-
2
-
-
84867432197
-
Job scheduling in multiprogrammed parallel systems
-
Feitelson, D.: Job scheduling in multiprogrammed parallel systems. In: RC 19790 IBM. (1997)
-
(1997)
RC 19790 IBM
-
-
Feitelson, D.1
-
4
-
-
0024884030
-
Predictability of process resource usage: A measurement based study on unix
-
DEC
-
Devarakonda, M.V., Iyer, R.K.: Predictability of process resource usage: a measurement based study on unix. In: IEEE Trans. Software Eng. (DEC 1989) 1579-1586
-
(1989)
IEEE Trans. Software Eng.
, pp. 1579-1586
-
-
Devarakonda, M.V.1
Iyer, R.K.2
-
6
-
-
0035363047
-
Utilization, predictability, workloads, and user runtime estimates in scheduling the ibm sp2 with backfilling
-
NOV
-
Mu'alem, A., Feitelson, D.: Utilization, predictability, workloads, and user runtime estimates in scheduling the ibm sp2 with backfilling. In: IEEE J. Parallel and Distributed Comput. (NOV 2001) 529-543
-
(2001)
IEEE J. Parallel and Distributed Comput.
, pp. 529-543
-
-
Mu'Alem, A.1
Feitelson, D.2
-
7
-
-
23744462024
-
Backfilling with lookahead to optimize the packing of parallel jobs
-
SEP
-
Shmueli, E., Feitelson, D.: Backfilling with lookahead to optimize the packing of parallel jobs. In: IEEE J. Parallel and Distributed Comput. (SEP 2005) 1090-1107
-
(2005)
IEEE J. Parallel and Distributed Comput.
, pp. 1090-1107
-
-
Shmueli, E.1
Feitelson, D.2
-
11
-
-
0026232251
-
Job scheduling in a partitionable mesh using a two-dimensional buddy system partitioning scheme
-
OCT
-
Li, K., Cheng, K.H.: Job scheduling in a partitionable mesh using a two-dimensional buddy system partitioning scheme. In: IEEE Trans. Parallel and Distributed System. (OCT 1991) 413-422
-
(1991)
IEEE Trans. Parallel and Distributed System
, pp. 413-422
-
-
Li, K.1
Cheng, K.H.2
-
12
-
-
0000586245
-
Performance bounds for level-oriented two-dimensioanl packing algoritthms
-
NOV
-
Coffman, E.G., Garey, J.M.R., Johson, D.S.: Performance bounds for level-oriented two-dimensioanl packing algoritthms. In: SIAM J. Comput. (NOV 1980) 808-826
-
(1980)
SIAM J. Comput.
, pp. 808-826
-
-
Coffman, E.G.1
Garey, J.M.R.2
Johson, D.S.3
-
14
-
-
84955597092
-
The easy-loadleveler api project
-
IPPS'96 Workshop on Job Scheduling Strategies for Parallel Processing, Springer-Verlag. APR
-
Skovira, J., Chen, W., Zhou, H.: The easy-loadleveler api project. In: IPPS'96 Workshop on Job Scheduling Strategies for Parallel Processing, Volume 1162 of Lecture Notes in Computer Science, Springer-Verlag. (APR 1996) 41-47
-
(1996)
Lecture Notes in Computer Science
, vol.1162
, pp. 41-47
-
-
Skovira, J.1
Chen, W.2
Zhou, H.3
-
15
-
-
3342891257
-
The impact of migration on parallel job scheduling for distributed systems
-
AUG
-
Zhang, Y., Franke, H., Moreira, J.: The impact of migration on parallel job scheduling for distributed systems. In: 6th Euro-Par. (AUG 2000) 242-251
-
(2000)
6th Euro-Par.
, pp. 242-251
-
-
Zhang, Y.1
Franke, H.2
Moreira, J.3
-
17
-
-
0345446547
-
The workload on parallel supercomputers: Modeling the characteristics of grid jobs
-
NOV
-
Lublin, U., Feitelson, D.: The workload on parallel supercomputers: modeling the characteristics of grid jobs. In: IEEE J. Parallel and Distributed Comput. (NOV 2003) 1105-1122
-
(2003)
IEEE J. Parallel and Distributed Comput.
, pp. 1105-1122
-
-
Lublin, U.1
Feitelson, D.2
-
21
-
-
84947911285
-
Benchmarks and standards for the evaluation of parallel job schedulers
-
Job Scheduling Strategies for Parallel Processing, D. G. Feitelson and L. Rudolph (Eds.) Springer-Verlag
-
Chapin, S.J., Cirne, W., Feitelson, D.G., Jones, J.P., Leutenegger, S.T., Schwiegelshohn, U., Smith,W., Talby, D.: Benchmarks and standards for the evaluation of parallel job schedulers. In: Job Scheduling Strategies for Parallel Processing, D. G. Feitelson and L. Rudolph (Eds.), Lect. Notes Comput. Sci. vol. 1659, Springer-Verlag. (1999) 66-89
-
(1999)
Lect. Notes Comput. Sci.
, vol.1659
, pp. 66-89
-
-
Chapin, S.J.1
Cirne, W.2
Feitelson, D.G.3
Jones, J.P.4
Leutenegger, S.T.5
Schwiegelshohn, U.6
Smith, W.7
Talby, D.8
|