res.
, vol.189
, Issue.3
, pp. 1171-1190
-
-
Gonçalves, J.F.1
Mendes, J.J.2
Resende, M.G.C.3
-
9
-
-
77953872113
-
A multi-agent system for the decentralized resource-constrained multi-project scheduling
-
J. Homberger A multi-agent system for the decentralized resource-constrained multi-project scheduling Int. Trans. Oper. Res. 14 6 2007 565 589
-
(2007)
Int. Trans. Oper. Res.
, vol.14
, Issue.6
, pp. 565-589
-
-
Homberger, J.1
-
12
-
-
79551682617
-
Evaluating a new communication protocol for real-time distributed control
-
J. Jason, Robert Scarlett, and W. Brennan Evaluating a new communication protocol for real-time distributed control Robot. Comput. Integrated Manuf. 27 3 2011 627 635
-
(2011)
Robot. Comput. Integrated Manuf.
, vol.27
, Issue.3
, pp. 627-635
-
-
Jason, J.1
Scarlett, R.2
Brennan, W.3
-
15
-
-
0346265970
-
Protocols for negotiating complex contracts
-
M. Klein, P. Faratin, H. Sayama, and Y. Bar-Yam Protocols for negotiating complex contracts IEEE Intell. Syst. 18 6 2003 32 38
-
(2003)
IEEE Intell. Syst.
, vol.18
, Issue.6
, pp. 32-38
-
-
Klein, M.1
Faratin, P.2
Sayama, H.3
Bar-Yam, Y.4
-
17
-
-
0030121479
-
Serial and parallel resource-constrained project scheduling methods revisited: Theory and practice
-
R. Kolisch Serial and parallel resource-constrained project scheduling methods revisited: theory and practice Eur. J. Oper. Res. 90 2 1996 320 333
-
(1996)
Eur. J. Oper. Res.
, vol.90
, Issue.2
, pp. 320-333
-
-
Kolisch, R.1
-
18
-
-
0030788844
-
PSPLIB - A project scheduling library
-
R. Kolisch, and A. Sprecher PSPLIB - a project scheduling library Eur. J. Oper. Res. 96 1 1996 205 216
-
(1996)
Eur. J. Oper. Res.
, vol.96
, Issue.1
, pp. 205-216
-
-
Kolisch, R.1
Sprecher, A.2
-
19
-
-
0020087944
-
Multi-project scheduling: Categorization of heuristic rules performance
-
I.S. Kurtulus, and E.W. Davis Multi-project scheduling: categorization of heuristic rules performance Manage. Sci. 28 2 1982 161 172
-
(1982)
Manage. Sci.
, vol.28
, Issue.2
, pp. 161-172
-
-
Kurtulus, I.S.1
Davis, E.W.2
-
20
-
-
0033184840
-
On combinatorial auction and Lagrangean relaxation for distributed resource scheduling
-
E. Kutanoglu, and S.D. Wu On combinatorial auction and Lagrangean relaxation for distributed resource scheduling IIE Trans. 31 9 1999 813 826
-
(1999)
IIE Trans.
, vol.31
, Issue.9
, pp. 813-826
-
-
Kutanoglu, E.1
Wu, S.D.2
-
21
-
-
30844461556
-
Distributed project scheduling with information sharing in supply chains: Part i - An agent-based negotiation model
-
S.K. Lau, G.Q. Huang, K.L. Mak, and L. Liang Distributed project scheduling with information sharing in supply chains: part I - an agent-based negotiation model Int. J. Prod. Res. 43 22 2005 4813 4838
-
(2005)
Int. J. Prod. Res.
, vol.43
, Issue.22
, pp. 4813-4838
-
-
Lau, S.K.1
Huang, G.Q.2
Mak, K.L.3
Liang, L.4
-
22
-
-
30844447704
-
Distributed project scheduling with information sharing in supply chains: Part II - Theoretical analysis and computational study
-
S.K. Lau, G.Q. Huang, K.L. Mak, and L. Liang Distributed project scheduling with information sharing in supply chains: part II - theoretical analysis and computational study Int. J. Prod. Res. 43 23 2005 4899 4927
-
(2005)
Int. J. Prod. Res.
