메뉴 건너뛰기




Volumn 28, Issue 16, 2004, Pages

Fast algorithm of generator maintenance scheduling in electricity market

Author keywords

Benders decomposition; Cumulants method; Electricity market; Generator maintenance scheduling

Indexed keywords

ALGORITHMS; ELECTRIC GENERATORS; MAINTENANCE; MATHEMATICAL MODELS; SCHEDULING;

EID: 19644363594     PISSN: 10001026     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (8)

References (12)
  • 1
    • 0035387284 scopus 로고    scopus 로고
    • The review of reliability and economy problems in generator maintenance scheduling
    • Ding Ming, Feng Yongqing. The Review of Reliability and Economy Problems in Generator Maintenance Scheduling. Electric Power, 2001, 34(7): 22-25
    • (2001) Electric Power , vol.34 , Issue.7 , pp. 22-25
    • Ding, M.1    Feng, Y.2
  • 2
    • 0039740193 scopus 로고    scopus 로고
    • Lessons from electricity market failure in california
    • Wen Fushuan, David A K. Lessons from Electricity Market Failure in California. Automation of Electric Power Systems, 2001, 25(5): 1-5
    • (2001) Automation of Electric Power Systems , vol.25 , Issue.5 , pp. 1-5
    • Wen, F.1    David, A.K.2
  • 3
    • 0031140317 scopus 로고    scopus 로고
    • Improving lagrangian of pressurized water reactor outages
    • Fabrice Fourcade, Thierry Eve, Thierry Socroun. Improving Lagrangian of Pressurized Water Reactor Outages. IEEE Trans on Power Systems, 1997, 12(2): 919-925
    • (1997) IEEE Trans on Power Systems , vol.12 , Issue.2 , pp. 919-925
    • Fourcade, F.1    Eve, T.2    Socroun, T.3
  • 4
    • 2342429662 scopus 로고    scopus 로고
    • Rethinking and enlightenment of large scope blackout in interconnected north America power grid
    • Hu Xuehao. Rethinking and Enlightenment of Large Scope Blackout in Interconnected North America Power Grid. Power System Technology, 2003, 27(9): 2-6
    • (2003) Power System Technology , vol.27 , Issue.9 , pp. 2-6
    • Hu, X.1
  • 5
    • 0142261075 scopus 로고    scopus 로고
    • Research on the optimized planned-maintenance period of turbo-generator
    • Peng Hui, Zhang Yan, Zhang Yankui, et al. Research on the Optimized Planned-maintenance Period of Turbo-generator. Proceedings of the CSEE, 2003, 23(7): 41-45
    • (2003) Proceedings of the CSEE , vol.23 , Issue.7 , pp. 41-45
    • Peng, H.1    Zhang, Y.2    Zhang, Y.3
  • 6
    • 0037173794 scopus 로고    scopus 로고
    • Research for maintenances scheduling of a turbine power plant in the electricity power market
    • Quan Hongxing, Liu Junyong. Research for Maintenances Scheduling of a Turbine Power Plant in the Electricity Power Market. Automation of Electric Power Systems, 2002, 26(14): 35-39
    • (2002) Automation of Electric Power Systems , vol.26 , Issue.14 , pp. 35-39
    • Quan, H.1    Liu, J.2
  • 7
    • 0035949726 scopus 로고    scopus 로고
    • Generator maintenance scheduling in the environment of electrical market
    • Feng Yongqing, Ding Ming. Generator Maintenance Scheduling in the Environment of Electrical Market. Automation of Electric Power Systems, 2001, 25(18): 20-23
    • (2001) Automation of Electric Power Systems , vol.25 , Issue.18 , pp. 20-23
    • Feng, Y.1    Ding, M.2
  • 8
    • 0032138729 scopus 로고    scopus 로고
    • Integrated generation and transmission maintenance scheduling with network constraints
    • Marwali M K C, Shahidehpour S M. Integrated Generation and Transmission Maintenance Scheduling with Network Constraints. IEEE Trans on Power Systems, 1998, 13(3): 1063-1068
    • (1998) IEEE Trans on Power Systems , vol.13 , Issue.3 , pp. 1063-1068
    • Marwali, M.K.C.1    Shahidehpour, S.M.2
  • 9
    • 0004479496 scopus 로고    scopus 로고
    • A probabilistic approach to generation maintenance scheduler with network constraints
    • Marwali M K C, Shahidehpour S M. A Probabilistic Approach to Generation Maintenance Scheduler with Network Constraints. Electrical Power and Energy Systems, 1999, 21(8): 533-545
    • (1999) Electrical Power and Energy Systems , vol.21 , Issue.8 , pp. 533-545
    • Marwali, M.K.C.1    Shahidehpour, S.M.2
  • 10
    • 0032592928 scopus 로고    scopus 로고
    • Long-term transmission and generation maintenance scheduling with network, fuel and emission constraints
    • Marwali M K C, Shahidehpour S M. Long-term Transmission and Generation Maintenance Scheduling with Network, Fuel and Emission Constraints. IEEE Trans on Power Systems, 1999, 14(3): 1160-1165
    • (1999) IEEE Trans on Power Systems , vol.14 , Issue.3 , pp. 1160-1165
    • Marwali, M.K.C.1    Shahidehpour, S.M.2
  • 11
    • 0004258746 scopus 로고
    • Qi Z.(transl.), Beijing: Beijing University of Science and Technology Press
    • Rao S S. Optimization Theory and Applications, Qi Zaikang, et al, trans. Beijing: Beijing University of Science and Technology Press, 1990
    • (1990) Optimization Theory and Applications
    • Rao, S.S.1
  • 12
    • 6944236609 scopus 로고
    • Reliability evaluation of generation system
    • Hefei: Hefei University of Technology
    • Ding Ming. Reliability Evaluation of Generation System. Hefei: Hefei University of Technology, 1991
    • (1991)
    • Ding, M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.