-
1
-
-
77953783229
-
-
last accessed on May 4, 2012
-
"Wind Powering America," http://www.windpoweringamerica.gov/ wind-installed-capacity.asp, last accessed on May 4, 2012.
-
Wind Powering America
-
-
-
4
-
-
33846656697
-
Reliability analysis for wind turbines
-
P. J. Tavner, J. Xiang, and F. Spinato, "Reliability analysis for wind turbines," Wind Energy, vol. 10, no.1, pp. 1-18, 2007.
-
(2007)
Wind Energy
, vol.10
, Issue.1
, pp. 1-18
-
-
Tavner, P.J.1
Xiang, J.2
Spinato, F.3
-
5
-
-
33947708442
-
Maintenance management of wind power systems using condition monitoring systems-life cycle cost analysis for two case studies
-
J. Nilsson and L. Bertling, "Maintenance management of wind power systems using condition monitoring systems-life cycle cost analysis for two case studies," IEEE Transactions on Energy Conversion, vol. 22, no. 1, pp. 223-229, 2007.
-
(2007)
IEEE Transactions on Energy Conversion
, vol.22
, Issue.1
, pp. 223-229
-
-
Nilsson, J.1
Bertling, L.2
-
6
-
-
78650718361
-
Condition-based maintenance optimization for wind power generation systems under continuous monitoring
-
Z. Tian, T. Jin, B. Wu, and F. Li, "Condition-based maintenance optimization for wind power generation systems under continuous monitoring," Renewable Energy, vol. 36, no. 5, pp. 1502-1509, 2011.
-
(2011)
Renewable Energy
, vol.36
, Issue.5
, pp. 1502-1509
-
-
Tian, Z.1
Jin, T.2
Wu, B.3
Li, F.4
-
9
-
-
0037333176
-
Joint optimization of block-replacement and periodic-review spare-provisioning policy
-
A. Brezavscek and A. Hudoklin, "Joint optimization of block-replacement and periodic-review spare-provisioning policy," IEEE Transactions on Reliability, vol. 52, no. 1, pp. 112-117, 2003.
-
(2003)
IEEE Transactions on Reliability
, vol.52
, Issue.1
, pp. 112-117
-
-
Brezavscek, A.1
Hudoklin, A.2
-
10
-
-
9444289306
-
Multi-objective spare parts allocation by means of genetic algorithms and Monte Carlo simulations
-
M. Marseguerra, E. Zio, and L. Podofillini, "Multi-objective spare parts allocation by means of genetic algorithms and Monte Carlo simulations," Reliability Engineering & System Safety, vol. 87, no. 3, pp. 325-335, 2005.
-
(2005)
Reliability Engineering & System Safety
, vol.87
, Issue.3
, pp. 325-335
-
-
Marseguerra, M.1
Zio, E.2
Podofillini, L.3
-
11
-
-
34548240633
-
Joint optimization of spare parts inventory and maintenance policies using genetic algorithms
-
M. A. Ilgin and S. Tunali, "Joint optimization of spare parts inventory and maintenance policies using genetic algorithms," The International Journal of Advanced Manufacturing Technology, vol. 34, no. 5/6, pp. 594-604, 2007.
-
(2007)
The International Journal of Advanced Manufacturing Technology
, vol.34
, Issue.5-6
, pp. 594-604
-
-
Ilgin, M.A.1
Tunali, S.2
-
12
-
-
79954505569
-
Optimization models for critical spare parts inventories-A reliability approach
-
D. Louit, R. Pascual, D. Banjevic, and A.K.S. Jardine, "Optimization models for critical spare parts inventories-A reliability approach," The Journal of Operational Research Society, vol. 62, pp. 992-1004, 2011.
-
(2011)
The Journal of Operational Research Society
, vol.62
, pp. 992-1004
-
-
Louit, D.1
Pascual, R.2
Banjevic, D.3
Jardine, A.K.S.4
-
13
-
-
80052718912
-
A stochastic model for joint spare parts inventory and planned maintenance optimization
-
W. Wang, "A stochastic model for joint spare parts inventory and planned maintenance optimization," European Journal of Operational Research, vol. 216, no. 1, pp. 127-139, 2012.