, vol.43
, Issue.23
, pp. 4899-4927
-
-
Lau, S.K.1
Huang, G.Q.2
Mak, K.L.3
Liang, L.4
-
23
-
-
85008039555
-
Agent-based modeling of supply chains for distributed scheduling
-
S.K. Lau, G.Q. Huang, K.L. Mak, and L. Liang Agent-based modeling of supply chains for distributed scheduling IEEE Trans. Syst. Man Cybern. A Syst. Hum. 36 5 2006 847 861
-
(2006)
IEEE Trans. Syst. Man Cybern. A Syst. Hum.
, vol.36
, Issue.5
, pp. 847-861
-
-
Lau, S.K.1
Huang, G.Q.2
Mak, K.L.3
Liang, L.4
-
24
-
-
0141885117
-
Multiagent based dynamic resource scheduling for distributed multiple projects using a market mechanism
-
Y.-H. Lee, S.R.T. Kumara, and K. Chatterjee Multiagent based dynamic resource scheduling for distributed multiple projects using a market mechanism J. Intell. Manuf. 14 5 2003 471 484
-
(2003)
J. Intell. Manuf.
, vol.14
, Issue.5
, pp. 471-484
-
-
Lee, Y.-H.1
Kumara, S.R.T.2
Chatterjee, K.3
-
25
-
-
70149094122
-
Agent-based distributed manufacturing control: A state-of-The-art survey
-
P. Leitao Agent-based distributed manufacturing control: a state-of-the-art survey Eng. Appl. Artif. Intell. 22 7 2009 979 991
-
(2009)
Eng. Appl. Artif. Intell.
, vol.22
, Issue.7
, pp. 979-991
-
-
Leitao, P.1
-
26
-
-
0035599853
-
Analysis of scheduling schemes and heuristic rule performance in resource- constrained multiproject scheduling
-
A. Lova, and P. Tormos Analysis of scheduling schemes and heuristic rule performance in resource- constrained multiproject scheduling Ann. Oper. Res. 102 1-4 2001 263 286
-
(2001)
Ann. Oper. Res.
, vol.102
, Issue.14
, pp. 263-286
-
-
Lova, A.1
Tormos, P.2
-
28
-
-
59249095499
-
Two-phase heuristics for scheduling of multiple projects
-
M.L. Mittal, and A. Kanda Two-phase heuristics for scheduling of multiple projects Int. J. Oper. Res. 4 2 2009 159 177
-
(2009)
Int. J. Oper. Res.
, vol.4
, Issue.2
, pp. 159-177
-
-
Mittal, M.L.1
Kanda, A.2
-
29
-
-
0024608832
-
Multiple projects-multiple resources-constrained scheduling: Some studies
-
R.P. Mohanty, and M.K. Siddiq Multiple projects-multiple resources-constrained scheduling: some studies Int. J. Prod. Res. 27 2 1989 261 280
-
(1989)
Int. J. Prod. Res.
, vol.27
, Issue.2
, pp. 261-280
-
-
Mohanty, R.P.1
Siddiq, M.K.2
-
30
-
-
0014574409
-
Multiproject scheduling with limited resources: A zero-one programming approach
-
A.A.B. Pritsker, L.J. Watters, and P.M. Wolfe Multiproject scheduling with limited resources: a zero-one programming approach Manage. Sci. 16 1 1969 93 107
-
(1969)
Manage. Sci.
, vol.16
, Issue.1
, pp. 93-107
-
-
Pritsker, A.A.B.1
Watters, L.J.2
Wolfe, P.M.3
-
32
-
-
0036467861
-
Algorithm for optimal winner determination in combinatorial auctions
-
T. Sandholm Algorithm for optimal winner determination in combinatorial auctions Artif. Intell. 135 2002 2002 1 54
-
(2002)
Artif. Intell.
