메뉴 건너뛰기




Volumn 12, Issue 6, 2001, Pages 529-543

Utilization, predictability, workloads, and user runtime estimates in scheduling the IBM SP2 with backfilling

Author keywords

Backfilling; Parallel job scheduling; Performance metrics; Runtime estimates; Workload modeling

Indexed keywords

BACKFILLING; PARALLEL JOB SCHEDULING;

EID: 0035363047     PISSN: 10459219     EISSN: None     Source Type: Journal    
DOI: 10.1109/71.932708     Document Type: Article
Times cited : (567)

References (27)
  • 19
    • 57849101841 scopus 로고    scopus 로고
    • Scheduling of a parallel workload: Implementation and use of the Argonne EASY scheduler at PDC
    • B. Kågström, J. Dongarra, E. Elmroth, and J. Wasniewski, eds., Springer-Verlag
    • (1998) Applied Parallel Computing , pp. 309-314
    • Malinowsky, L.1    Öster, P.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.