-
2
-
-
0036881796
-
Modeling impacts of process architecture on cost and schedule risk in product development
-
Browning, T.R. and Eppinger, S.D., 2002. Modeling impacts of process architecture on cost and schedule risk in product development. IEEE Transactions on Engineering Management, 49(4), 428-442.
-
(2002)
IEEE Transactions on Engineering Management
, vol.49
, Issue.4
, pp. 428-442
-
-
Browning, T.R.1
Eppinger, S.D.2
-
3
-
-
33847333101
-
Managing complex product development projects with design structure matrices and domain mapping matrices
-
Danilovic, M. and Browning, T.R., 2007. Managing complex product development projects with design structure matrices and domain mapping matrices. International Journal of Project Management, 25, 300-314.
-
(2007)
International Journal of Project Management
, vol.25
, pp. 300-314
-
-
Danilovic, M.1
Browning, T.R.2
-
4
-
-
84956987469
-
Multi agent based simulation: Beyond social simulation
-
Davidsson, P., 2001. Multi agent based simulation: beyond social simulation. Lecture Notes in Computer Science, 1979, 141-155.
-
(2001)
Lecture Notes in Computer Science
, vol.1979
, pp. 141-155
-
-
Davidsson, P.1
-
5
-
-
11144299339
-
A model-based method for organizing tasks in product development
-
Eppinger, S.D., et al., 1994. A model-based method for organizing tasks in product development. Research in Engineering Design, 6(1), 1-13.
-
(1994)
Research in Engineering Design
, vol.6
, Issue.1
, pp. 1-13
-
-
Eppinger, S.D.1
-
6
-
-
0002132859
-
Dynamic modeling of product development processes
-
Ford, D.N. and Sterman, J.D., 1998. Dynamic modeling of product development processes. System Dynamics Review, 14(1), 31-68.
-
(1998)
System Dynamics Review
, vol.14
, Issue.1
, pp. 31-68
-
-
Ford, D.N.1
Sterman, J.D.2
-
7
-
-
25144450815
-
Uses of agent-based modeling in innovation/new product development research
-
Garcia, R., 2010. Uses of agent-based modeling in innovation/new product development research. Journal of Product Innovation Management, 22(5), 380-398.
-
(2010)
Journal of Product Innovation Management
, vol.22
, Issue.5
, pp. 380-398
-
-
Garcia, R.1
-
8
-
-
34250655342
-
Modeling and analyzing cultural influences on project team performance
-
Horii, T., Jin, Y., and Levitt, R.T., 2004. Modeling and analyzing cultural influences on project team performance. Computational & Mathematical Organization Theory, 10, 305-321.
-
(2004)
Computational & Mathematical Organization Theory
, vol.10
, pp. 305-321
-
-
Horii, T.1
Jin, Y.2
Levitt, R.T.3
-
9
-
-
0000676522
-
The virtual design team: A computational model of project organizations
-
Jin, Y. and Levitt, R.E., 1996. The Virtual Design Team: a computational model of project organizations. Computational & Mathematical Organization Theory, 12(3), 171-196.
-
(1996)
Computational & Mathematical Organization Theory
, vol.12
, Issue.3
, pp. 171-196
-
-
Jin, Y.1
Levitt, R.E.2
-
10
-
-
33750065757
-
Competence management for the optimization of product development process
-
Krause, K.F.-L., et al., 2006. Competence management for the optimization of product development process. CIRP Annuals-Manufacturing Technology, 55(1), 135-138.
-
(2006)
CIRP Annuals-Manufacturing Technology
, vol.55
, Issue.1
, pp. 135-138
-
-
Krause, K.F.-L.1
-
11
-
-
40849113367
-
An agent-based dynamic routing strategy for automated material handling systems
-
Lau, H.Y.K. and Woo, S.O., 2008. An agent-based dynamic routing strategy for automated material handling systems. International Journal of Computer Integrated Manufacturing, 21(3), 269-288.
-
(2008)
International Journal of Computer Integrated Manufacturing
, vol.21
, Issue.3
, pp. 269-288
-
-
Lau, H.Y.K.1
Woo, S.O.2
-
12
-
-
58149290887
-
Person-centered simulation and product development processes
-
Licht, T., et al., 2007. Person-centered simulation and product development processes. International Journal of Simulation and Process Modelling, 3(3), 1-32.
-
(2007)
International Journal of Simulation and Process Modelling
, vol.3
, Issue.3
, pp. 1-32
-
-
Licht, T.1
-
13
-
-
70449569039
-
Towards a standardised framework for a multi-agent system approach for cooperation in an original design manufacturing
-
Lin, J.S., Chao, O.Y., and Juan, Y.C., 2009. Towards a standardised framework for a multi-agent system approach for cooperation in an original design manufacturing. International Journal of Computer Integrated Manufacturing, 22(6), 494-514.
