메뉴 건너뛰기




Volumn 1900, Issue , 2000, Pages 242-251

The impact of migration on parallel job scheduling for distributed systems

Author keywords

[No Author keywords available]

Indexed keywords

ARTIFICIAL INTELLIGENCE; COMPUTER SCIENCE; COMPUTERS;

EID: 3342891257     PISSN: 03029743     EISSN: 16113349     Source Type: Book Series    
DOI: 10.1007/3-540-44520-x_33     Document Type: Conference Paper
Times cited : (33)

References (18)
  • 4
    • 0031650009 scopus 로고    scopus 로고
    • Utilization and predictability in scheduling the IBM SP2 with backfilling
    • April
    • D. G. Feitelson and A. M. Weil. Utilization and predictability in scheduling the IBM SP2 with backfilling. In 12th International Parallel Processing Symposium, pages 542–546, April 1998.
    • (1998) 12Th International Parallel Processing Symposium , pp. 542-546
    • Feitelson, D.G.1    Weil, A.M.2
  • 5
    • 33947272883 scopus 로고    scopus 로고
    • An Evaluation of Parallel Job Scheduling for ASCIBlu e-Pacific
    • Portland, OR, November, IBM Research Report RC21559
    • H. Franke, J. Jann, J. E. Moreira, and P. Pattnaik. An Evaluation of Parallel Job Scheduling for ASCIBlu e-Pacific. In Proceedings of SC99, Portland, OR, November 1999. IBM Research Report RC21559.
    • (1999) Proceedings of SC99
    • Franke, H.1    Jann, J.2    Moreira, J.E.3    Pattnaik, P.4
  • 7
    • 0033360391 scopus 로고    scopus 로고
    • A Simulation-Based Performance Analysis of Gang Scheduling in a Distributed System
    • San Diego, CA, April 11-15
    • H. D. Karatza. A Simulation-Based Performance Analysis of Gang Scheduling in a Distributed System. In Proceedings 32nd Annual Simulation Symposium, pages 26–33, San Diego, CA, April 11-15 1999.
    • (1999) Proceedings 32Nd Annual Simulation Symposium , pp. 26-33
    • Karatza, H.D.1
  • 8
    • 84963790148 scopus 로고    scopus 로고
    • An Infrastructure for Efficient Parallel Job Execution in Terascale Computing Environments
    • Orlando, FL, November
    • J. E. Moreira, W. Chan, L. L. Fong, H. Franke, and M. A. Jette. An Infrastructure for Efficient Parallel Job Execution in Terascale Computing Environments. In Proceedings of SC98, Orlando, FL, November 1998.
    • (1998) Proceedings of SC98
    • Moreira, J.E.1    Chan, W.2    Fong, L.L.3    Franke, H.4    Jette, M.A.5
  • 10
    • 0038485347 scopus 로고
    • Load Balancing and Fault Tolerance inWorkstation Clusters – Migrating Groups of Communicating Processes
    • S. Petri and H. Langend¨orfer. Load Balancing and Fault Tolerance inWorkstation Clusters – Migrating Groups of Communicating Processes. Operating Systems Review, 29(4):25–36, October 1995.
    • (1995) Operating Systems Review , vol.29 , Issue.4 , pp. 25-36
    • Petri, S.1
  • 14
    • 2942747872 scopus 로고    scopus 로고
    • Using Run-Time Predictions to Estimate Queue Wait Times and Improve Scheduler Performance
    • April, In conjunction with IPPS/SPDP’99, Condado Plaza Hotel & Casino, San Juan, Puerto Rico
    • W. Smith, V. Taylor, and I. Foster. Using Run-Time Predictions to Estimate Queue Wait Times and Improve Scheduler Performance. In Proceedings of the 5th Annual Workshop on Job Scheduling Strategies for Parallel Processing, April 1999. In conjunction with IPPS/SPDP’99, Condado Plaza Hotel & Casino, San Juan, Puerto Rico.
    • (1999) Proceedings of the 5Th Annual Workshop on Job Scheduling Strategies for Parallel Processing
    • Smith, W.1    Taylor, V.2    Foster, I.3
  • 17
    • 0037808992 scopus 로고    scopus 로고
    • Comparing Processor Allocation Strategies in Multiprogrammed Shared-Memory Multiprocessors
    • March
    • K. K. Yue and D. J. Lilja. Comparing Processor Allocation Strategies in Multiprogrammed Shared-Memory Multiprocessors. Journal of Parallel and Distributed Computing, 49(2):245–258, March 1998.
    • (1998) Journal of Parallel and Distributed Computing , vol.49 , Issue.2 , pp. 245-258
    • Yue, K.K.1    Lilja, D.J.2
  • 18
    • 0033901383 scopus 로고    scopus 로고
    • Improving Parallel Job Scheduling by Combining Gang Scheduling and Backfilling Techniques
    • Cancun, Mexico, May
    • Y. Zhang, H. Franke, J. E. Moreira, and A. Sivasubramanian. Improving Parallel Job Scheduling by Combining Gang Scheduling and Backfilling Techniques. In Proceedings of IPDPS 2000, Cancun, Mexico, May 2000.
    • (2000) Proceedings of IPDPS 2000
    • Zhang, Y.1    Franke, H.2    Moreira, J.E.3    Sivasubramanian, A.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.