-
(2012)
European Journal of Operational Research
, vol.216
, Issue.1
, pp. 127-139
-
-
Wang, W.1
-
14
-
-
79951611402
-
Impact of logistics on readiness and life cycle cost: A design of experiments approach
-
K. Kang and M. McDonald, "Impact of logistics on readiness and life cycle cost: a design of experiments approach," In Proceedings of Winter Simulation Conference, pp. 1336-1346, 2010.
-
(2010)
Proceedings of Winter Simulation Conference
, pp. 1336-1346
-
-
Kang, K.1
McDonald, M.2
-
15
-
-
77649338719
-
Optimization of component reliability in the design phase of capital goods
-
K.B. Öner, G.P. Kiesmüller, and G.J. van Houtum, "Optimization of component reliability in the design phase of capital goods," European Journal of Operational Research, vol. 205, no. 3, pp. 615-624, 2010.
-
(2010)
European Journal of Operational Research
, vol.205
, Issue.3
, pp. 615-624
-
-
Öner, K.B.1
Kiesmüller, G.P.2
Van Houtum, G.J.3
-
16
-
-
84865785629
-
Planning performance based contracts considering reliability and uncertain system usage
-
In Press
-
T. Jin and P. Wang, "Planning performance based contracts considering reliability and uncertain system usage," Journal of the Operational Research Society, In Press, 2012.
-
Journal of the Operational Research Society
, vol.2012
-
-
Jin, T.1
Wang, P.2
-
18
-
-
33744522630
-
A simplified wind power generation model for reliability evaluation
-
R. Karki, P. Hu, and R. Billinton, "A simplified wind power generation model for reliability evaluation," IEEE Transactions on Energy Conversion, vol. 21, no. 2, pp. 533-540, 2006.
-
(2006)
IEEE Transactions on Energy Conversion
, vol.21
, Issue.2
, pp. 533-540
-
-
Karki, R.1
Hu, P.2
Billinton, R.3
-
19
-
-
36348957426
-
Impact of the wind geographical correlation level for reliability studies
-
F. Vallee, J. Lobry, and O. Deblecker, "Impact of the wind geographical correlation level for reliability studies," IEEE Transactions on Power Systems, vol. 22, no. 4, pp. 2232-2239, 2007.
-
(2007)
IEEE Transactions on Power Systems
, vol.22
, Issue.4
, pp. 2232-2239
-
-
Vallee, F.1
Lobry, J.2
Deblecker, O.3
-
20
-
-
0027664152
-
Control by variable rotor speed of a fixed-pitch wind turbine operating in a wide speed range
-
T. Thiringer and J. Linders, "Control by variable rotor speed of a fixed-pitch wind turbine operating in a wide speed range," IEEE Transaction on Energy Conversion, vol. 8, no. 3, pp. 520-526, 1993.
-
(1993)
IEEE Transaction on Energy Conversion
, vol.8
, Issue.3
, pp. 520-526
-
-
Thiringer, T.1
Linders, J.2
-
23
-
-
42149186975
-
Wind turbine design cost and scaling model
-
L. Fingersh, M. Hand, and A. Laxson, "Wind turbine design cost and scaling model," National Renewable Energy Lab, Technical Report, 2006.
-
(2006)
National Renewable Energy Lab, Technical Report
-
-
Fingersh, L.1
Hand, M.2
Laxson, A.3
-
24
-
-
74849132745
-
A multi-objective decision making on reliability growth planning for in-service systems
-
T. Jin and H. Wang, "A multi-objective decision making on reliability growth planning for in-service systems," In Proceedings of IEEE Conference on Systems, Man and Cybernetics, pp. 4677-4683, 2009.
-
(2009)
Proceedings of IEEE Conference on Systems, Man and Cybernetics
, pp. 4677-4683
-
-
Jin, T.1
Wang, H.2
|