메뉴 건너뛰기




Volumn 2008, Issue , 2008, Pages 20-33

Lean principles in industrialized housing production: The need for a cultural change

Author keywords

Industrialized housing; Lean culture; Lean principles

Indexed keywords

AGILE MANUFACTURING SYSTEMS; ERRORS; HOUSING; MOTIVATION; SURVEYS;

EID: 85006444519     PISSN: None     EISSN: 15551369     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (81)

References (30)
  • 4
    • 84987619052 scopus 로고    scopus 로고
    • Competing construction management paradigms
    • Ballard, H. and Howell, G. (2004). Competing construction management paradigms. Lean Construction Journal, 1(1) 38-45.
    • (2004) Lean Construction Journal , vol.1 , Issue.1 , pp. 38-45
    • Ballard, H.1    Howell, G.2
  • 9
    • 0002908379 scopus 로고    scopus 로고
    • Construction as a manufacturing process? Similarities and differences between industrialized housing and car production in Japan
    • Gann, D.M. (1996). Construction as a manufacturing process? Similarities and differences between industrialized housing and car production in Japan. Construction Management and Economics, 14(5) 437-450.
    • (1996) Construction Management and Economics , vol.14 , Issue.5 , pp. 437-450
    • Gann, D.M.1
  • 10
    • 0000683034 scopus 로고    scopus 로고
    • Standardisation and pre-assembly – distinguishing myth from reality using case study research
    • Gibb, A.G.F. (2001). Standardisation and pre-assembly – distinguishing myth from reality using case study research. Construction Management and Economics, 19(3) 307-315.
    • (2001) Construction Management and Economics , vol.19 , Issue.3 , pp. 307-315
    • Gibb, A.G.F.1
  • 11
    • 85026665571 scopus 로고    scopus 로고
    • The future of lean construction: A brave new world
    • Julio, Brighton
    • th IGLC conference, Julio, Brighton.
    • (2000) th IGLC Conference
    • Green, S.1
  • 14
    • 0033313467 scopus 로고    scopus 로고
    • Japanese 5-S – where TQM begins
    • Ho, S.K.M. (1999). Japanese 5-S – where TQM begins. The TQM Magazine, 11(5) 311-320.
    • (1999) The TQM Magazine , vol.11 , Issue.5 , pp. 311-320
    • Ho, S.K.M.1
  • 16
    • 84866067448 scopus 로고    scopus 로고
    • Connecting lean construction to prefabrication complexity in Swedish volume element housing
    • Sydney, Australia
    • th IGLC conference, Sydney, Australia.
    • (2005) th IGLC Conference
    • Höök, M.1    Stehn, L.2
  • 17
    • 0037367928 scopus 로고    scopus 로고
    • Is structural change the primary solution to the problems of construction?
    • Koskela, L. (2003). Is structural change the primary solution to the problems of construction? Building Research & Information, 31(2) 89-96.
    • (2003) Building Research & Information , vol.31 , Issue.2 , pp. 89-96
    • Koskela, L.1
  • 18
    • 33644516041 scopus 로고    scopus 로고
    • Should project management be based on theories of economics or production?
    • Koskela, L. and Ballard, G. (2006). Should project management be based on theories of economics or production? Building research & Information, 34(2) 154-163.
    • (2006) Building Research & Information , vol.34 , Issue.2 , pp. 154-163
    • Koskela, L.1    Ballard, G.2
  • 21
    • 57749085002 scopus 로고    scopus 로고
    • Lean construction professional’s profile (LCPP): Understanding the competences of a lean construction professional
    • Michigan, USA
    • th IGLC conference, Michigan, USA.
    • (2007) th IGLC Conference
    • Pavez, I.1    Alarcón, L.F.2
  • 24
    • 0037357671 scopus 로고    scopus 로고
    • Lean manufacturing: Context, practice bundles, and performance
    • Shah, R. and Ward, P.T. (2003). Lean manufacturing: context, practice bundles, and performance. Journal of Operations Management, 21(2) 129-149.
    • (2003) Journal of Operations Management , vol.21 , Issue.2 , pp. 129-149
    • Shah, R.1    Ward, P.T.2
  • 26
    • 0036190151 scopus 로고    scopus 로고
    • A model for evaluating the degree of leanness of manufacturing firms
    • Soriano-Meier, H. and Forrester, P.L. (2002). A model for evaluating the degree of leanness of manufacturing firms. Integrated manufacturing Systems, 13(2) 104-109.
    • (2002) Integrated Manufacturing Systems , vol.13 , Issue.2 , pp. 104-109
    • Soriano-Meier, H.1    Forrester, P.L.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.