-
(2009)
International Journal of Computer Integrated Manufacturing
, vol.22
, Issue.6
, pp. 494-514
-
-
Lin, J.S.1
Chao, O.Y.2
Juan, Y.C.3
-
15
-
-
0036674345
-
Forgetting curves: Implications for connectionist models
-
Sikstroem S., 2002. Forgetting curves: implications for connectionist models. Cognitive Psychology, 45, 95-152.
-
(2002)
Cognitive Psychology
, vol.45
, pp. 95-152
-
-
Sikstroem, S.1
-
16
-
-
0019597497
-
The design structure system: A method for managing the design of complex systems
-
Steward, D.V., 1981. The design structure system: a method for managing the design of complex systems. IEEE Transactions on Engineering Management, 8, 71-74.
-
(1981)
IEEE Transactions on Engineering Management
, vol.8
, pp. 71-74
-
-
Steward, D.V.1
-
17
-
-
66049110085
-
Agent-based computational economics: A constructive approach to economic theory
-
Tesfatsion, L., 2006. Agent-based computational economics: a constructive approach to economic theory. Handbook of Computational Economics, 2, 831-880.
-
(2006)
Handbook of Computational Economics
, vol.2
, pp. 831-880
-
-
Tesfatsion, L.1
-
18
-
-
3042712427
-
Modeling and analysis of collaborative design activities using fuzzy-timing highlevel Petri Nets
-
Tian, F., Li, R., and Zhang, J., 2004. Modeling and analysis of collaborative design activities using fuzzy-timing highlevel Petri Nets. Journal of Computer Aided Design & Computer Graphics, 16(3), 267-274.
-
(2004)
Journal of Computer Aided Design & Computer Graphics
, vol.16
, Issue.3
, pp. 267-274
-
-
Tian, F.1
Li, R.2
Zhang, J.3
-
19
-
-
67651149500
-
Coordinating dispersed product development processes: A contingency perspective of project design and modeling
-
To, C.K.M., et al., 2009. Coordinating dispersed product development processes: a contingency perspective of project design and modeling. International Journal of Production Economics, 120, 570-584.
-
(2009)
International Journal of Production Economics
, vol.120
, pp. 570-584
-
-
To, C.K.M.1
-
20
-
-
0142247355
-
A multi-agent and distributed ruler based approach to production scheduling of agile manufacturing systems
-
Wang, Y.H., Yin, C.W., and Zhang, Y., 2003. A multi-agent and distributed ruler based approach to production scheduling of agile manufacturing systems. International Journal of Computer Integrated Manufacturing, 6(2), 81-92.
-
(2003)
International Journal of Computer Integrated Manufacturing
, vol.6
, Issue.2
, pp. 81-92
-
-
Wang, Y.H.1
Yin, C.W.2
Zhang, Y.3
-
21
-
-
0037671468
-
Modeling, scheduling and simulation of product development process by extended stochastic high-level evaluation Petri Nets
-
Yan, H.S., Zheng, W., and Jiao, X.C., 2003. Modeling, scheduling and simulation of product development process by extended stochastic high-level evaluation Petri Nets. Robotics and Computer Integrated Manufacturing, 19, 329-349.
-
(2003)
Robotics and Computer Integrated Manufacturing
, vol.19
, pp. 329-349
-
-
Yan, H.S.1
Zheng, W.2
Jiao, X.C.3
-
22
-
-
20544462033
-
Resources management and simulation of product development
-
Zu, X., et al., 2005. Resources management and simulation of product development. Journal of System Simulation, 17(6), 1322-1325.
-
(2005)
Journal of System Simulation
, vol.17
, Issue.6
, pp. 1322-1325
-
-
Zu, X.1
-
24
-
-
70350368401
-
A simulation approach for evaluation and improvement of organizational planning in collaborative product development projects
-
Zhang, X., Luo, L., and Yang, Y., 2009. A simulation approach for evaluation and improvement of organizational planning in collaborative product development projects. International Journal of Production Research, 47(13), 3471-3501.
-
(2009)
International Journal of Production Research
, vol.47
, Issue.13
, pp. 3471-3501
-
-
Zhang, X.1
Luo, L.2
Yang, Y.3
-
25
-
-
76249104439
-
Agent-based workflow management for RFID-enabled real-time reconfigurable manufacturing
-
Zhang, Y., et al., 2010. Agent-based workflow management for RFID-enabled real-time reconfigurable manufacturing. International Journal of Computer Integrated Manufacturing, 23(2), 101-112.
-
(2010)
International Journal of Computer Integrated Manufacturing
, vol.23
, Issue.2
, pp. 101-112
-
-
Zhang, Y.1
|