메뉴 건너뛰기




Volumn 120, Issue 2, 2009, Pages 570-584

Coordinating dispersed product development processes: A contingency perspective of project design and modelling

Author keywords

Interdependency; Process design; Product development; Project organizations; Simulation based optimization

Indexed keywords

COMPUTATION PROCESS; CONTINGENCY PERSPECTIVE; COORDINATION AND CONTROL; DATA CAPTURE; DEVELOPMENT ACTIVITY; EVALUATION STRATEGIES; INTERACTIVITY; INTERDEPENDENCY; MANUFACTURING DESIGN; PIPELINE OPERATION; PROCESS INTERACTION; PROCESS PERFORMANCE; PRODUCT DEVELOPMENT PROCESS; PRODUCT DEVELOPMENT SYSTEM; PRODUCT VALUE; PROJECT DESIGNS; PROJECT ORGANIZATIONS; SIMULATION-BASED OPTIMIZATION; SIMULATION-BASED OPTIMIZATIONS; STRUCTURED INFORMATION;

EID: 67651149500     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2009.03.014     Document Type: Article
Times cited : (10)

References (36)
  • 1
    • 31744434154 scopus 로고    scopus 로고
    • A simulation-based optimization framework for product development cycle time reduction
    • Abdelsalsam H., and Bao H. A simulation-based optimization framework for product development cycle time reduction. IEEE Transactions on Engineering Management 53 1 (2006) 69-85
    • (2006) IEEE Transactions on Engineering Management , vol.53 , Issue.1 , pp. 69-85
    • Abdelsalsam, H.1    Bao, H.2
  • 2
    • 0040809885 scopus 로고
    • The information-integrated channel: a study of the US apparel industry in transition
    • Baily M. (Ed), Brookings Institute, Washington, DC
    • Abernathy F., Dunlop J., and Weil D. The information-integrated channel: a study of the US apparel industry in transition. In: Baily M. (Ed). Brookings Papers on Microeconomic Activity (1995), Brookings Institute, Washington, DC 175-246
    • (1995) Brookings Papers on Microeconomic Activity , pp. 175-246
    • Abernathy, F.1    Dunlop, J.2    Weil, D.3
  • 5
    • 0036881796 scopus 로고    scopus 로고
    • Modeling impacts of process architecture on cost and schedule risk in product development
    • Browning T., and Eppinger S. Modeling impacts of process architecture on cost and schedule risk in product development. IEEE Transactions on Engineering Management 49 4 (2002) 428-442
    • (2002) IEEE Transactions on Engineering Management , vol.49 , Issue.4 , pp. 428-442
    • Browning, T.1    Eppinger, S.2
  • 6
    • 85037347093 scopus 로고    scopus 로고
    • Using the design structure matrix to estimate product development time
    • 98, Atlanta, Georgia, USA, pp
    • Carrascosa, M., Eppinger, S., Whitney, D., 1998. Using the design structure matrix to estimate product development time. In: Proceedings of DETC '98, Atlanta, Georgia, USA, pp. 1-10.
    • (1998) Proceedings of DETC , pp. 1-10
    • Carrascosa, M.1    Eppinger, S.2    Whitney, D.3
  • 9
    • 0012260296 scopus 로고    scopus 로고
    • Optimization for simulation: theory vs. practice
    • Summer
    • Fu M.C. Optimization for simulation: theory vs. practice. INFORMS Journal on Computing 14 3 (2002) 192-215 Summer
    • (2002) INFORMS Journal on Computing , vol.14 , Issue.3 , pp. 192-215
    • Fu, M.C.1
  • 12
    • 0032070270 scopus 로고    scopus 로고
    • An examination of collaboration in high technology new product development process
    • Jassawalla A.R., and Sashittal H.C. An examination of collaboration in high technology new product development process. Journal of Product Innovation Management 15 3 (1998) 237-254
    • (1998) Journal of Product Innovation Management , vol.15 , Issue.3 , pp. 237-254
    • Jassawalla, A.R.1    Sashittal, H.C.2
  • 13
    • 0031161041 scopus 로고    scopus 로고
    • New validations of PERT times
    • Kamburowski J. New validations of PERT times. Omega 25 3 (1997) 323-328
    • (1997) Omega , vol.25 , Issue.3 , pp. 323-328
    • Kamburowski, J.1
  • 15
    • 0031353467 scopus 로고    scopus 로고
    • Simplifying iterations in crossfunctional design decision making
    • Krishnan V., Eppinger S., and Whitney D. Simplifying iterations in crossfunctional design decision making. Journal of Mechanic Design 119 4 (1997) 485-493
    • (1997) Journal of Mechanic Design , vol.119 , Issue.4 , pp. 485-493
    • Krishnan, V.1    Eppinger, S.2    Whitney, D.3
  • 16
  • 18
    • 36148966092 scopus 로고    scopus 로고
    • Estimating the duration of stochastic workflow for product development process
    • Lee H.J., and Suh H.-W. Estimating the duration of stochastic workflow for product development process. International Journal of Production Economics 111 1 (2008) 105-117
    • (2008) International Journal of Production Economics , vol.111 , Issue.1 , pp. 105-117
    • Lee, H.J.1    Suh, H.-W.2
  • 20
    • 0033358240 scopus 로고    scopus 로고
    • Simulating project work processes and organizations: toward a micro-contingent theory of organizational design
    • Levitt E.R., Thomsen J., Christiansen T.R., Kunz J., Jin Y., and Nass C. Simulating project work processes and organizations: toward a micro-contingent theory of organizational design. Management Science 45 11 (1999) 1479-1495
