Volumn 36, Issue 16, 2012, Pages 25-30

Generator maintenance scheduling of large-scale wind power integration considering peak shaving

Author keywords

Benders decomposition; Cumulant; Generation reliability; Peak load regulating adequacy; Probabilistic production simulation; Unit maintenance; Wind power generation

Indexed keywords

BENDERS DECOMPOSITION; CUMULANTS; GENERATION RELIABILITY; PEAK-LOAD REGULATING ADEQUACY; PROBABILISTIC PRODUCTION SIMULATION;

EID: 84867419821     PISSN: 10001026     EISSN: None     Source Type: Journal    
DOI: 10.3969/j.issn.1000-1026.2012.16.005     Document Type: Article
Times cited : (16)

References (19)
  • 1
    • 77952385187 scopus 로고    scopus 로고
    • System power regulation scheme for Jiuquan wind power base
    • XIAO Chuangying, WANG Ningbo, DING Kun, et al. System power regulation scheme for Jiuquan wind power base [J]. Proceedings of the CSEE, 2010, 30(10): 1-7.
    • (2010) Proceedings of the CSEE , vol.30 , Issue.10 , pp. 1-7
    • Xiao, C.1    Wang, N.2    Ding, K.3
  • 2
    • 77957813230 scopus 로고    scopus 로고
    • Power characteristics of Jiuquan wind power base
    • XIAO Chuangying, WANG Ningbo, ZHI Jing, et al. Power characteristics of Jiuquan wind power base [J]. Automation of Electric Power Systems, 2010, 34(17): 64-67.
    • (2010) Automation of Electric Power Systems , vol.34 , Issue.17 , pp. 64-67
    • Xiao, C.1    Wang, N.2    Zhi, J.3
  • 3
    • 77952388426 scopus 로고    scopus 로고
    • Study of major questions of wind power digestion and transmission in China
    • BAI Jianhua, XIN Songxu, JIA Dexiang, et al. Study of major questions of wind power digestion and transmission in China [J]. Power System and Clean Energy, 2010(1): 14-17.
    • (2010) Power System and Clean Energy , Issue.1 , pp. 14-17
    • Bai, J.1    Xin, S.2    Jia, D.3
  • 4
    • 0035387284 scopus 로고    scopus 로고
    • The review of reliability and economy problems in generator maintenance scheduling
    • DING Ming, FENG Yongqing. The review of reliability and economy problems in generator maintenance scheduling [J]. Electric Power, 2001, 34(7): 22-25.
    • (2001) Electric Power , vol.34 , Issue.7 , pp. 22-25
    • Ding, M.1    Feng, Y.2
  • 5
    • 3142573007 scopus 로고    scopus 로고
    • Research on the modeling and algorithm to global generator and transmission maintenance scheduling
    • DING Ming, FENG Yongqing. Research on the modeling and algorithm to global generator and transmission maintenance scheduling [J]. Proceedings of the CSEE, 2004, 24(5): 18-23.
    • (2004) Proceedings of the CSEE , vol.24 , Issue.5 , pp. 18-23
    • Ding, M.1    Feng, Y.2
  • 6
    • 79959730246 scopus 로고    scopus 로고
    • Generation unit maintenance scheduling based on minimum cumulative risk algorithm for power system containing wind farms
    • ZHANG Jietan, WANG Maochun, XU Yourui, et al. Generation unit maintenance scheduling based on minimum cumulative risk algorithm for power system containing wind farms [J]. Power System Technology, 2011, 35(5): 97-102.
    • (2011) Power System Technology , vol.35 , Issue.5 , pp. 97-102
    • Zhang, J.1    Wang, M.2    Xu, Y.3
  • 7
    • 84867435549 scopus 로고    scopus 로고
    • Generator maintenance considering uncertainty of power system
    • SU Yun, ZHU Yaoming, ZHANG Jietan, et al. Generator maintenance considering uncertainty of power system [J]. Water Resources and Power, 2011, 29(5): 152-155.
    • (2011) Water Resources and Power , vol.29 , Issue.5 , pp. 152-155
    • Su, Y.1    Zhu, Y.2    Zhang, J.3
  • 8
    • 78149354084 scopus 로고    scopus 로고
    • Generation maintenance scheduling with significant wind power penetration
    • FANG Chen, XIA Qing, SUN Xin. Generation maintenance scheduling with significant wind power penetration [J]. Automation of Electric Power Systems, 2010, 34(19): 20-24.
    • (2010) Automation of Electric Power Systems , vol.34 , Issue.19 , pp. 20-24
    • Fang, C.1    Xia, Q.2    Sun, X.3
