메뉴 건너뛰기




Volumn 63, Issue 10, 2012, Pages 1467-1478

Planning performance based contracts considering reliability and uncertain system usage

Author keywords

performance based contracting; performance based outcome; post production support; power by the hour; reliability; service parts logistics

Indexed keywords

DECISION SUPPORT SYSTEMS; FAILURE ANALYSIS; LIFE CYCLE; RELIABILITY; REPAIR; UNCERTAIN SYSTEMS;

EID: 84865785629     PISSN: 01605682     EISSN: 14769360     Source Type: Journal    
DOI: 10.1057/jors.2011.144     Document Type: Article
Times cited : (55)

References (30)
  • 1
    • 0000700776 scopus 로고
    • Modelling emergency lateral transshipments in inventory systems
    • Axsäter S (1990). Modelling emergency lateral transshipments in inventory systems. Management Science 36(11): 1329-1338.
    • (1990) Management Science , vol.36 , Issue.11 , pp. 1329-1338
    • Axsäter, S.1
  • 2
    • 0036132450 scopus 로고    scopus 로고
    • Computing small-fleet aircraft availabilities including redundancy and spares
    • DOI 10.1016/S0305-0548(00)00094-0, PII S0305054800000940
    • Cochran JK and Lewis TP (2002). Computing small-fleet aircraft availabilities including redundancy and spares. Computers and Operations Research 29(5): 529-540. (Pubitemid 33098649)
    • (2002) Computers and Operations Research , vol.29 , Issue.5 , pp. 529-540
    • Cochran, J.K.1    Lewis, T.P.2
  • 3
    • 4544229131 scopus 로고    scopus 로고
    • System optimization considering component reliability estimation uncertainty: A multi-criteria approach
    • Coit DW, Jin T and Wattanapongsakorn N (2004). System optimization considering component reliability estimation uncertainty: A multi-criteria approach. IEEE Transactions on Reliability 53(3): 369-380.
    • (2004) IEEE Transactions on Reliability , vol.53 , Issue.3 , pp. 369-380
    • Coit, D.W.1    Jin, T.2    Wattanapongsakorn, N.3
  • 4
    • 0004091408 scopus 로고    scopus 로고
    • Chapter 9, Addison Wesley Longman Publisher: Reading, MA
    • Elsayed EA (1996). Reliability Engineering. Chapter 9, Addison Wesley Longman Publisher: Reading, MA.
    • (1996) Reliability Engineering
    • Elsayed, E.A.1
  • 5
    • 0022146583 scopus 로고
    • A multi-echelon inventory model for a repairable item with one-for-one replenishment
    • Graves SC (1985). A multi-echelon inventory model for a repairable item with one-for-one replenishment. Management Science 31(10): 1247-1256.
    • (1985) Management Science , vol.31 , Issue.10 , pp. 1247-1256
    • Graves, S.C.1
  • 6
    • 0022208326 scopus 로고
    • Branch and bound experiments in convex nonlinear integer programming
    • Gupta OK and Ravindran A (1985). Branch and bound experiments in convex nonlinear integer programming. Management Science 31(12): 1533-1546. (Pubitemid 16488951)
    • (1985) Management Science , vol.31 , Issue.12 , pp. 1533-1546
    • Gupta, O.K.1    Ravindran, A.2
  • 8
    • 59049099709 scopus 로고    scopus 로고
    • Spare parts inventory control considering stochastic growth of an installed base
    • Jin T and Liao H (2009). Spare parts inventory control considering stochastic growth of an installed base. Computers & Industrial Engineering 56(1): 452-460.
    • (2009) Computers & Industrial Engineering , vol.56 , Issue.1 , pp. 452-460
    • Jin, T.1    Liao, H.2
  • 9
    • 79951611402 scopus 로고    scopus 로고
    • Impact of logistics on readiness and life cycle cost: A design of experiments approach
    • S. Johansson, J. Montoya-Torres, J. Hugan, and E. Yü cesan(eds IEEE Xplore database