, vol.135
, Issue.2002
, pp. 1-54
-
-
Sandholm, T.1
-
33
-
-
85133749042
-
An agent-based system for intelligent manufacturing: A state of the art survey
-
W. Shen, and D.H. Noorie An agent-based system for intelligent manufacturing: a state of the art survey Knowledge Inf. Syst. Int. J. 1 1999 129 156
-
(1999)
Knowledge Inf. Syst. Int. J.
, vol.1
, pp. 129-156
-
-
Shen, W.1
Noorie, D.H.2
-
34
-
-
0019180974
-
The contract net protocol: High-level communication and control in a distributed problem solver
-
R.G. Smith The contract net protocol: high-level communication and control in a distributed problem solver IEEE Trans. Comput. c-29 12 1980 1104 1113
-
(1980)
IEEE Trans. Comput. c-29
, vol.12
, pp. 1104-1113
-
-
Smith, R.G.1
-
35
-
-
77955657784
-
Operation allocation and part type selection in E-manufacturing: An auction based heuristic supported by agent technology
-
M.K. Tiwari, S.K. Jha, and R.B. Anand Operation allocation and part type selection in E-manufacturing: an auction based heuristic supported by agent technology Robot. Comput. Integrated Manuf. 26 4 2010 312 324
-
(2010)
Robot. Comput. Integrated Manuf.
, vol.26
, Issue.4
, pp. 312-324
-
-
Tiwari, M.K.1
Jha, S.K.2
Anand, R.B.3
-
36
-
-
70149095252
-
Agent-based negotiation and decision making for dynamic supply chain formation
-
M. Wang, H. Wang, D. Vogel, Kuldeep Kumar, and K.W.; Chiu Dickson Agent-based negotiation and decision making for dynamic supply chain formation Eng. Appl. Artif. Intell. 22 7 2009 1046 1055
-
(2009)
Eng. Appl. Artif. Intell.
, vol.22
, Issue.7
, pp. 1046-1055
-
-
Wang, M.1
Wang, H.2
Vogel, D.3
Kumar, K.4
Dickson, K.W.C.5
-
37
-
-
84867448424
-
A game theoretic approach to decentralized multi-project scheduling (extended abstract)
-
Toronto, Canada
-
Wauters, T.; Verbeeck, K.; Vanden Berghe, G. and De Causmaecker, P.; 2010. A game theoretic approach to decentralized multi-project scheduling (extended abstract). In: Proceedings of 9th International Conference on Autonomous Agents and Multiagent Systems (AAMAS 2010), Toronto, Canada, pp. 1415-1416.
-
(2010)
Proceedings of 9th International Conference on Autonomous Agents and Multiagent Systems (AAMAS 2010)
, pp. 1415-1416
-
-
Wauters, T.1
Verbeeck, K.2
Vanden Berghe, G.3
De Causmaecker, P.4
-
40
-
-
0034322761
-
Application of multi-agent systems in project management
-
Y. Yan, T. Kuphal, and J. Bode Application of multi-agent systems in project management Int. J. Prod. Econom. 68 2000 185 197
-
(2000)
Int. J. Prod. Econom.
, vol.68
, pp. 185-197
-
-
Yan, Y.1
Kuphal, T.2
Bode, J.3
-
41
-
-
5444268627
-
Bus maintenance scheduling using multi-agent systems
-
R. Zhou, B. Fox, H.P. Lee, and A.Y.C. Nee Bus maintenance scheduling using multi-agent systems Eng. Appl. Artif. Intell. 17 6 2004 623 630
-
(2004)
Eng. Appl. Artif. Intell.
, vol.17
, Issue.6
, pp. 623-630
-
-
Zhou, R.1
Fox, B.2
Lee, H.P.3
Nee, A.Y.C.4
|