  • 9
    • 0345330176 scopus 로고    scopus 로고
    • ATC calculation with static security constraints using Benders decomposition
    • MOHAMED Shaaban, LIU Haoming, LI Weixing, et al. ATC calculation with static security constraints using Benders decomposition [J]. Proceedings of the CSEE, 2003, 23(8): 8-12.
    • (2003) Proceedings of the CSEE , vol.23 , Issue.8 , pp. 8-12
    • Mohamed, S.1    Liu, H.2    Li, W.3
  • 10
    • 0025432615 scopus 로고
    • Optimal scheduling of large hydro-thermal power system
    • BAI Xiaomin, YU Erkeng, LI Chaoan, et al. Optimal scheduling of large hydro-thermal power system [J]. Proceedings of the CSEE, 1990, 10(3): 19-26.
    • (1990) Proceedings of the CSEE , vol.10 , Issue.3 , pp. 19-26
    • Bai, X.1    Yu, E.2    Li, C.3
  • 11
    • 80051862983 scopus 로고    scopus 로고
    • Peak-load regulating adequacy evaluation associated with large-scale wind power integration
    • ZHANG Hongyu, YIN Yonghua, SHEN Hong, et al. Peak-load regulating adequacy evaluation associated with large-scale wind power integration [J]. Proceedings of the CSEE, 2011, 31(22): 28-33.
    • (2011) Proceedings of the CSEE , vol.31 , Issue.22 , pp. 28-33
    • Zhang, H.1    Yin, Y.2    Shen, H.3
  • 12
    • 84867419315 scopus 로고
    • Chinese source
    • 1990: 125-180.
    • (1990) , pp. 125-180
  • 13
    • 71849085319 scopus 로고    scopus 로고
    • Power system probabilistic production simulation including wind power plants
    • CHEN Shuyong, DAI Huizhu, BAI Xiaomin, et al. Power system probabilistic production simulation including wind power plants [J]. Electric Power, 2000, 33(3): 30-31.
    • (2000) Electric Power , vol.33 , Issue.3 , pp. 30-31
    • Chen, S.1    Dai, H.2    Bai, X.3
  • 15
    • 0019066119 scopus 로고
    • Production costing using the cumulant method of representing the equivalent load curve
    • STREMEL J P, JENKINS R T, BABB R A, et al. Production costing using the cumulant method of representing the equivalent load curve [J]. IEEE Trans on Power Apparatus and Systems, 1980, 99(5): 1947-1956.
    • (1980) IEEE Trans on Power Apparatus and Systems , vol.99 , Issue.5 , pp. 1947-1956
    • Stremel, J.P.1    Jenkins, R.T.2    Babb, R.A.3
  • 16
    • 84866002050 scopus 로고
    • Sensitivity analysis for the reliability indices of generation system
    • DING Ming, LUO Chutian. Sensitivity analysis for the reliability indices of generation system [J]. Journal of Hefei University of Technology: Natural Science, 1990, 13(3): 72-81.
    • (1990) Journal of Hefei University of Technology: Natural Science , vol.13 , Issue.3 , pp. 72-81
    • Ding, M.1    Luo, C.2
  • 17
    • 0018544097 scopus 로고
    • IEEE reliability test system
    • The Reliability Test System Task Force of the Application of Probability Methods Subcommittee
    • The Reliability Test System Task Force of the Application of Probability Methods Subcommittee. IEEE reliability test system [J]. IEEE Trans on Power Apparatus and Systems, 1979, 98(6): 2047-2054.
    • (1979) IEEE Trans on Power Apparatus and Systems , vol.98 , Issue.6 , pp. 2047-2054
  • 18
    • 19644363594 scopus 로고    scopus 로고
    • Fast algorithm of generator maintenance scheduling in electric market
    • FENG Yongqing, ZHANG Boming, WU Wenchuan, et al. Fast algorithm of generator maintenance scheduling in electric market [J]. Automation of Electric Power Systems, 2004, 28(16): 41-44.
    • (2004) Automation of Electric Power Systems , vol.28 , Issue.16 , pp. 41-44
    • Feng, Y.1    Zhang, B.2    Wu, W.3
  • 19
    • 0020648799 scopus 로고
    • The Weibull distribution function and wind power statistics
    • BOWDEN G J, BARKER P R, SHESTOPAL V O, et al. The Weibull distribution function and wind power statistics [J]. Wind Engineering, 1983, 7(2): 85-98.
    • (1983) Wind Engineering , vol.7 , Issue.2 , pp. 85-98
    • Bowden, G.J.1    Barker, P.R.2    Shestopal, V.O.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.