    • Kang K and McDonald M (2010). Impact of logistics on readiness and life cycle cost: A design of experiments approach. In: S. Johansson, J. Montoya-Torres, J. Hugan, and E. Yü cesan(eds.) Proceedings of Winter Simulation Conference, IEEE Xplore database, pp 1336-1346.
    • (2010) Proceedings of Winter Simulation Conference , pp. 1336-1346
    • Kang, K.1    McDonald, M.2
  • 10
    • 38549086460 scopus 로고    scopus 로고
    • Performance contracting in after-sales service supply chains
    • DOI 10.1287/mnsc.1070.0741
    • Kim SH, Cohen MA and Netessine S (2007). Performance contracting in after-sales service supply chains. Management Science 53(12): 1843-1858. (Pubitemid 351159559)
    • (2007) Management Science , vol.53 , Issue.12 , pp. 1843-1858
    • Kim, S.-H.1    Cohen, M.A.2    Netessine, S.3
  • 13
    • 0023436887 scopus 로고
    • A multi-echelon inventory model for repairable items with emergency lateral transshipments
    • Lee HL (1987). A multi-echelon inventory model for repairable items with emergency lateral transshipments. Management Science 33(10): 1302-1316.
    • (1987) Management Science , vol.33 , Issue.10 , pp. 1302-1316
    • Lee, H.L.1
  • 14
    • 0033116086 scopus 로고    scopus 로고
    • Incorporating learning curve costs in acquisition strategy optimization
    • Loerch AG (1999). Incorporating learning curve costs in acquisition strategy optimization. Naval Research Logistics 46: 255-271.
    • (1999) Naval Research Logistics , vol.46 , pp. 255-271
    • Loerch, A.G.1
  • 15
    • 9444289306 scopus 로고    scopus 로고
    • Multiobjective spare part allocation by means of genetic algorithms and Monte Carlo simulations
    • Marseguerra M, Zio E and Podofillini L (2005). Multiobjective spare part allocation by means of genetic algorithms and Monte Carlo simulations. Reliability Engineering and System Safety 87(3): 325-335.
    • (2005) Reliability Engineering and System Safety , vol.87 , Issue.3 , pp. 325-335
    • Marseguerra, M.1    Zio, E.2    Podofillini, L.3
  • 18
    • 0015768797 scopus 로고
    • A model for a multi-item, multi-echelon, multi-indenture inventory system
    • Muckstadt JA (1973). A model for a multi-item, multi-echelon, multi-indenture inventory system. Management Science 20(4): 472-481.
    • (1973) Management Science , vol.20 , Issue.4 , pp. 472-481
    • Muckstadt, J.A.1
  • 19
    • 40249098895 scopus 로고    scopus 로고
    • Spares provisioning under performance-based logistics contract: Profit-centric approach
    • DOI 10.1057/palgrave.jors.2602327, PII 2602327
    • Nowicki D, Kumar UD, Steudel HJ and Verma D (2008). Spares provisioning under performance-based logistics contract: Profitcentric approach. The Journal of the Operational Research Society 59(3): 342-352. (Pubitemid 351334697)
    • (2008) Journal of the Operational Research Society , vol.59 , Issue.3 , pp. 342-352
    • Nowicki, D.1    Kumar, U.D.2    Steudel, H.J.3    Verma, D.4
  • 20
    • 0038245167 scopus 로고    scopus 로고
    • Managing the transition from products to services
    • DOI 10.1108/09564230310474138
    • Oliva R and Kallenberg R (2003). Managing the transition from products to services. International Journal of Service Industry Management 14(2): 160-172. (Pubitemid 36614408)
    • (2003) International Journal of Service Industry Management , vol.14 , Issue.2 , pp. 160-172
    • Oliva, R.1    Kallenberg, R.2
  • 22
    • 84923391783 scopus 로고    scopus 로고
    • Evolving a theory of performance-based logistics using insights from service dominant logic