    • (1999) Management Science , vol.45 , Issue.11 , pp. 1479-1495
    • Levitt, E.R.1    Thomsen, J.2    Christiansen, T.R.3    Kunz, J.4    Jin, Y.5    Nass, C.6
  • 21
    • 24744457709 scopus 로고    scopus 로고
    • Analyzing the activity of multidisciplinary teams in the early stages of conceptual design: method and measure
    • Scrivener, Ball, and Woodcock (Eds), Springer-Verlag, London. 1852333413
    • Milne A.J. Analyzing the activity of multidisciplinary teams in the early stages of conceptual design: method and measure. In: Scrivener, Ball, and Woodcock (Eds). Collaborative Design (2000), Springer-Verlag, London. 1852333413
    • (2000) Collaborative Design
    • Milne, A.J.1
  • 22
    • 76649083296 scopus 로고
    • The relevance of the structural-contingency model for organizational effectiveness
    • Pennings J.M. The relevance of the structural-contingency model for organizational effectiveness. Administrative Science Quarterly 20 (1975) 825-840
    • (1975) Administrative Science Quarterly , vol.20 , pp. 825-840
    • Pennings, J.M.1
  • 23
    • 0036697280 scopus 로고    scopus 로고
    • On uncertainty, ambiguity, and complexity in project management
    • Pich M.T., Loch C.H., and de Meyer A. On uncertainty, ambiguity, and complexity in project management. Management Science 48 8 (2002) 1008-1023
    • (2002) Management Science , vol.48 , Issue.8 , pp. 1008-1023
    • Pich, M.T.1    Loch, C.H.2    de Meyer, A.3
  • 24
    • 0034313848 scopus 로고    scopus 로고
    • Time-cost trade-offs in overlapped production development
    • Roemer T., Ahmadi R., and Wang R. Time-cost trade-offs in overlapped production development. Operations Research 48 6 (2000) 858-865
    • (2000) Operations Research , vol.48 , Issue.6 , pp. 858-865
    • Roemer, T.1    Ahmadi, R.2    Wang, R.3
  • 25
    • 0028541986 scopus 로고
    • Managing the judgmental probability elicitation process: a case study of analyst/manager interaction
    • Shephard G., and Kirkwook C. Managing the judgmental probability elicitation process: a case study of analyst/manager interaction. IEEE Transactions on Engineering Management 41 4 (1994) 414-425
    • (1994) IEEE Transactions on Engineering Management , vol.41 , Issue.4 , pp. 414-425
    • Shephard, G.1    Kirkwook, C.2
  • 26
    • 0031084622 scopus 로고    scopus 로고
    • Identifying controlling features of engineering design iteration
    • Smith R., and Eppinger S. Identifying controlling features of engineering design iteration. Management Science 43 3 (1997) 276-293
    • (1997) Management Science , vol.43 , Issue.3 , pp. 276-293
    • Smith, R.1    Eppinger, S.2
  • 27
    • 0039184131 scopus 로고    scopus 로고
    • Product development process modeling
    • Smith R., and Morrow J. Product development process modeling. Design Studies 20 (1999) 237-261
    • (1999) Design Studies , vol.20 , pp. 237-261
    • Smith, R.1    Morrow, J.2
  • 28
    • 0019597497 scopus 로고
    • The design structure system: a method for managing the design of complex systems
    • Steward D.V. The design structure system: a method for managing the design of complex systems. IEEE Transactions on Engineering Management 28 3 (1981) 71-74
    • (1981) IEEE Transactions on Engineering Management , vol.28 , Issue.3 , pp. 71-74
    • Steward, D.V.1
  • 29
    • 0000381501 scopus 로고
    • A formal method for subjective design evaluation with multiple attributes
    • Thurston B. A formal method for subjective design evaluation with multiple attributes. Research in Engineering Design 3 (1991) 105-122
    • (1991) Research in Engineering Design , vol.3 , pp. 105-122
    • Thurston, B.1
  • 30
    • 67651185811 scopus 로고    scopus 로고
    • Use of design structure matrices for diagnosing activity process integration problems
    • Vienna University of Technology, Vienna, Austria
    • To, C., Harwood, R.J., Zhang, Z., 1999. Use of design structure matrices for diagnosing activity process integration problems. In: International DAAAM Symposium, Vienna University of Technology, Vienna, Austria, 1999.
    • (1999) International DAAAM Symposium
    • To, C.1    Harwood, R.J.2    Zhang, Z.3
  • 32
    • 0031094434 scopus 로고    scopus 로고
    • Social structure and competition in interfirm networks: the paradox of embeddedness
    • Uzzi B. Social structure and competition in interfirm networks: the paradox of embeddedness. Administrative Science Quarterly 42 1 (1997) 35-67
    • (1997) Administrative Science Quarterly , vol.42 , Issue.1 , pp. 35-67
    • Uzzi, B.1
  • 33
    • 0001546915 scopus 로고
    • Interdependence: an alternative conceptualization
    • Victor B., and Blackburn R.S. Interdependence: an alternative conceptualization. Academy of Management Review 12 3 (1987) 486-498
    • (1987) Academy of Management Review , vol.12 , Issue.3 , pp. 486-498
    • Victor, B.1    Blackburn, R.S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.