    • RandallWS, Pohlen TL and Hanna JB (2010). Evolving a theory of performance-based logistics using insights from service dominant logic. Journal of Business Logistics 31(2): 35-62.
    • (2010) Journal of Business Logistics , vol.31 , Issue.2 , pp. 35-62
    • Randall, W.S.1    Pohlen, T.L.2    Hanna, J.B.3
  • 23
    • 34250200757 scopus 로고    scopus 로고
    • Use of R&M measures in Australian defence aerospace performance based contracts
    • DOI 10.1109/RAMS.2006.1677396, 1677396, Annual Reliability and Maintainability Symposium, RAMS'06 - 2006 Proceedings
    • Richardson D and Jacopino A (2006). Use of R&M measures in Australian defense aerospace performance based contracts. Proceedings of Reliability and Maintainability Symposium, IEEE Xplore database, pp 331-336. (Pubitemid 46900289)
    • (2006) Proceedings - Annual Reliability and Maintainability Symposium , pp. 331-336
    • Richardson, D.1    Jacopino, A.2
  • 24
    • 0000946660 scopus 로고
    • METRIC: A multi-echelon technique for recoverable item control
    • Sherbrooke CC (1968). METRIC: A multi-echelon technique for recoverable item control. Operations Research 16(1): 122-141.
    • (1968) Operations Research , vol.16 , Issue.1 , pp. 122-141
    • Sherbrooke, C.C.1
  • 25
    • 84989738069 scopus 로고
    • Multiechelon inventory systems with lateral supply
    • Sherbrooke CC (1992). Multiechelon inventory systems with lateral supply. Naval Research Logistics 39(1): 29-40.
    • (1992) Naval Research Logistics , vol.39 , Issue.1 , pp. 29-40
    • Sherbrooke, C.C.1
  • 27
    • 38549161835 scopus 로고    scopus 로고
    • US Department of Defense US Department of Defense, Washington, DC accessed 22 November 2011
    • US Department of Defense (2005). DoD guide for achieving reliability, availability, and maintainability. US Department of Defense, Washington, DC, http://www.acq.osd.mil/dte/docs/RAM-Guide-080305.pdf, accessed 22 November 2011.
    • (2005) DoD Guide for Achieving Reliability, Availability, and Maintainability
  • 28
    • 0001571885 scopus 로고    scopus 로고
    • Go downstream: The new imperative in manufacturing
    • Wise R and Baumgartner P (1999). Go downstream: The new imperative in manufacturing. Harvard Business Review 77(5): 133-141.
    • (1999) Harvard Business Review , vol.77 , Issue.5 , pp. 133-141
    • Wise, R.1    Baumgartner, P.2
  • 29
    • 31144476950 scopus 로고    scopus 로고
    • Multi-item spare parts systems with lateral transshipments and waiting time constraints
    • DOI 10.1016/j.ejor.2005.01.018, PII S037722170500127X, Feature Cluster: Heuristic and Stochastic Methods in Optimization
    • Wong H, van Houtum GJ, Cattrysse D and van Oudheusden D (2006). Multi-item spare parts systems with lateral transshipments and waiting time constraints. European Journal of Operational Research 171(3): 1071-1093. (Pubitemid 43132964)
    • (2006) European Journal of Operational Research , vol.171 , Issue.3 , pp. 1071-1093
    • Wong, H.1    Van Houtum, G.J.2    Cattrysse, D.3    Van Oudheusden, D.4
  • 30
    • 67649414202 scopus 로고    scopus 로고
    • A squeeze response surface methodology for finding symbolic network reliability functions
    • Yeh W-C and Lin C-H (2009). A squeeze response surface methodology for finding symbolic network reliability functions. IEEE Transactions on Reliability 58(2): 374-382.
    • (2009) IEEE Transactions on Reliability , vol.58 , Issue.2 , pp. 374-382
    • Yeh, W.-C.1    Lin, C.-H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.